Summary
Overview
Work History
Education
Skills
Certification
Accomplishments
Personal Information
Technical Expertise
Languages
Timeline
Generic

Yousuf Sharif

Karachi,Pakistan

Summary

Dynamic and results-driven Control & Electrical Engineer with over 20 + years of experience in Power GeneraƟon, Oil & Gas, Industrial AutomaƟon, and Control Systems. Specialized in PLC/SCADA programming, generator & compressor control, synchronizaƟon systems, and advanced troubleshooƟng. Expert in commissioning large-scale industrial plants, opƟmizing reliability, and implemenƟng energy-efficient soluƟons. Proven leadership in mulƟ-million-dollar projects, process automaƟon, and safety-criƟcal operaƟons.

Overview

24
24
years of professional experience
1
1
Certification

Work History

Assistant Electrical / Control Engineer

United Energy Pakistan
10.2012 - Current
  • Commissioned Waukesha V7044 & 7042 ESM units with Ariel & AJX compressors.
  • Waukesha compressor ESM 1 control system converted into ESM 2.
  • Programmed, configured, and troubleshot DIFE, DEEP SEA, EMCP 2/4.1/4.2, WOODWARD controllers.
  • Maintained and optimized Caterpillar & Waukesha gas generators (6.6 kV / 480 V).
  • Modernized PLC/SCADA systems (Allen-Bradley, Siemens) across Amine, Dehydration & CO2 Membrane Plants, enhancing process control and decreasing unscheduled downtime by 60 hours annually.
  • Compressor Waukesha 7044 engine control system converted into from ESM 1 TO ESM 2 and compressor control system converted into PLC system and remote-control monitoring.
  • MAZARI GAS Plant control system run in relay logic which is converted into PLC and SCADA system.
  • Implemented heat recovery systems to enhance efficiency and reduce fuel usage.
  • Lead of generator overhaul, acceptance testing, protection relay testing & calibration.
  • Managed UPS systems (GUTOR PXP, AMETECH) and electrical protection networks.
  • Provided advanced support for process automation & emergency response operations.

Electrical / Control Engineer

Allied Engineering Pakistan Limited
01.2008 - 10.2012
  • Engineered and commissioned CATTERPILLER GENERATORS different series control panels, switchgear & auto-synchronization systems.
  • Integrated TERBERG SCADA, ENERCON, DEEP SEA controllers for gas generator plants.
  • Delivered power generation projects for BP, ENI, OGDCL, PPL.
  • Designed energy-saving frameworks, improving performance and reducing operational costs.
  • Supported troubleshooting, documentation, I/O checks, and loop-testing for commissioning.

Electrical / Control Engineer

GASCO Engineering Pakistan Limited
01.2002 - 01.2008
  • Commissioned Waukesha VHP Series L7042/7044 GSI engines with Ariel compressors.
  • Diagnosed & configured Murphy Panel & Centurion Plus Controllers.
  • Maintained MCC, switchgear, UPS, HVAC, transformers & industrial protection circuits.
  • Prepared P&IDs, wiring diagrams, I/O lists, loop files as per engineering standards.
  • Improved generator reliability through preventive maintenance programs.

Education

MS - Electrical Engineering (Control & Robotics)

MAJU

BS - Electrical Engineering Technology

PIMSAT

B.Tech - Electrical

PIMSAT

DAE - Power Technology

Govt. College of Technology

Diploma - Electrical Protection

Alison

Skills

  • PLC Programming
  • HMI Programming
  • SCADA Programming
  • Power Generation Control
  • Gas Compression Control
  • Auto-Synchronization
  • Load Management
  • Control Panel Design
  • MCC Relay Logic
  • Communication Protocols
  • Modbus
  • EtherNet/IP
  • CAN J1939
  • Generator Protection
  • Switchgear Systems
  • Troubleshooting
  • Preventive Maintenance
  • Energy Efficiency
  • Heat Recovery Systems
  • Project Execution
  • Commissioning

Certification

  • PLC & SCADA Systems - KE Gas & Steam Power Plant
  • Machine Learning & Artificial Intelligence
  • UPS GUTOR PXP & SDC Training
  • IoT Fundamentals
  • Caterpillar Electronics Troubleshooting
  • Terberg PLC & SCADA System (Holland country)

Accomplishments

  • Project of MAZARI GAS Plant control system run in relay logic which is converted into PLC and SCADA system.
  • Project of Turk gas facility Plant upgraded from manual control system to full automation (PLC ALLEN BRADLEY) and unmanned system.
  • Compressor Waukesha 7044 engine control system converted from ESM 1 TO ESM 2 and compressor control system converted into PLC system and remote-control monitoring.
  • Delivered $30M Gas Plant Project (UEP) within time and scope.
  • Engineered and commissioned Waukesha 10 MW gas generator plant at UEP Naimat Field.
  • Designed 6 MW generator plant with heat recovery system, reducing fuel cost and emissions.
  • Successfully led commissioning of generator systems for Anoud Power Plant.

Personal Information

Title: Automation Control & Electrical Engineer

Technical Expertise

Allen-Bradley: ControlLogix, CompactLogix, MicroLogix (RSLogix / Studio 5000), Siemens: S7-300, S7-1200, S7-1500 (TIA Portal), FactoryTalk View SE/ME, WinCC, Citect SCADA, PanelView Plus 1000, PanelView Plus 1250, Modbus RTU/TCP, EtherNet/IP, RS-485 (A-/B+), CAN Bus (SAE J1939), Profibus DP, Profinet, CAT ECM: diagnostics, fault logging, parameter configuration, Woodward: ProAct, ESM-1 → ESM-2 upgrades, GOV-40/41, Protection Relays (ABB, Siemens, Schneider), Switchgear Testing & Commissioning, Load Management & Synchronization, SLDs, Loop Diagrams, MCC Wiring

Languages

English
Upper Intermediate
B2

Timeline

Assistant Electrical / Control Engineer

United Energy Pakistan
10.2012 - Current

Electrical / Control Engineer

Allied Engineering Pakistan Limited
01.2008 - 10.2012

Electrical / Control Engineer

GASCO Engineering Pakistan Limited
01.2002 - 01.2008

MS - Electrical Engineering (Control & Robotics)

MAJU

BS - Electrical Engineering Technology

PIMSAT

B.Tech - Electrical

PIMSAT

DAE - Power Technology

Govt. College of Technology

Diploma - Electrical Protection

Alison
Yousuf Sharif