Summary
Overview
Work History
Education
Skills
Affiliations
References
Training
Summaryofqualificationsandexperience
Software
Certification
Timeline
Hi, I’m

Muhammad Usman Rabbani

Mechanical Engineer
Rawalpindi Cantt
Muhammad Usman Rabbani

Summary

Highly organized and dependable candidate skilled in effectively managing multiple priorities with a positive attitude. Proven track record of success in assuming additional responsibilities to achieve team goals. Committed to excellence, ready to contribute skills and dedication to drive success in a dynamic work environment.

Overview

2021
years of professional experience
1992
years of post-secondary education
1
Certification
3
Languages

Work History

Pak Gulf Construction (Pvt) Ltd

Centaurus

Job overview

  • Project
  • Project: - The Centaurus Tower-B Residential Apartment Building, Islamabad - Supervised , Managed and Developed the following ;
  • Study all MEP services concept design and develop the detail design drawings accordingly and issued for construction purpose
  • These are included as; Domestic water pump room piping diagram Domestic water pipe risers , distribution, and apartment supply lines Natural Gas piping, gas header, gas riser lines and ancillaries Natural Gas consumer metering station Fire Fighting pump room piping diagram & controls Fire Sprinklers & hydrant lines, flow switches, zone control valves their placement in line etc
  • Etc
  • Rain water lines from top to storage tanks Foul water line from apartment to sewer lines and pits ASP lines and floor drains on whole of building area HVAC system, design review, installation of equipment, testing and commissioning Basement ventilation system with fire smoke dampers, Induced jet fans, CO sensors BMU as per building requirement, design of track, and installation methodologies Installation, Operation, and Maintenance of Vertical
  • Transporters

HVAC

Job overview

  • (Heating, Ventilation and Air Conditioning):-
  • Experienced in Central Plant, Package unit and Split Air-conditioning unit installation works, also comprising planning, scheduling, CHW(Chilled
  • Water) Pipe Design & Sizing (ASHRAE), ESP (Estimated Static Pressure)
  • Calculation, Pump Head Calculation, Material Submittal preparation
  • Materials & Fittings take off and Execution of Installation, Testing &
  • Commissioning of Air Handling Unit with Heat Recovery Wheel, Fan Coil
  • Units, Ventilation Fans, Air washers, Air Curtains, Package Unit, Chillers
  • CHW Pumps, BMS (Building Management System) Control and Control
  • Valves etc
  • Construction of Pre-fabricated Buildings such as Administration Block
  • Workshop, Fuel Treatment Buildings, its electrification, Sanitary Works
  • Plumbing work
  • Erection, & Commissioning of Cooling Towers its piping & allied pumps
  • Erection, Installation and Ducting works in Administration and Control
  • Room of Package type HVAC equipment
  • Construction, Civil Works, of 200MW CCPP (Client Wartsila Pakistan/ Nishat

Power Plant Ltd)

Job overview

  • Supervised & managed the following;
  • Erection & Construction of Pre-Fabricated Production & Administration
  • Buildings, its Electrification and Finishing works, Installation of Sanitary &
  • Plumbing activities
  • Erection, & Commissioning of Cooling Towers its piping & allied pumps
  • Drainage and Sewerage lines for waste materials
  • Erection, Installation of Package type HVAC Units, its Ducting & Insulation work
  • Electro-mechanical Erection, Piping, Electrical, Instrumentation works and calibration, testing, pre-commissioning and commissioning activities were part of
  • Etimaad’s scope of work in Early Gas Gathering Adam X-1 Facility, owned by

Pakistan Petroleum Limited

Job overview

  • (PPL) in 5
  • (Client Weatherford Oil Tools
  • Inc.)
  • Supervised & managed the following;
  • Erection, Installation of equipment & plant along with testing & calibration of instruments, Gauges (on Dead weight Tester)
  • Fabrication of pipe spools as per Isometric drawings, construction and testing of piping as per specification
  • Uch Gas Annual Turnaround, Scope of work includes cleaning of vessels and heat exchangers maintenance work of all rotary equipment, electrical motors, and calibration of equipment at the gas treatment plant, dehydration units, water treatment plant and utilities
  • (Client was OGDCL, owners and operators of the
  • Uch gas field)
  • Supervised and managed the following;
  • Cleaning of Vessels & Heat Exchangers by Hydro-Jetting
  • Maintenance of Rotary Equipments, like pumps, motors, compressors etc
  • Checking Cleaning and maintenance of power panels, L.T
  • Panels
  • EPC works at Dawood Hercules Chemicals Limited (DHCL)
  • Fabrication and construction of 4000 metric tons double integrated anhydrous ammonia storage tank storage and handling facility at the plant site
  • Civil & Mechanical works followed by the award of fabrication and erection of steel structure, as a part of the mechanical contract
  • (Client Proctor and Gamble (P&G) at their “Arial” drypowder detergent plant in Port Qasim Karachi

Meinhardt Pakistan (Pvt) Ltd, Emaar Pakistan (Pvt) Ltd

Manager MEP
7 2020 - 2 2021

Job overview

  • Pakistan Regional Dispatch Center, China Gezhouba Group Company (CGGC) a subsidiary company of China Energy Engineering Group Design review, Construction management & Site supervision of 2 nos
  • Buildings each having a basement and 10 stories., Supervision, Design review of Infrastructure, and MEP works of 25 Villas
  • Design review, recommended changes in some schematic design of services in the infrastructure and MEP works in 25 villas of different sizes along with supervision & approvals of works.

Bahria Town (Pvt) Ltd

Manager MEP
02.2016 - 05.2020

Job overview

  • Hotel Design Wing, BGC Project

Grand Hyatt Resort & Hotel

MEP Design Engineer
07.2014 - 02.2016

Job overview

  • Bahria Golf City, Murree Expressway Islamabad - Supervised , Managed and Developed the following;
  • Study & reviewed all MEP services concept design, schematic design, point out the shortcomings and developed many proposals in all discipline of MEP as per H.I.T.S for final detail design drawings
  • These are included as; Developed schematic design of plant room partially inside and partially outside the main building with architectural development providing all provisions such as ventilation, overhead crane and process piping required for equipment Developed schematic design of Cooling towers outside the main building with its piping Developed schematic design of quick steam generators with its piping Developed schematic design of fuel storage tanks Developed schematic design of LPG storage station Developed schematic design of chillers & their pumps inside the main building Developed schematic design of LT & HT rooms with synchronization panels Developed schematic design of HVAC requirement for ballroom & junior ballroom restoring the original roof garden landscape Builders works design of exterior lighting at pool deck Builders works design of water supply, recirculation & drainage of pools at pool deck Builders work design of FD and soil drain of planters at Pool deck level Developed schematic design of ball room roof garden FD & soil drain system Developed schematic design of exterior lighting of roof garden area Developed schematic design of water supply and storm water drain system at porte cochere Developed schematic design of gas lines, exterior lighting and infra-structure works around the hotel building

Habib Rafiq (Pvt) Ltd, Sheraton

Planning & MEP Manager
03.2012 - 07.2014

Job overview

  • Islamabad Golf City Resort, Bahria Golf City, Expressway Islamabad - Supervised and Managed the following;
  • Develop & Schedule the Project Plan with WBS tables, Monitor & Review of, Relations, Resources, Baseline program of works, and got approvals in changes/ variation reports and Recovery for the Updating Program to recover any Delay happened in Revised Program/ Claims, Variation
  • Orders
  • Loading/Tracing of Resources & progress payments then updating all statistics (Actual Vs Planned)
  • Following up & Monitoring of Duties & Tasks of the Engineer / Sub- contractor as per Schedule & Scope of Work
  • Review and Monitoring of progress payments
  • Review of MEP Drawings and Design and supervision of MEP works executed.

E.A. Consulting (Pvt) Ltd

MEP Engineer
07.2010 - 03.2012

Job overview

  • Canyon View Housing Development Project,“EMAAR PAKISTAN” Islamabad - Supervised and managed the following;
  • Plumbing(Water Supply, Drainage and Storm water):-
  • Workshop Drawing and material submittal review, Pump Head calculations, Water Heater and sanitary items selection, loading Unit
  • Calculations & Pipe Sizing, Materials, Fittings and Valves quantity take off and Execution for Installation, Testing and Commissioning of Water supply
  • Pipeline, Drainage Pipe Line, Storm Water Pipeline, Water Tank, Water
  • Heater, Booster Pump, Transfer Pump
  • Deep services U/G, includes Sewerage lines, Strom water lines, Water
  • Supply/ Irrigation and electrification work for street lights
  • Inspection and testing of Utilities pipe lines inside the Townhouses, complying the specification and designs
  • Fire Fighting (Sprinkler System, Hose reel )
  • Workshop Drawing Preparation, Pump Head calculation, Materials
  • Fittings & Valves quantity take off, Execution of Installation, Testing &
  • Commissioning of GI Pipeline, Sprinkler, Hose reel, Dry Risers, Wet Risers
  • Foam System, Halogenated Extinguishing Agent Systems & Fire Pumps (as per Civil Defense Regulations & standard )

Etimaad Engineering (Pvt) Ltd

Project Support Services Engineer
02.2009 - 06.2010

Job overview

  • Project:
  • Construction of CCPP - Construction, Assembling & Erection of HRSG , GE Gas Turbines, Siemens Steam
  • Turbine Piping, & E&I of 225 MW CCPP at Head Balloki, District Kasur (Client
  • Albario Engineering/ Orient Energy (Pvt) Ltd
  • Supervised and managed the following;
  • Pipe Fabrication Shop, Pneumatic & Hydraulic Testing of pipe lines, Pre- &
  • Post Weld Heat Treatment of Power Pipe lines of Steam Turbine
  • Laying of Earth wire Network, Communication cables laying , its testing & commissioning work, Control room cable work, CCT circuits works testing & commissioning, L.T
  • Distribution Boxes, Installation of feeder Pillar for lights, Street Lights Poles, Lamps & related Work
  • Erection & Construction of Pre-Fabricated Production & Administration
  • Buildings, its Electrification and Finishing works, Installation of Sanitary &
  • Plumbing activities
  • Construction, Civil Works, Erection & Installation of Equipments, Rigging &
  • Installation of Wartsila Engines & Alternators, Pre-commissioning activities of 200
  • MW CCPP (ClientWartsila Pakistan/ Nishat Chunian Power Ltd)
  • Supervised and managed the followings;

Etimaad Engineering (Pvt) Ltd

Project Support Services Engineer
10.2007 - 01.2009

Job overview

  • Construction, Erection, Piping, Civil Works & Pre-commissioning of
  • Wartsila-AGL 160 MW CCPP at Rawalpindi Cantt
  • Supervised and managed the followings;
  • Developed the project construction schedule (P6) based upon standard construction sequencing used in previous combined cycle power plants constructed with similar energy output, as well as job site specific design criteria
  • Submit monthly Construction progress curves and progress reports for the client (Wartsila)
  • Pipe Fabrication Shop, Pneumatic & Hydraulic Testing of pipe lines
  • Pickling, Neutralizing and Preservation of Fuel Lines
  • Laying of Earth wire Network in Grid station, Erection of Pad Mounted
  • Transformers, L.T
  • Distribution Boxes, Installation of feeder Pillar for lights
  • Street Lights Poles, Lamps & related Work
  • Erection & Construction of Pre-Fabricated Production & Administration
  • Buildings, its Electrification and Finishing works, Installation of Sanitary &
  • Plumbing activities
  • Erection, Installation of Package type HVAC Units, its Ducting & Insulation work
  • Project Material handling and all report writings related to Progress and
  • Quality Assurance, Safety etc
  • Equipment & Plant, its maintenance & Optimum Utilization
  • Project Procurements, Stores, Administration.

Descon Engineering Ltd

Senior Field Engineer
01.2006 - 01.2007

Job overview

  • Construction of Motor-way M-1 by Utilizing Heavy Construction Equipment
  • Responsible for the Procurement of Spares, Maintenance, Repairs, &
  • Utilization of all heavy Equipment & Plants at MotorwaysM-1 project consist of Excavators, Motor Graders, Wheel Loaders, Dump Trucks
  • Power Generators, Concrete Pumps (Mobile & Stationary), Transit Mixers
  • Concrete Batching Plants, Aggregate Base Mixing Plant, Crush Plants, Rock
  • Drilling Machines, PTR Rollers, Single & Tandem Road Rollers, Asphalt
  • Laying Machines, Asphalt Cutters etc
  • Etc
  • Hands-on experience in trouble shooting and maintenance/repairs of pumps and compressors
  • Upgraded and maintained Asphalt Laying Machinery comprise of Asphalt
  • Paving Machines, Rollers and Cutting Machines
  • Supervised operations of Aggregate Base Mixing Plant, Concrete Batch
  • Plants, Chiller Plants, Concrete Transit Mixers, Concrete Pumps and Crush
  • Plants
  • Maintenance & Repairs of Rock Drill Machines both Hydraulic and
  • Pneumatic
  • Monitoring of equipments actual performances against rated capacity and implementation of efficiency improvement measures
  • Preparation of weekly and monthly maintenance progress report of the preventive maintenance
  • Identifying, focusing on and resolving technically related equipment risks, which adversely affect performance, safety, long-term process control and equipment integrity and plant productivity
  • Timely resolution of advanced technical issues prior to start up activities
  • Preparation of Scope of Work, Design Base Memorandum, Engineering
  • Design Specifications, Detail Designing and Material Requests
  • Engineering and technical review of Engineering packages from EPC consultants
  • Ensuring Technical Policies; standards and practices are complied with
  • ANSI, ASME, API, AWI, NFPA, IRI and Company’s Standards
  • Conducted technical and engineering trainings for group of Engineers
  • Commissioning, Start Up
  • Planning and execution of pre-commissioning and start up activities for
  • Plants and Facilities
  • Supervised a team of Engineers for commissioning and start up activities
  • Identified and defined opportunities for plant and system improvements
  • Project Controlling of major deliverables from Engineering Work Request through Scope Study, Engineering Design Specifications, HAZOP, Detail
  • Designing, and Work package (ISO and P&ID) for construction
  • Commissioning and start up, Project closure and review analysis
  • Coordination with Engineering consultants and validation of contract documents.

Education

University of Engineering & Technology

B. Sc. from Mechanical Engineering

Skills

Friendly, Positive Attitude

Affiliations

Pakistan Engineering Council, Mech. /10422, Professional Engineer, 08/01/21 to present

References

Available on request

Training

  • Hydraulic–Electro Hydraulic Controls, Staff Training Institute Gulberg Lahore
  • HSE for Line Managers, Descon
  • Management Development Program, HRD Department at Descon Head Quarters
  • Total Quality Management, The Institute of Engineers, Pakistan

Summaryofqualificationsandexperience

  • Mechanical Engineer with over 29 years of versatile professional expertise in Project Management, Planning & Scheduling, MEP work in Construction Industry, Maintenance & Reliability engineering of Rotating Equipment, Detail Designing of Pipeline, Electro-Mechanical works, Construction Projects and Start up & Commissioning of projects.
  • Engineering Management of the projects from design, construction, and startup commissioning of manufacturing plants and facilities.
  • Accomplishments cover Start up and Commissioning of Infrastructure Projects.
  • Hands on experience of process piping designing, power piping designing and pressure vessel codes.
  • Troubleshooting, preventive maintenance programs, maintenance and reliability of centrifugal compressors, all type of pumps, and turbines.
  • Self-motivated in a team environment, demonstrated leadership, dependability, communication skill and possess strong interpersonal skills. Adherence to ensure work environment conforms to safety requirements.

Software

Primavera

Certification

Hydraulic-Electrohydraulic controls by staff training institute Lahore Gulberg.

Timeline

Manager MEP

Bahria Town (Pvt) Ltd
02.2016 - 05.2020

MEP Design Engineer

Grand Hyatt Resort & Hotel
07.2014 - 02.2016

Planning & MEP Manager

Habib Rafiq (Pvt) Ltd, Sheraton
03.2012 - 07.2014

MEP Engineer

E.A. Consulting (Pvt) Ltd
07.2010 - 03.2012

Project Support Services Engineer

Etimaad Engineering (Pvt) Ltd
02.2009 - 06.2010

Project Support Services Engineer

Etimaad Engineering (Pvt) Ltd
10.2007 - 01.2009

Senior Field Engineer

Descon Engineering Ltd
01.2006 - 01.2007

Centaurus

Pak Gulf Construction (Pvt) Ltd

HVAC

Power Plant Ltd)

Pakistan Petroleum Limited

Hydraulic-Electrohydraulic controls by staff training institute Lahore Gulberg.

Manager MEP

Meinhardt Pakistan (Pvt) Ltd, Emaar Pakistan (Pvt) Ltd
7 2020 - 2 2021

University of Engineering & Technology

B. Sc. from Mechanical Engineering
01.1992
Muhammad Usman RabbaniMechanical Engineer