Summary
Overview
Work History
Timeline
Generic
Zulfiqar Uddin

Zulfiqar Uddin

Summary

Determined Assistant Engineer with strong team collaboration skills. Proficient in working with operating equipment and machines, Adept at reading blueprints and drawings.

Overview

26
26
years of professional experience

Work History

Assistant Engineer

K-ELECTRIC
Karachi
08.2004 - Current
  • working as recovery supervisor
  • worked as Protection Supervisor installation/replacement of protection Relays (FANOX & MICOM) as per given drawings
  • Worked as Site Supervisor of Annul Preventive Maintenances for Sub-Stations And PMTs including HT / LT switch Gears and OH distribution lines
  • worked as Site supervisor of laying excavation of HT/LT cables their joints terminations and installation of their respective panels and switch gears
  • worked as shift in-charge of Complaints control room handing and care taking of several complaints teams

Project Supervisor

International Industries Ltd
Karachi
09.2001 - 08.2004
  • Fault finding and trouble shooting of Cold Rolling Mill Machinery
  • Planing and record keeping of Preventive Maintenance
  • Execution of new projects


Shift Officer

National Fibers Ltd
Karachi
03.1996 - 07.2001
  • Fault finding and trouble shooting in electrical power and control circuits of miscellaneous electrial panels
  • look after MCCs and Transformer rooms
  • Look AfterRing mains based HT switch gear room and their operations


Timeline

Assistant Engineer

K-ELECTRIC
08.2004 - Current

Project Supervisor

International Industries Ltd
09.2001 - 08.2004

Shift Officer

National Fibers Ltd
03.1996 - 07.2001
Zulfiqar Uddin