Results-driven Maintenance Engineer with 11 years of experience in the oil and gas industry. Demonstrates the ability to ensure optimal performance, reliability, and safety of equipment and facilities. Oversees maintenance operations, implements preventive maintenance programs, and troubleshoots complex issues. Manages teams and collaborates cross-functionally to achieve organizational objectives. Possesses strong knowledge of industry regulations and best practices. Committed to delivering cost-effective solutions while upholding the highest standards of quality and compliance.
Overview
12
12
years of professional experience
4
4
years of post-secondary education
Work History
Maintenance Engineer
Oil and Gas Development Company Limited
05.2013 - Current
Company Overview: Deputed at country's one of the largest Oil & Gas field (Nashpa Oil field) having installed processing capacity of 110 MMSCFD Gas, 350 Tons LPG, 20,000 bpd Crude Oil/ day
Plant comprises of Shell & Tube heat exchangers, high pressure vessels, centrifugal pumps, 04 Waukesha Engine Driven Cameron Reciprocating Sale Gas Compressors (45 MMSCFD Nominal Gas Flow rate at 1250psi each), 04 Waukesha Engine Driven Ariel Reciprocating Front End Compressors (60 MMSCFD Nominal Gas Flow rate at 1250psi each) along with utilities i.e
06MW captive power house with 03 Caterpillar Gas Engines, Reverse Osmosis Plant, DAF unit, Propane Refrigeration Unit and Fire Water Network
Developed 5-year Pro-active Maintenance and Condition Monitoring Schedule for plant Rotary Machinery to cover regular service and material needs along with tentative budget requirements
Performed Identification and procurement of essential spares for plant stationary equipment
Preventive Maintenance planning and inventory management for spares of Plant utility systems i.e
R.O Plant, Power House, Fuel Gas System, Produced Water & Closed Drain System
Prepared Procurement budget i.e., OPEX PKR
650 Million And CAPEX PKR
670 Million (approx.)
Prepared maintenance scope of work for all Annual Turnarounds (Till-Date) and calculated required resources to optimize maintenance plan
To plan the future requirements of spare parts for the preventive and scheduled maintenance of all the mechanical and rotary equipment
Raising indents for PM spares and procure the emergency/insurance spares keeping in view the min/max level to full utilization of procurement inventory
Real time monitoring of Preventive Maintenance Jobs to ensure minimum equipment unavailability time
Performed troubleshooting, diagnosis and repair of surface facility equipment and develop maintenance strategies, plan and schedule overall maintenance activities, covering preventive, routine, predictive maintenance of rotary equipment
Analyze Rotary Machinery operational trends for pro-active identification of any service need or schedule a detailed inspection upon next equipment shutdown
Execution of scheduled, preventive maintenance, top end and major overhaul of engines
Performing Root Cause Analysis (RCFA) for any equipment, incident investigation and carrying safety/technical audits
Troubleshooting of Engines, Compressor, Gensets and pumps during breakdown and review of EFR (equipment failure report) for unforeseen equipment failures and implementation of improvement plans in maintenance strategy after consultation with HOD
Carrying periodic condition monitoring of all rotary equipment and review the reports of Windrock, Vibration analysis, Oil analysis and NDT
Implementation of their result/recommendation to ensure trouble free and longer unit operation
Enhanced maintenance efficiency by leading implementation of MAXIMO on-site in 2018 and currently leading implementation of SAP ERP on Nashpa Site as Field Implementation Coordinator
Ensured compliance of Company HSE standards in true spirits to manage a safe work environment and Prepare and review Standard Operating Procedures (SOP), Job Safety Analysis (JSA) to ensure the occupational health and safety standards
Prepared procurement schedules for plant equipment spares and coordinated with suppliers to ensure in time delivery of material at site
Led Planning and Execution of operational improvements of Plant via MOCs which resulted in reduced operational costs with improved outputs of plant
Technical Analysis of changes under Management of Change (MOC) and Engineering Change Request (ECR)
Performed pre-qualifications/ technical verification of vendors/ contractors to promote coordination and eliminate subsequent ambiguities during material delivery/ job execution
Deputed at country's one of the largest Oil & Gas field (Nashpa Oil field) having installed processing capacity of 110 MMSCFD Gas, 350 Tons LPG, 20,000 bpd Crude Oil/ day
Plant comprises of Shell & Tube heat exchangers, high pressure vessels, centrifugal pumps, 04 Waukesha Engine Driven Cameron Reciprocating Sale Gas Compressors (45 MMSCFD Nominal Gas Flow rate at 1250psi each), 04 Waukesha Engine Driven Ariel Reciprocating Front End Compressors (60 MMSCFD Nominal Gas Flow rate at 1250psi each) along with utilities i.e
06MW captive power house with 03 Caterpillar Gas Engines, Reverse Osmosis Plant, DAF unit, Propane Refrigeration Unit and Fire Water Network
Designated Project Coordinator for Developmental Projects:
Planning, installation and commissioning of 50 MMSCFD Gas Dehydration plant along with allied units at Wali Oil & Gas Field 2022-Current
Front end Compression Project of Nashpa LPG Processing plant (Installation and Commissioning of Waukesha Gas Engines with Ariel Compressors) 2021
Commissioning of LPG Recovery Plant at Nashpa Oil and Gas Field
The facility is designed to handle 98MMscfd Gas, 18,000 bbl/d of crude/ condensate and 350 MT/day of LPG
2018
Planning, installation and commissioning of 40 MMSCFD Gas Dehydration unit along with utilities at Togh Oil & Gas Field 2019-20
Planning, installation and commissioning of 30 MMSCFD Gas Dehydration unit along with utilities at Dhok Hussain Gas Field 2017-18
Installation/Commission and startup of OFF Gas Compression Package (Ariel Compressor JGT/2 coupled with Waukesha Engine (F-3524 GSI ESM) 2014
Inspecting the construction activities of crude oil storage tanks (20,000 BBLs Capacity) 2013