Determined Assistant Engineer with strong team collaboration skills. Proficient in working with operating equipment and machines, Adept at reading blueprints and drawings.
Overview
26
26
years of professional experience
Work History
Assistant Engineer
K-ELECTRIC
Karachi
08.2004 - Current
working as recovery supervisor
worked as Protection Supervisor installation/replacement of protection Relays (FANOX & MICOM) as per given drawings
Worked as Site Supervisor of Annul Preventive Maintenances for Sub-Stations And PMTs including HT / LT switch Gears and OH distribution lines
worked as Site supervisor of laying excavation of HT/LT cables their joints terminations and installation of their respective panels and switch gears
worked as shift in-charge of Complaints control room handing and care taking of several complaints teams
Project Supervisor
International Industries Ltd
Karachi
09.2001 - 08.2004
Fault finding and trouble shooting of Cold Rolling Mill Machinery
Planing and record keeping of Preventive Maintenance
Execution of new projects
Shift Officer
National Fibers Ltd
Karachi
03.1996 - 07.2001
Fault finding and trouble shooting in electrical power and control circuits of miscellaneous electrial panels
look after MCCs and Transformer rooms
Look AfterRing mains based HT switch gear room and their operations