Umar Hayat

Umar Hayat

Islamabad

Summary

Innovative General Manager (Tech) having 29 years of experience ready to combine established technical guidelines with unique methods to create customized solutions. Adept at developing made-to-order instructions and protocols for each client's unique needs. Veteran of enhancing production and development outcomes through novel application of techniques ideally suited to each scenario. Experienced at enhancing outcomes by applying evolutionary iteration to quickly deliver exceptional final products.

Overview

34
34
years of professional experience

Work History

General Manager(Tech)/Consultant Engineer

Sachal Telecom (Pvt) Ltd
01.2020 - 07.2023
  • Self-motivated and result-oriented General Manger (Technical) with demonstrated experience of 29 years in the fields of Telecommunication Outside & Inside plants Infrastructures network for Initial survey, planning, detailed design, BOQ Preparation, suggested material specifications, brands approvals, work methodology, ROW obtaining, implementation, clients coordination during execution up till final acceptances, quality control, preparation of acceptances documents, performing test protocols & approval from clients, removing of discrepancies during PAT/FAC pointed by client, raising of commercial invoices, As built drawings & BOQ, Preparation of Variation order documents, performing warranty period as per contract with clients, O&M SLA for new telephone lines expansions, OFC Junction network, Core networks, including FTTC & FTTH, GPON &Core Networks implementation also.
  • Recent Turnkey Project executed, self construction metro OFC project for the connectivity of 13 BTS sites (70km) in Islamabad/Rawalpindi area from company technical & commercial qualification, tendering process, cost analysis in the line of client requirements, signing of contract and after that implementation includes like survey, planning, ROW obtaining, material procurement (like but not limited 57mm dia HDPE pipe with accessories, G,I Pipes with accessories, bridges attachment accessories, warning tape, OFC 96 core single mode from approved manufactures, Jointing kits, ODF, pigtails, precast hand holes, precast RCC slabs, marker posts and allied materials to be completed end to end connectivity), preparation of PAT/FAT documents, visual & electrical testing. After testing and handing over the SLA for preventive & corrective maintenance for a period of 5 years after successful completion of warranty period also part of this contract. The project included CAPEX and OPEX. This project executed as General Manger (Tech) till July 18,2023.
  • Recently worked with Consultant Company (M/s Telecom Engineering And Consultancy House (Pvt) Ltd & STL on Consortium) in Islamabad as OFC expert (Consultant) on Consultancy Services to conduct a study for USF’s Next Generation Optic Fiber Network &Services Program in Pakistan,Tender ID: USF/NG-OFNS/2020/01. My role in this consultancy study was Installation, ROW and Technical matters report writing and collection of data from telecom operators, service providers and ROW departments including USF OFC programs lunched before this study. National Broadband Policy, Ignite Rules, and associated industry documents. Focus was to identify service providers under each license and assess their eligibility to participate in USFCo OFC programs. Study was directed to assess and identify provisions available with all licensed telecom service providers across the telecom service provisioning value chain to participate in USFCo Next Generation Optic Fiber Network & Services Program. The study has recommended applicable regulatory allowances/permissions and possible avenues have been proposed aligned with the regulatory allowances / permissions to enhance broadband data services uptake at user level
  • While worked recently as Monitoring Auditor Expert in (TEACH-STL Consortium) and supervised more than 10 projects of OFC lots audits in nation wide comprising scope and work methodology as per USF term of reference (ToR).The tasks has been undertaken during conducted of monitoring audit with USF OFC Programs executed by service providers (PTCL, Naytel & Wateen Telecom) to maintain the quality of network & equipment health. Performed the test on OFC Nodes on USF locations included in monitoring visits, as per monitoring methodology, this will include BoQ verification, Physical infrastructure inspection, Inspection of Transmission and Power equipment, upgradation on site in case of newly deployed equipment testing/inspection included OTDR and Source/Power meter test. The results recorded on check lists provided by USF.Performed tests using standard tools/ test equipment fresh calibrated. Tests include OTDR traces obtained on dark fibers. Similarly, Source/Power meter value is obtained using power meter to detect fiber health as per standard. Checked & recorded the Capacity and ratings of the power solution as per contract provided by service provider and any backup solution deployment (Secondary). Similarly, for Transmission the capacity of optical/Electrical equipment noted as in case any upgradation in optical or electrical equipment (modules, SDH cards) capacity and bandwidth
  • In last three years conducted OFC monitoring audits as Consultant Engineer more than 200 nodes and 3000km OFC network comprising different lots where network laid by Service Providers mostly PTCL.
  • Supervised from Bidding (Tech & Com bids) and after work award the deployment of OFC last mile connections/links to UBL tower, China Embassy and Nadra HQ in Islamabad including survey, design, deployment, supplied & installed equipment & cable (ODF, media convert, pigtails, patch cords and OFC) splicing/termination, testing and commissioning with two years SLA for O&M 24/7 including spare supports on trunk bases. The SLA for the period of two years after work acceptance by client. " CMPAK/2023".
  • Bidding( Technical & Financial bids), cost analysis, contract terms finalization before signing & clarification meeting with client. After work award the execution of Monitoring Audit for OFC Lot ID: USF/SP/OPTICFIBER/SINDH LOT 2 &3-PACKAGES and -ID: USF/SP/Optic Fibre/2017/Khyber-Pakhtunkhwa –on Consortium -Kickoff on April 11,2023. "USF/2023
  • Bidding( Technical & Financial bids), cost analysis, contract terms finalization before signing & clarification meeting with client. After work award the execution of Monitoring Audit for OFC Lot ID: USF/SP/OPTICFIBER/2018 FATA-PACKAGE-1 & Lot ID: USF/SP/OpticFibre/2017/Khyber-Pakhtunkhwa and Sindh Lot 2–on Consortium , kickoff on Nov 10, 2022. " "USF/2022".
  • Bidding( Technical & Financial bids), cost analysis, contract terms finalization before signing & clarification meeting with client. After work award the execution of and Monitoring Audit for OFC Lot ID: USF/SP/OPTICFIBER/2018 FATA-PACKAGE-1 & Lot ID: USF/SP/OpticFibre/2017/Khyber-Pakhtunkhwa –on Consortium. "USF/2022"
  • Bidding( Technical & Financial bids), cost analysis, contract terms finalization before signing & clarification meeting with client. After work award the execution of monitoring audit for OFC Projects/Monitoring Auditor/2020/01 (OFC – KPK & SINDH)- on Consortium. "USF/2021"
  • Bidding( Technical & Financial bids), cost analysis, contract terms finalization before signing & clarification meeting with client. After work award the execution of Consultancy Services to conduct and study for USF NG OF NW and Services Program nationwide USF/NG-OFNS/2020/01-on Consortium. "USF/2020"
  • SLA of O&M of OFC laid 70km for the connectivity of GSM BTS sites for 4G/5G backbone to carry traffic up to BSC/MSC in Rawalpindi/Islamabad metro area. The team deployed for patrolling, preventive & corrective maintenance for 7/24/365. The NOC managed for 7/24 with professional team. CMPAK/2020-SLA"
  • Construction of Mustafa Tower near NUST apartments-II (05 story in Sector H-13 Islamabad), Supervised works like electrical, plumbing, fire alarms and telecom as consultant). "Private Work/2020"
  • SUPERVISED SOME OF KEY PROJECTS IN MY CARRIOR FROM Bidding, Surveyed, Planned, ROW Obtained, Implemented, Quality Control, Testing, Commissioning, Acceptances complete as per contract terms with Clients are:-
  • Long Haul OFC Deployment from Islamabad to Karachi around 2000km this was the first project in Pakistan and first backbone of PTC. "Telecom Australia/1992"
  • OSP for 230,000 ( 123000/1992, 70,000/1994 & 37000/1999) new telephone lines and Allied telecommunication infrastructures deployment on turnkey bases and allied related works in nation wide, from survey, Planning, network designing and implementation in Pakistan. "PTC"
  • OFC routes resilience of PTCL regions in ITR, RTR & NTR Project: Requirement analysis, planning, design, obtaining of ROW and execution/Implementation monitoring, Quality Assurance of FTTH/GPON more than 10 links OFC routes connectivities. "PTCL/2019"
  • DED from OLT/ODF to ONU for access network and detailed BOQ, s for the Optical Fiber Cable Junction & Access network in existing & new ducts along with installation of ODF, Fiber allocation plans to make the ring apology, splicing, termination, testing and acceptance of PTCL / Huawei technologies for 35 (Thirty five) main exchanges, 300Km in Karachi. "PTCL/2003"
  • Bidding, Survey, planning, network design, acquisition of ROW and construction of OFC network for AAA & CCTV camera’s in atomic energy (projects & residential area’s) in 4 different locations (Punjab & KPK) under command of Pak Army Pakistan. "PAEC/2015"
  • Consultancy of OLT/ODN design Network: Successfully completed of Corridor Survey, Detail Engineering Design from OLT-OLT and detailed BOQ, s for the Fiber Optical Cable Junction network of NTC (National Telecommunication corporation of Pakistan) for nine big cities (Lahore, Gujranwala, Faisal abad, Multan, Peshawar, Hayder abad, Karachi & Quetta and Punjab board of information technology Lahore). "NTC/2002"
  • Technical Audit as Monitoring Auditor (MA as Team Leader/Consultant) for the OFC Project Packages completed by PTCL & Wateen Telecom in KPK & SINDH for complete Telecommunication nodes & OF links (Transmission equipment, ODF, DDF, CARDS, Power equipment (Rectifiers, battery banks, Generators, Solar power system, DGs, commercial powers, all cables connectivity’s, grounding work, building rehabilitation, GSM towers and BTS equipment inspection, testing, recorded of results, report writing, all data recorded in desired checklists, NoC visited and tested all the nodes are connected on different alarms). "USF/2020-2023.

General Manager (Tech)/Consultant/OFC Expert

Sachal Telecom (Pvt) Ltd
01.2015 - 12.2019
  • SPECIALTIES /SKILLS
  • Preparation of new tenders company per-qualification documents in the line of clients requirements, get local level materiel/services cost analysis as per initial survey of project requirement with all stake holders, assessment of unforeseen events, security issues, check the weather environment and its prerequisites, collection of rates from well known third parties for market rates and resources details, preparation of technical bids including project implementation plan, resources and work methodology
  • As per project scope and specifications and related design drawings shall be prepared the financial proposals to keep understanding all facts and taxes or duties details of all project related telecom infrastructures and other networks ICT services
  • GSM initial planning, site acquisition, technical survey for site selection, LOS clearance, Finalization of GSM/MW antenna height and azmit, Preparation of DED
  • Contract & vendor Management: Pre Qualification document, RFP Preparation, Tendering, Bids Evaluation, Negotiation, Contract Award, and Management of Project Implementation
  • Quality Assurance, Business Continuity, Security & Risk Management
  • Procurement of project materials for telecommunication network from approved manufactured sources in local market/abroad.
  • Professional Responsibilities for Telecommunication Infrastructure Implementation and allied civil works Supervised from Jan, 2015 to Dec, 2019.Worked as General Manager (Tech)/Consultant.
  • Bidding (PQ, Technical & Financial bids) and supervision from survey, design, deployment of OFC 96 core network connecting various BTS sites in Islamabad/Rawalpindi, including planning, obtaining of ROW, materials procurement, splicing,termination and testing etc on turnkey bases and 5 years O&M for 24/7. (62KM). "CMPAK/2019"
  • Bidding (PQ, Technical & Financial bids) and supervision from survey, design, deployment of long hall OFC 48/96 core in Islamabad & northern telecom regions of PTCL, including ROW obtain, materials supplied,splicing, termination, testing, commissioning & acceptance (PAC/FAC) etc on turnkey bases (70km). "PTCL/2017"
  • Bidding (PQ, Technical & Financial bids) and Deployment of Aerial OFC 96 core back bone including Installation of poles as per design, transportation & handling of materials,splicing, termination, testing & commissioning and acceptance between Khunjrab & Karimabad in GB (130KM). "SCO/2017"
  • Bidding (PQ, Technical & Financial bids) and supervision from survey, deployment of OFC different cores (6/12/24/48) network, as built drawings, splicing, termination, testing, commissioning and acceptance of PAC/FAC including one year warranty of provided works & materials for safe city project for installation of Security Cameras in Lahore (180km). "Punjab Safe City Authority/2016"
  • Bidding (Tech & Financial bids) and supervision from Initial survey, deployment, as built drawings, splicing, termination, testing & commissioning of OFC 96 core from Danyore to Sust For Pak-China CPEC OFC Network (150km). "SCO/2016"
  • Bidding, Initial survey, deployment, as built drawings, splicing, termination, testing and commissioning of OFC 96 core from Kholian to Khiwai near Balakot for Pak-China OFC Network (8km). "SCO/2016"
  • Bidding, survey, planning, deployment, of OFC diff core network including laying of power cables ,installation of server rooms in four strategic atomic energy locations rehabilitation, SLA for O&M of network, cameras, power network and server control rooms including splicing, termination, testing and spares provision on turnkey bases to maintain network 24/7 of PAEC (400km) in four strategic locations. "PAEC/2015"
  • Construction of Mustafa Tower apartments-I (11 story in Sector H-13 Islamabad), Supervised works like electrical, plumbing, fire alarms and telecom etc). "Private/2019"
  • Construction of Sapphire Tower in Islamabad Phase-II (10 Story), Supervised works like electrical, plumbing, fire alarms and telecom etc). "Private/2019"
  • Consultancy for Construction of Lahore-Sialkot Motorway Structures works (bridges, under passes, box culverts and pipe culverts along with tool plaza building), like electrical, plumbing, fire alarms and telecom etc). "FWO/2017-2019"
  • Dismantling, Transportation, Re installation, Foundations of SS & Guy Towers (45m) in Central Region- (05 Sites). PTCL/2015"
  • BTS, MW, Rectifiers dismantling, transportation & re installation in Karachi & Gujranwala (45M - 02 Sites). "PTCL/2014"
  • Supply & Installation of guyed masts for PTCL at various locations in Azad Jammu Kashmir ( Height 30m- 7 Sites) "PTCL/2014"


General Manager (Tech)/Consultant

Sachal Telecom (Pvt) Ltd& Sachal Technologies Inc (Pvt) Ltd
03.2009 - 12.2014

Professional Responsibilities for Telecommunication Infrastructure Implementation and allied civil works Supervised from, Supervised OFC Telecommunications Projects as Below-

  • Bidding, survey, planning, RoW support, deployment of OFC diff cores for Security cameras including splicing, termination, testing & commissioning at S1 Safe City Project in Islamabad, (250km) for more than 1500 security camera connectivity up to sub OLTs and main OLT control room. The OFC and jointing kits were supplied by M/s Huawei. "NADRA/2014"
  • Bidding, survey, design, deployment OFC diff core, cameras Installation, control room equipment installation & splicing, termination, testing for security purposes at Pakistan Ordinance Factories Wah Cantt (12km with 55 camera installation). "PAEC/2014"
  • Bidding, survey, design, deployment OFC diff cores, cameras Installation, control room equipment installation & splicing, termination, testing for security purposes for security purposes at Heavy Mechanical Complex Taxila (8km with 22 cameras Installation). "PAEC/2014"
  • Bidding, survey, design, deployment OFC diff cores, cameras Installation, control room equipment installation & splicing, termination,testing for security purposes for ICCC, Islamabad. The major part was supplied of passive equipment (servers, media converters, batteries, rectifiers, cameras night vision, LCD,s ,patch cords & accessories), 5km and 15 camera installation. "PAEC/2013"
  • Bidding, survey, design, deployment OFC diff cores, cameras Installation, control room equipment installation & splicing, termination, testing for security purposes at Jauherabad.(35km with 110 cameras Installation). "PAEC/2012"
  • Bidding, survey, design, deployment OFC diff cores, cameras Installation, control room equipment installation & splicing, termination, testing for security purposes at Nelore, Islamabad.(4km with 12 Cameras Installation). "PAEC/2012"
  • Survey, design, Deployment OFC diff core, Cameras Installation, control room equipment installation & splicing, termination, testing for security purposes at Lahore.(3km with 11 Cameras Installation)."PAEC/2012"
  • Pre Qualification, Bidding and after award of contract started supervision of survey, planning, design, cameras & poles installation with power cables, control room equipment Installation, deployment of OFC diff cores with allied civil works as well as splicing, termination, testing & commissioning at Kahuta, Islamabad (21km with 45 cameras Installation). "PAEC/2012"
  • Survey, Initial Planning, obtaining of ROW , provisioning of materials (HDPE, W/Tape, G.I Pipes & bridges accessories, OFC 48 cores, Joint Enclosures, ODF & Patch cords) ,deployment , testing and commissioning at Kaller Kahar Motorway M-2 (32 Km)."LDI-Mobilink/2011"
  • Initial Survey and deployment of OFC 48 core long haul laying, splicing, termination, testing and acceptance between Tando Ikram and Sajwal (50KM) with ZTE. "PTCL/2010"
  • Initial Survey, OFC Laying, splicing, termination, testing and acceptance along G.T road from Lahore to Sahiwal & Lahore to Kasur via Raiwind (220KM). "LDI-Mobilink/2010"
  • Initial Survey, OFC Laying, splicing, termination, testing and acceptance along G.T road from Jhelum to Wazirabad (72KM). "LDI-Mobilink/2009"
  • Initial survey, OFC Laying,splicing, termination, testing and acceptance along Motor way from Khanqa dogran to Lahore (100KM). "LDI-Mobilink/2009"
  • Supervised GSM Telecommunications, Electrical & Civil Projects as Below-
  • Soil Investigation, DED from third Party, Civil Works, for PTCL 3 Sites at various locations in North Region. "PTCL/2013"
  • 02 Sites hunting, selection of appropriate sites for installation, arranging NOC, all legal matters and power connections in Central Region."PTCL/2013"
  • Survey, soil investigation, design & drawing, BOQ and Construction of repeater multi story building along with 30M SS tower and area development at Lowari Top hill, KPK. " PTCL/2012"
  • Technical Survey, Drawing & Design, Civil works & Telecom transmission & power equipment Installation for PTCL EVDO 140 SITES PROJECT (12 SITES) in kpk."PTCL/2012"
  • Technical Survey, Construction of 45M high tower green field BTS site, tower erection, painting, grounding, lighting, lightening, building and allied area development works in Kohat (01 Site). "Mobilink/2011"
  • Technical Survey, Design & Drawing ,Civil works & Telecom & power equipment installation works for PTCL EVDO (Evolution Data Optimized) Project in Northern Areas (28 sites)."PTCL/2011"
  • Design, fabrication & Supply of Guyed Mast height 100 Rft along with complete accessories (3 towers) to UNDP2011.
  • TSSR, Design , BOQ and Civil Works and Turnkey services for Telenor GSM Project.(In DIR, Malakand, Chitral and Wazirstan – 02 sites). "Telenor/2010"
  • TSSR, Design , BOQ and Civil works & allied infrastructure develpment for CDMA/WLL Project (in Mansehra, Batgaram, Chalas & Waziristan – 10 sites). "PTCL/2009"
  • TSSR, Design , BOQ, Costing ,Civil works & allied infrastructure for NTR/PTCL Project (Dir - 02 sites). "PTCL/2009"
  • Consultancy for Construction of Sapphire Tower in Islamabad Phase-I (07 Story), Supervised like electrical, plumbing, fire alarms and telecom etc).
  • Consultancy for Construction of office building, RCC Road & Boundary Wall, Supervised like electrical, plumbing, fire alarms and telecom etc at Bhalwal). PIE/2012"
  • Construction of Boundary Wall, main gate and electrical works at Rawalpindi "FJWU/2011.


Project Engineer (Electrical)

Sachal Technical Services International (Pvt) Ltd
01.2012 - 01.2021

Responsibilities as Electrical Engineer

  • Maintained records for each project and engineering discipline.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Identified technical risks within managed projects.
  • SOLAR SYSTEM SUPERVISED DURING WORKING IN SACHAL GROUP.
  • Solar Geysers Project: The solar geyser installed in nation wise (Punjab, KPK, Sindh and Balochistan) under award contract by UNDP more than 1250 numbers for the capacity of 150 litters, 200 litters and 240 litters.
  • Solar system on public level and net metering Installed diff capacity from 3kw, 5kw, 10kw and 15kw in Islamabad, Rawalpindi, TT Singh and Faisalabad and other locations in KPK and Punjab more than 18 location

Project Manager

Sachal Technologies Inc (Pvt) Ltd
01.2005 - 03.2009
  • Worked part-time over the span of four years , with the gracious approval of the esteemed Managing Director of the Group of Companies. This arrangement was facilitated to accommodate my pursuit of higher professional education, culminating in the successful completion of a Bachelor's Degree in Electrical Engineering (B-TECH) with both Passing and Honors distinctions. The Bachelor Degree was completed as regular student and get the CGPA-3.13.

Project Manager (Tech)

Sachal Telecom (Pvt) Ltd, Sachal Technologies Inc (Pvt) Ltd
01.2000 - 12.2004

Supervised the Telecommunication Infrastructures Implementation and allied works.

  • A: Supervised OFC Telecommunications Projects are as Below-
  • Survey & Planning For Long Haul OFC deployment covering 3800Km countrywide including CAD drawings and BOQ preparation for tender purposes. "LDI Mobilink 2004"
  • Survey, ROW, laying of Optical Fibre Cable, splicing, termination, testing and acceptance between Wadh & Khuzdar, Baluchistan (12KM). "PTCL2004"
  • Survey, ROW obtaining, material supplied, deployment of Optical Fibre Cable, splicing, termination, testing and acceptance between FC Check Post (60KM) & Wadh, Baluchistan. "PTCL2004"
  • Survey, ROW and OFC laying,splicing, termination, testing and acceptance between Mehran FC Check Post – Wadh Karachi (45.5Km). "PTCL2004"
  • Survey, ROW, and OFC Laying,splicing, termination, testing and acceptance between Shujabad and Jalalpur (47.0 Km). "PTCL2004"
  • Survey, ROW, OFC laying between Sher Sultan – Permit – Alipur – Jattoi (37.0 Km) including testing, commissioning and acceptance work, complete end to end connectivities. "PTCL2004"
  • Survey, ROW, OFC laying, splicing, termination, testing and acceptance between Bastimaluk and Dunyapur (28.0 Km)."PTCL2004"
  • Initial Survey, OFC laying between Sargodha - Chak 88 S.B & Bhagtanwala including supplied of materials, testing, commissioning and acceptance end to end with one year warranty (24.5 Km). "PTCL2004"
  • Initial Survey, ROW, Materials supplied, OFC laying,splicing, termination, testing and acceptance including PAC/FAC between Mullana More- Haveli – Bahadar Shah – Shorkot (46 Km)."PTCL2004"
  • Survey, ROW, OFC laying, splicing, termination, testing and acceptance between Samundari & Khider Wala including PAT/FAC and acceptance(20 Km)."PTCL2004"
  • Survey Designing and Laying of Optical Fiber Junction and Access Network in existing or new ducts to connect 35 exchanges -Phase – 1, Karachi (300 Km) including splicing, termination, testing and acceptance on ring topology. "PTCL2003"
  • Gate way switch Installation, testing and commissioning in Islamabad Satellite Town Exchange. "PTCL2002"
  • PTCL 10K PRI switches Installation and testing in 3 cities ISB, LHR and KHI. "PTCL2002"
  • Installation of 10 G Bits Nortel DWDM including power equipment (rectifiers & battery banks, Power DBs and allied cables (48 sites) Transmission System. "PTCL2003"
  • Consultancy Services for Optical Fiber Junction Network on 9 major cities for junction networks in Peshawar, Islamabad, Rawalpindi, Lahore, Multan, Faisalabad, Hyderabad, Sukhar and Karchi. "NTC/2002"
  • B: Supervised GSM Telecommunications, Electrical & Civil Projects as Below-
  • Sub-contract for construction of BTS sites including Civil and Tower errection works Phase – III Ufone (10 Sites). " Uphone 2004"
  • Sub-contract for construction of BTS sites including Civil and Tower errection works Phase – IV Ufone (15 Sites). "Uphone 2004"
  • Installation and Commissioning of Civil work and Tower installation Phase – IV Ufone (10 Sites) "Uphone 2004"
  • Fabrication and Construction of 15 cell sites (All green field) for Mobilink GSM Project (Tower Height 9m to 60m SS Green field & 20m to 25m Rooftop). " Mobilink 2002"
  • Installation of Tower Masts / equipment's and civil infrastructure at different locations, Phase – II (49 sites) Tower height 30m to 60m SS Green field & 20 to 25m Rooftop). " PTML/2002"
  • Construction of 2000 Lines PTCL Exchange Buildings(05 No.s) in Multan and DG Khan Districts incl electrical works. "PTCL/2003"


Project Manager (Tech)/Planning Engineer/Deputy Project Coordinator/Site Engineer/Assistant Engineer

Sachal Engineering (Pvt) Ltd/Sachal Telecom (Pvt) Ltd
10.1993 - 12.1999

Professional Responsibilities for Telecommunication Infrastructures Implementation and allied civil works Supervised from Oct 21, 1993 to Dec, 1999

Worked as Project Manager (Tech)/Planning Engineer/Deputy Project Coordinator/Site Engineer/Assistant Engineer.

A: Supervised Copper/OFC Telecommunications Projects as Below:-

  • BT Project for Survey, Planning and Laying of 29,000 new Telephone Lines, jointing, termination, acceptance, AS Built drawings and one year warranty after network PAC in Gujranwala & Multan Cities including material supplied like PVC pipes & accessories, G.I Pipes & accessories, DPs, cross connection cabinets, MDF modules 100 pairs capacity x numbers of lines, HH.s/MH.s,w/tape, DP poles and allied materials to commissioning of telephone lines as per client requirements. " PTCL/1999"
  • BT Project for Survey, Planning and Laying of 8,000 new Telephone Lines, jointing, termination, acceptance, AS Built drawings and one year warranty after network PAC in Quetta city including material supplied like PVC pipes & accessories, G.I Pipes & accessories, DPs, cross connection cabinets, MDF modules 100 pairs capacity x numbers of lines, HH.s/MH.s,w/tape, DP poles and allied materials to commissioning of telephone lines as per client requirement. "PTCL 1999"
  • Survey, OFC laying, testing, splicing, termination and acceptance for MANGLA NLC OFC SPUR (14.6 Km). "NLC 1996"
  • Survey, OFC laying, testing, splicing, termination and acceptance for JHELUM NLC OFC SPUR (0.9Km). "NLC 1996"
  • Survey, OFC laying, testing, splicing, termination and acceptance for SARGODHA NLC OFC SPUR (6.8 Km)."NLC 1996"
  • Survey, OFC laying, testing, splicing, termination and acceptance for GUJRANWALA NLC OFC SPUR (14.2 Km). "NLC 1996"
  • Survey, OFC laying, testing, splicing, termination and acceptance for MULTAN NLC OFC SPUR (3.5 Km). "NLC 1996"
  • Survey, OFC laying, testing, splicing, termination and acceptance for BAHAWALPUR NLC OFC SPUR (2.9 Km). "NLC 1996"
  • Survey, OFC laying, testing, splicing, termination and acceptance for HYDERABAD NLC OFC SPUR (1.3 Km)."NLC 1996"
  • Survey, OFC laying, testing, splicing, termination and acceptance for MALIR NLC OFC SPUR (6.8 Km)."NLC 1996"
  • Survey, OFC laying, testing, splicing, termination and acceptance for KARACHI NLC OFC SPUR (17.5 Km). "NLC 1996"
  • Survey, OFC laying, testing, splicing, termination and acceptance between Sukkar – Shikarpur – Larkana (112 Km). "PTC 1995"
  • BLT project Package B for Survey Planning and laying of 70,000 new telephone lines in 13 exchanges in (9 cities) complete with all respect including all materials and passive equipment supplied from MDF to Subscriber terminal boxes.The copper cables (Primary & Secondary) were supplied by Sumitomo, Japan. "PTC 1993-1995"
  • Survey, ROW and OFC laying between Sakrand and Nawab Shah (24.0 Km). "PTC 1994"
  • Survey, ROW and OFC laying between Gujranwala – Gujrat – Kharian (80.0 Km). "PTC 1994"
  • Survey, ROW and OFC laying between Rawalpindi and Kamra (100.0 Km)."PTC 1994"
  • Survey, ROW and OFC laying between Sahiwal – Arifwala – Burewala (96.0 Km). "PTC 1994"
  • Survey, ROW and OFC laying between Gujranwala – Daska – Sialkot (53.0 Km). "PTC 1994"
  • BLT project for OFC laying for Inter Exchange Junction link for Peshawer city (30.5 Km). "PTC 1993"PTC 1993"
  • BLT project for OFC laying for Inter Exchange Junction Link for Sargodha city (10.8 Km). "PTC 1993"
  • BLT project for OFC laying for Inter Exchange Junction link for Multan city (20.7 Km). "PTC 1993"
  • BLT project for OFC laying for Inter Exchange Junction Link for Bahawalpur city (5.7 KM). "PTC 1993"
  • B: Supervised GSM Telecommunications, Electrical & Civil Projects as Below-
  • Design, soil investigation, fabrication and construction of PTV Tower at “Dir” (self supported 70 m & 45M height) 03 SITES in NWFP. "PTV 1997-98"
  • Fabrication and Erection of TDMA Telecommunication Towers at 101 location in different regions of PTC (30 to 40m Guyed mast). "NRTC 1996-98.

Site Engineer (Telecom)

Associated Technologies (Pvt) Ltd
02.1992 - 10.1993
  • Telecommunication Work Supervision for the Survey & Planning, network design of primary, secondary and drop wire up to homes, BOQs, construction of primary conduit laying, Manhole, s construction, secondary cable laying, primary cable pulling, junction cable exchange to exchange, primary and secondary jointing, termination of MDF, cabinets, DPs Electrical & physical testing, acceptance, As built of primary and secondary local cable network of 123,000 lines BLT package ‘A’ Project in Lahore under the supervision of PTC/Ericsson from Sweden.

Assistant Engineer

Transenergy International (Pvt) Ltd
02.1991 - 02.1992
  • Optical Fiber Cable):Work Supervised for the OFC (18 fiber) implementation as per design & specifications, OFC laying, jointing & termination, repeaters/exchanges entries, ODFs installation, fault locating and clear the trouble shooting, construction of repeater huts and installation of solar system (where Wapda not available), As built drawings, BOQ, making of acceptance protocols as per client requirement, complete acceptance of network to client with PTC/Telecom Australia OLEX cable from Rawalpindi-Karachi till PAT and FAT.
  • From Feb-1991 to Fab- 1992

Sub-Engineer (Transmission)

POTENTIAL ENGINEERS (PVT) LTD LAHORE
11.1989 - 02.1991
  • Work Supervised for the Construction of 132KV Over Head Transmission line Project from 500kv Gitty Grid Station to 220KV Grid Station Jaranwala Rd under the Supervision of WAPDA Grid & Transmission Division.

"WAPDA 1989-1991"


Work Supervised at a Glance

Sachal Group of Companies & Other Companies
01.1990 - 07.2023
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Handled customer complaints, resolved issues, and adjusted policies to meet changing needs.
  • Maintained clean and well-organized production areas to avoid violations or unnecessary work delays due to hazards or inefficient layouts.
  • Monitored workflow to improve employee time management and increase productivity.


Telecom Infrastructure Implementation and Allied Works Experience Summary at Glance

During my illustrious career spanning from January 1990 to July 2023, I have effectively overseen and executed a wide array of projects in the field of Telecom Infrastructures Implementation and allied areas. The following achievements provide a snapshot of my remarkable journey:

  • Optical Fiber Cable Deployment (OFC): Successfully laid an impressive total of 5327 kilometers of Optical Fiber Cable, facilitating high-speed data transmission across extensive networks.
  • Field Survey & Planning: Led comprehensive field surveys and meticulous planning, contributing to the meticulous implementation of 4090 kilometers of infrastructure.
  • Fiber Splicing Expertise: Proficiently spliced a substantial number of optical fibers, including 6, 12, 24, 48, 72, and 96-fiber configurations, totaling 1200 splices.
  • ONU Installations: Orchestrated the installation of 60 Optical Network Units (ONUs), enhancing connectivity and network efficiency.
  • ODF Installations: Oversaw the deployment of 370 Optical Distribution Frames (ODFs), crucial components in network organization and management.
  • Telephone Line Expansion: Pioneered the expansion of new telephone lines and OSP networks, adding a remarkable 230,000 lines to telecommunication infrastructure.
  • Underground Conduit Deployment: Supervised the laying of 1775 kilometers of underground PVC/HDPE conduits, a critical aspect of robust network architecture.
  • Manholes and Handholds: Directed the construction of 6000 manholes and handholds, ensuring efficient cable management and accessibility.
  • Cross Connect Cabinets: Installed 910 Cross Connect Cabinets, facilitating efficient interconnection and network distribution.
  • Cable Installation: Spearheaded the installation of primary and secondary cables spanning 1115 and 5200 kilometers, respectively, strengthening the network backbone.
  • Distribution Point (DP) Installation: Deployed 33500 Distribution Points on poles, enhancing network coverage and accessibility.
  • GSM BTS Network Implementation: Successfully implemented 529 GSM Base Transceiver Station (BTS) sites, bolstering mobile network coverage.
  • Diesel Generator Installations: Installed and commissioned 250 Diesel Generators of varying ratings (15KVA, 30KVA), ensuring network resilience during power fluctuations.
  • Power Cable Deployment: Expertly laid power cables (16mm², 25mm², 35mm²) across 529 sites, ensuring consistent power supply to critical network components.
  • Transmission Line Expertise: Managed the deployment of 7.322 kilometers of 132KV Transmission Lines, an essential component of power distribution infrastructure.
  • Solar Technology Integration: Successfully installed 1250 Solar Water Geysers and implemented solar systems at 18 sites, showcasing commitment to sustainable energy solutions.

These accomplishments stand as a testament to my expertise in Telecom Infrastructure Implementation and allied fields, reflecting a dedicated career marked by unparalleled contributions and impactful achievements


Education

Associate Engineer of Electrical Technology - Electrical Technology

Punjab Board of Technical Education, Faisalabad
1989

Bachelor of Technology - Electrical Engineering

NewPorts Institute of Communications And & Economics, Karachi, Lahore
2009
  • 3.13 GPA

Member of " The Institution of Engineers Pakistan" - Engineers Member # A/3065-I/8180

The Institution of Engineers Pakistan , Lahore
1993

Member of “The Institution of Engineers, ” (A/3065-I/818)

Certificate in AutoCAD (2d+3d) - Professional Skill

AutoCAD Professional College , Rawalpindi
2007

skilled development council

High School Diploma -

Govt High School, Jaranwala, Faisalabad
1986

Secondary School Certificate from Board of Intermediate & Secondary Education (Sargodha)

Skills

  • Engineering Principles
  • Telecom Infrastructures Implementation Expert
  • Network Technical & Monitoring Auditor Expert
  • ROW Obtaining Expert
  • Project Bidding Expert
  • Customer Satisfaction
  • On-Site Inspection Management
  • Electrical Engineering
  • Team Member Development
  • Technical Writing
  • Daily Workflows

Accomplishments

  • BTS, MW, Rectifiers dismantling, transportation & re installation in Karachi & Gujranwala (45M - 02 Sites)
  • Supply & Installation of guyed masts for PTCL at various locations in Azad Jammu Kashmir ( Height 30m- 7 Sites)
  • Dismantling of BTS sites, transportation and Installation of BTS Sites along with Civil Works, Telecom Installation etc,In Central Region
  • Soil Investigation, DED from third Party, Civil Works, for PTCL Sites at various locations in North Region
  • Site hunting, selection of appropriate sites for installation, arranging NOC, all legal matters and power connections in Central Region
  • Survey, soil investigation, design & drawing, BOQ and Construction of repeater building along with 30M SS tower at Lowari Top, KPK
  • Technical Survey, Drawing & Design, Civil works & Telecom Installation for PTCL EVDO 140 SITES PROJECT (12 SITES)
  • Technical Survey, Construction of 45M high tower green field BTS site,building and allied works in Kohat (01 Site)
  • Technical Survey, Design & Drawing ,Civil works & Telecom installation works for PTCL EDO Project in Northern Areas (28 sites)
  • Design & Supply of Guyed Mast along with complete accessories (3 TOWERS)
  • TSSR, Design , BOQ and Civil Works and Turnkey services for Telenor GSM Project.(In DIR, Malakand, Chitral and Wazirstan – 02 sites)
  • TSSR, Design , BOQ and Civil works & allied infrastructure for CDMA/WLL Project (in Mansehra, Batgaram, Chalas & Waziristan – 10 sites)
  • TSSR, Design , BOQ, Costing ,Civil works & allied infrastructure for NTR/PTCL Project (Dir - 02 sites)
  • Construction of Sapphire Tower in Islamabad Phase-I (07 Story), Supervised like electrical, plumbing, fire alarms and telecom etc)
  • Construction of repeater building along with 30M SS tower at Lowari Top, KPK
  • Construction of office building, RCC Road & Boundary Wall, Supervised like electrical, plumbing, fire alarms and telecom etc)
  • Construction of Boundary Wall at Rawalpindi
  • Construction of double story building for university at Multan, Supervised like electrical, plumbing, fire alarms and telecom etc).
  • Bidding and implementation expert for the Telecommunication infrastructures of OSP/ISP (Long haul OFC, FTTH, GPON)
  • Expert for the electrical works of BTS sites, Telephone Exchanges and Commercial Buildings for Commercial Power, Generator Supply, Solar Supply, Fire alarms and Safety measures

Playing Hocky and Bedmenton

Favorite games are Hockey and Badminton 

Timeline

General Manager(Tech)/Consultant Engineer - Sachal Telecom (Pvt) Ltd
01.2020 - 07.2023
General Manager (Tech)/Consultant/OFC Expert - Sachal Telecom (Pvt) Ltd
01.2015 - 12.2019
Project Engineer (Electrical) - Sachal Technical Services International (Pvt) Ltd
01.2012 - 01.2021
General Manager (Tech)/Consultant - Sachal Telecom (Pvt) Ltd& Sachal Technologies Inc (Pvt) Ltd
03.2009 - 12.2014
Project Manager - Sachal Technologies Inc (Pvt) Ltd
01.2005 - 03.2009
Project Manager (Tech) - Sachal Telecom (Pvt) Ltd, Sachal Technologies Inc (Pvt) Ltd
01.2000 - 12.2004
Project Manager (Tech)/Planning Engineer/Deputy Project Coordinator/Site Engineer/Assistant Engineer - Sachal Engineering (Pvt) Ltd/Sachal Telecom (Pvt) Ltd
10.1993 - 12.1999
Site Engineer (Telecom) - Associated Technologies (Pvt) Ltd
02.1992 - 10.1993
Assistant Engineer - Transenergy International (Pvt) Ltd
02.1991 - 02.1992
Work Supervised at a Glance - Sachal Group of Companies & Other Companies
01.1990 - 07.2023
Sub-Engineer (Transmission) - POTENTIAL ENGINEERS (PVT) LTD LAHORE
11.1989 - 02.1991
Punjab Board of Technical Education - Associate Engineer of Electrical Technology, Electrical Technology
NewPorts Institute of Communications And & Economics - Bachelor of Technology, Electrical Engineering
The Institution of Engineers Pakistan - Member of " The Institution of Engineers Pakistan", Engineers Member # A/3065-I/8180
AutoCAD Professional College - Certificate in AutoCAD (2d+3d), Professional Skill
Govt High School - High School Diploma,