Overview
Work History
Education
Skills
Websites
Certification
Cnic
Birth Place
Personal Information
References
Timeline
Hi, I’m

SYED MUHAMMAD ATIF

Karachi,SD
SYED MUHAMMAD ATIF

Overview

26
years of professional experience
9
years of post-secondary education
3
Certifications

Work History

Gasco Engineering
Thar Parkar

Mechanical Planning Engineer
04.2024 - Current

Job overview

Equipment

  • MTU Diesel 16V 4000 G23 9*Engine's

Responsibilities

  • Prepare & manage all equipment P.M C.M/Breakdown maintenance plans.
  • To make sure all required tools, parts of equipment available before and during maintenance.
  • Communicate with Procurement and also Vendors for maintenance of engines.
  • Manage and planning of maintenance team for maintenance which is required.
  • Lead Mechanical Maintenance team.
  • Coordination with Vendors and Procurement for enquiries and requirements regarding Engine maintenances.

Yunus Textile Mills
Karachi

Manager ( Utility Mechanical)
08.2022 - 04.2024

Job overview

Equipments

  • Wartsila 18V32 DF 2 Engines 12MW
  • JMS624 1 Engine 4 MW
  • CAT CG260 3 Engines 12 MW
  • MTU 16V4000L64F 1 Engine 2 MW
  • MTU 20V4000L32F 3 Engines 6 MW
  • ZOZEN Coal Fired Boiler 25 Ton/Hr 3 Boilers 75 Ton
  • WHRBs 4 Boilers 40 Ton
  • GAS Fired Boiler 10 Ton/Hr
  • STEIN Fesal Boiler 10 Ton/Hr
  • Pumps Centrifugal, Multi-stage.
  • Compressor (Speree HL2/90, Gardner Denver ESM-22 and Atlas Copco G22)

Responsibilities

  • Prepare & manage all equipment P.M C.M/Breakdown maintenance plans.
  • To make sure all required tools, parts of equipment available before and during maintenance.
  • Communicate with Procurement and also Vendors for maintenance of engines or any other equipment.
  • Manage and planning of maintenance team for maintenance which is required.
  • Lead Mechanical Maintenance team.
  • Coordination with Vendors and Procurement for enquiries and requirements regarding utility maintenances.

K-Electric
Karachi

Senior Assistant Engineer
01.2010 - 08.2022

Job overview

  • 100 MW combine cycle power plant ( 32 Nos Jenbacher Gas 1
  • Engine Model JGS -620 JGNL 3 MW Each and 9.5 MW Allen Steam Turbine.
  • To do & supervise corrective and preventive maintenance activities.
  • Prepared & manage all engine upcoming maintenance planning.
  • To make ensure all required parts of engine during replace in maintenance.
  • Communicate with Procurement and also Vendors for maintenance of Engines, Turbine and any other equipment/machines.
  • Lead Mechanical Maintenance team.

M/s Premier Industries
Karachi

Power House In-charge
03.2004 - 01.2010

Job overview

  • Total plant capacity 2.5 MW. 1
  • 1 Nos
  • Waukesha Gas Engine Model #L-5794 LT 1 MW. 2
  • 1 Nos
  • Jenbacher Gas Engine Model # JGS-320 JGNL 1 MW. 3
  • 1 Nos
  • Standby Caterpillar DieselEngine 435 KW. 4
  • Operation & Maintenance of Generator & Atlas Copco Air Compressor.
  • Making year-wise planning of maintenance schedule of engine and to line up all related material and resources.
  • Making monthly Shift Schedule of Power House Staff.
  • Generation and analysis of reports containing, per unit Cost, fuel consumption and monthly power generation etc.

M/s Baluchistan Glass Ltd
Balochistan

Shift Engineer
07.2003 - 03.2004

Job overview

  • Total Plant Capacity 2 MW. 1
  • 2 Nos
  • Jenbacher Gas Engine Model # JGS-320 JGNL 1 MW 2
  • Each. 3 Nos
  • Caterpillar Diesel Engine Standby.
  • To perform daily corrective and preventive maintenances and generate reports.

M/s Kassim Textile
Karchi

Shift Incharge
11.2002 - 07.2003

Job overview

  • Total Plant Capacity5.27 MW. 1
  • 2 Nos
  • Jenbacher Gas Engine Model JGS-320 JGNL 1 MW each. 2
  • 1 Nos
  • Jenbacher Gas Engine Model # JMS-320JGML 1 MW. 3
  • 2 Nos
  • Waukesha Gas Engine Model # L-7042G 635 each. 4
  • 2 Nos
  • Standby Cummins Diesel Engine 500 KW each.
  • To perform corrective and planned maintenance and planning.

M/s Baig Spinning Mill
Karachi

Shift Incharge
03.2001 - 11.2002

Job overview

  • Total Plant Capacity 3 MW. 1
  • 2 Nos
  • Jenbacher Gas Engine Model JGS-320 JGNL 1 MW each. 2
  • 1 Nos
  • Stand by Caterpillar Diesel Engine Model# 3612 1 MW.
  • To perform corrective and planned maintenance and planning.

M/s Kassim Textile
Karachi

Senior Operator
10.1998 - 03.2001

Job overview

  • Total Plant Capacity 3.27 MW. 1
  • Nos
  • Waukesha Gas Engine Model # L-7042G 635 KW each. 2
  • 2 Nos
  • Jenbacher Gas Engine Model JGS-320 JGNL 1 MW each.
  • To perform corrective and planned maintenance and planning.

Education

New Ports Institute
Karachi, Karachi

B-Tech Pass
01.2007 - 04.2011

University Overview

Government College of Technology
Karachi, Karachi

Diploma
01.1996 - 04.1998

University Overview

Bright Career Public School
Karachi, Karachi

Matriculation
01.1992 - 04.1994

University Overview

Skills

Advanced lube oil analysis

Certification

Scaffolding Inspection 2022

Cnic

Cnic
42101-0564091-1#301

Birth Place

Birth Place
Karachi

Personal Information

Personal Information
  • Date of Birth: 12/07/78
  • Gender: Male
  • Nationality: Pakistani

References

References
References available upon request.

Timeline

Mechanical Planning Engineer
Gasco Engineering
04.2024 - Current
Manager ( Utility Mechanical)
Yunus Textile Mills
08.2022 - 04.2024
Senior Assistant Engineer
K-Electric
01.2010 - 08.2022
New Ports Institute
B-Tech Pass
01.2007 - 04.2011
Power House In-charge
M/s Premier Industries
03.2004 - 01.2010
Shift Engineer
M/s Baluchistan Glass Ltd
07.2003 - 03.2004
Shift Incharge
M/s Kassim Textile
11.2002 - 07.2003
Shift Incharge
M/s Baig Spinning Mill
03.2001 - 11.2002
Senior Operator
M/s Kassim Textile
10.1998 - 03.2001
Government College of Technology
Diploma
01.1996 - 04.1998
Bright Career Public School
Matriculation
01.1992 - 04.1994
SYED MUHAMMAD ATIF