Summary

  • I have performed my duties in three different Mega Projects Currently I’m working with the O&M project “Orange line metro train Lahore – (OLMRTS)” as a Quality Assurance Engineer since Nov, 2020.
  • Before that I worked with REDCO International in Qatar for Doha Metro Green Line Underground Project for package-1, 2 & 3 including Tunnel work construction in Electrical role for three years. I have given four quality inspectors to complete my responsibilities and we gave our best to the company from start to handing over - Qatar Rail Company client, I myself and my team had proved our abilities and delivered successfully, the different phases of constriction from Execution to testing and commissioning – (T&C). We handed over three Major sites “Al-Massila Station, Hamad Hospital Station and White Palace Station including tunnel work to the client Qatar Rail Company by closing 3500 Snags/issues related to the sites utilizing the sources of construction teams.
  • Thirdly, I was working with the contacting company known as “Power Professional & Engineering for Maragala Building Telenor Head office in Islamabad, Pakistan as an Electrical Supervisor responsible for execution and testing of electrical services and equipment’s.


Overview

8
8
years of professional experience
9
9
years of post-secondary education
3
3
Languages

Work History

Jr. Quality Assurance Engineer – (QA)

Orang line Metro Train Project, Lahore – (OLMRTS)
Lahore
11.2020 - Current

Job Descriptions:

  • Conduct O&M inspection and Implement Safe System of Work (SSoW) and safety regulations.
  • Take the lead in the day-to-day operations of the SCADA system and distribution control centre.
  • Led to mitigate the issues by coordinating with the relevant departments such as Track, E&M system- (Electromechanical Equipment), Power Transition, Third Rail, Communication & Signalling to avoid the penalties from client.
  • To ensure contractual “key performance indicators- KPIs”
  • Investigates the failures of “Electromechanical Equipment’s” such as “Elevators Escalator, Passenger sliding doors – (PSDs), HVAC, VRV, Feed water Pumps, turnouts, switch machines, water supply and drainage services – (WSD). firefighting equipment and fir-extinguishers, indoor 132/33KV Gas insulated sub-station – (GIS), 33/0.4 KV indoor sub-stations.
  • Reporting on Incidents and Accidents of O&M disruption events for Continuous Improvement of Equipment Quality and safety.
  • Responsible for checking records of “Operation & Maintenance Equipment” on weekly, bi-weekly, monthly, quarterly, semi-annually and annually.
  • Prepared the analytical data stats of departmental performances on a monthly basis and presented them to the senior management.
  • Implement the Compliance with Legal Requirements
  • Monitored the daily plan execution by the O&M department and provided cooperation.
  • Participate in internal and external audits.
  • Responsible to identify t Risk & Hazards Identification and providing control measures.
  • Fixed identified issues to increase productivity and boost workflows.
  • Assessed software bugs and compiled findings along with suggested resolutions for development team members.
  • Proposed development and testing improvements to positively impact usability, function and performance.
  • Produced and maintained technical documentation for project reference.
  • Collaborated with developers and project managers to assess program capabilities, features and testing demands.
  • Trained and guided onsite and offshore team members in quality assurance standards, policies and procedures.
  • Worked with stakeholders and team members on quality assurance efforts for equipment & maintenance.
  • Met tight deadlines to satisfy client demands and project timelines.
  • Worked closely with different departments to develop innovative solutions to functionality issues.

QA/QC Engineer - Electrical

REDCO INTERNATIONAL W.L.L. Qatar
Doha
05.2016 - 01.2019
  • Devised and implemented best quality practices and processes for product development.
  • Reviewed and approved quality requirements for purchase orders and engineering specifications to meet contract compliance.
  • Interfaced with suppliers, inspectors and clients to resolve outstanding non-conformance issues prior to shipment.
  • Develop method statement for the activity, Inspection Test Plan and Checklist based on specifications of the project.
  • Responsible to carry out inspection and checking for all quality related procedures on the site and ensures activity at the site are as per approved method statement and inspection test plan.
  • Prepare, develop, review of material submittals MAR and MIRs.
  • Maintained electronic copies of records in [Aconex Software's ] to document completed inspections including “Certificates, Equipment Calibrations test results, Material approval Requests - (MAR), Material Inspections Requests (MIR), Delivery Notes – (DN), Payment Events Evaluations - (PEV), Site Observations- (SOR), Site Corrective Action reports - (SCR), Non-Conformities – (NCR’s), Internal and External Audits, Site Inspection Record – (SI), Construction Drawing and Specs, Design Verifications & Evaluations – (DVE), Material Inventory Record”.
  • Provide cooperation for the completion of (T&C) activities such as Partial Stand-Alone Tests (PSAT) & Stand-Alone Test of (SAT) for MCC, SMDB, DB, ATS, AHU, CRAC Units, FCU, according to approved method of Statements.
  • Torque testing of Anchor bolts and also Pull-out testing of Anchor bolts.
  • Testing the thickness of paint of firefighting pipes in paint yard by using of ELCO meter as per project specification.
  • Responsible to Waste Management & Store Management.
  • Responsible for the close-out of open Snags and preparing punch lists of all outstanding issues relevant to the construction site.
  • Attending the reconciliation meetings with consultant/PMC and Contractor quality management and Engineering team for closure of outstanding site related issues on weekly/monthly basis.
  • Preparation of complete quality verification file QVF of 1st fix 2nd fix and final fix installation (Electrical, Earthing and Fire alarm system) as scheduled for the purpose of payment events and external audit.
  • Carry out Internal Audit at the site as scheduled in the Project Quality Plan, PQP, successful close out of Clint/External Audits findings.
  • Familiar with international Codes of standards ISO 9001:2008, BS 7671, NFPA 70, NFPA72, NFPA 101, NFPA 130, NFPA 110, NFPA 170, NEMA, IEC, QCS 2010, KAHRAAMA and Doha
    Metro project specifications.
  • Prepared, documented and executed detailed test plans, test cases and defect reports.
  • Created work instructions for 300 person construction line, increasing productivity 90%.

Electrical Supervisor

POWER PROFESSIONALS & ENGINEERS
Islamabad
06.2015 - 04.2016
  • Responsible for the Installation of HT/LT panel, GENSET Panels, HT/LT Cables including IT & Data communication, lighting, Distribution Boards (DBs), Bus tie duct - (BTD), Cable Tray and Floor Trunk, PVC Conduits, Power switching & Isolators for high voltage motors, Fire Alarm system, public address/public Evacuation systems, Automatic control battery system – (ACBS)
  • Developed and maintained positive relationships with clients and other stakeholders.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Communicated with stakeholders on job milestones.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Evaluated and updated safety protocols to reduce risks on construction sites.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Installation of Internal building transmitting (IBTS) System for telecommunication system.
  • Responsible Testing of HT/LT Cables “Iinsulation, resistance, continuity of cables by using MAGER and digital meter.
  • Testing of Earthing by Earth test meter
  • Testing of HT/LT Cables “Iinsulation, resistance, continuity of cables by using MAGER and digital meter.

Education

Electrical Technology

Government Technical College - (GCT)
Sialkot
09.2008 - 08.2011

B. Tech (Pass) - Electrical Technology

NCBA&E LCU Campus
Lahore
09.2012 - 08.2014

BSc Electrical Engineering & Technology - Electrical Engineering & Technology

Superior University
Lahore
02.2019 - 03.2023

Skills

AutoCAD , Aconex web/software for Project Technical Documentation, Snag-R Web/software, Galaxy Suit Software for Electrical GSM meters remotely troubleshooting, ITMIS “Incident Tickets/Faults Management Information System” – web/Software, PSAT & SAT Testing of equipment’s, Microsoft Office Packages (Word, PowerPoint, Excel, Excellent report and presentation, Interpersonal and Management,

undefined

Software

Basic Autocad

Aconex

SnagR

ITMIS - Incident Ticket/Fault Information Managemnt System

Galaxy Suit Software for Electrical GSM - Meters Remotely Troubleshooting

Basic Primavera

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Jr. Quality Assurance Engineer – (QA)

Orang line Metro Train Project, Lahore – (OLMRTS)
11.2020 - Current

BSc Electrical Engineering & Technology - Electrical Engineering & Technology

Superior University
02.2019 - 03.2023

QA/QC Engineer - Electrical

REDCO INTERNATIONAL W.L.L. Qatar
05.2016 - 01.2019

Electrical Supervisor

POWER PROFESSIONALS & ENGINEERS
06.2015 - 04.2016

B. Tech (Pass) - Electrical Technology

NCBA&E LCU Campus
09.2012 - 08.2014

Electrical Technology

Government Technical College - (GCT)
09.2008 - 08.2011
Zeeshan ALiElectrical Engineer