Summary
Overview
Work History
Education
Skills
Certification
Career Trajectory
Training Workshops Attended
Short Courses Certificates
Personal Information
Timeline
Generic
SYED AHMED ALI

SYED AHMED ALI

DEPUTY MANAGER MAINTENANCE
KARACHI

Summary

Energetic and organized professional with knack for effective leadership and problem-solving. Possesses deep understanding of operational management and excels in strategic planning and team coordination. Committed to driving organizational success through innovative solutions and efficient processes.

Overview

14
14
years of professional experience
4
4
years of post-secondary education
1
1
Certification

Work History

Deputy Manager Maintenance (Technical)

Dalda Foods Pvt LTD
Karachi, Sindh
01.2024 - Current
  • Oversee project execution per engineering drawings, ensuring adherence to technical specifications, quality standards, and compliance with industry regulations.

    Lead and monitor preventive and corrective maintenance activities to ensure maximum equipment uptime, reducing unplanned downtime by 80%.

    Maintain critical spare parts inventory with 90% availability, optimizing stock levels by 70-90% to reduce costs while ensuring operational readiness.

    Negotiate, review, and manage service contracts and vendor agreements, ensuring compliance with engineering and safety standards.

    Develop and manage maintenance budgets for annual projects, optimizing expenditures by 30% while improving asset reliability and performance.

    Implement predictive maintenance programs of rotary equipments to enhance equipment lifespan, increase preventive maintenance coverage by 80-90%, and reduce failures.

    Conduct 04 technical training programs annually , establish performance goals, and provide mentorship to enhance team capabilities and efficiency.

    Ensure full compliance with food safety and regulatory standards (SFA, YUMS, FSSC) and enforce workplace safety protocols per industry SOPs.

AM Plant Maintenance & Utilities

COLGATE-PALMOLIVE PAKISTAN LTD
Kotri, Sindh
06.2015 - 12.2023
  • Successfully implemented 5S and Kaizen methodologies, driving continual improvement, enhancing productivity, and increasing efficiency in the workplace
  • Optimized manpower utilization by allocating resources effectively, ensuring timely response to departmental concerns, maintaining smooth operations, and maximizing productivity
  • Developed a comprehensive strategy to maintain key performance indicators (KPIs) such as reducing downtime between 20-30%,, increasing MTBF between 12-15 months , and Scheduled compliance by 90% for all refinery plant equipment, improving overall equipment effectiveness and performance-
  • Successfully implemented and followed the asset life cycle management approach, making informed decisions regarding equipment replacement and maximizing the value of assets
  • Developed and maintained SAP PM Plans, efficiently managing breakdown records, analyzing reliability issues, and implementing proactive strategies to reduce breakdown events and improve equipment reliability
  • Effectively managed critical spare inventory for relevant equipment parts, ensuring optimal stock levels, minimizing downtime, and ensuring uninterrupted operations
  • Proposed and executed utility-related projects, including UF-RO plant installation, fire tube boiler upgrades, and screw compressor commissioning, enhancing operational efficiency and reliability
  • Led the fabrication process, ensuring adherence to design specifications, quality standards, and project timelines, resulting in successful fabrication projects
  • Implemented HAZOP in critical processes, conducting safety risk assessments and recommending re-engineering or modifications to meet compliance standards and enhance safety measures
  • Maintained ISO documentation & fulfilled the safety compliances to ensure the minimize the safety risks on workplace
  • Successfully implemented predictive maintenance measures, utilizing vibration analysis and thermography techniques to minimize unplanned maintenance and optimize equipment performance
  • Monitored operational parameters and condition monitoring data for utilities equipment, optimizing their performance and preventing unforeseen failures

Mechanical Engineer

MAPAK EDIBLE OIL REFINERY LTD
Karachi, Sindh
11.2015 - 06.2016
  • Conducted 04 monthly inspections of storage tanks, pumps, and pipelines, ensuring their integrity and promptly identifying potential issues
  • Developed comprehensive checklists for inspecting and maintaining coal-fired boilers (water tube), solvent extraction plants, and coal-fired seed crushing plants, improving operational efficiency and minimizing downtime
  • Led the successful pre-commissioning and commissioning processes for static and rotary equipment, ensuring smooth and efficient operations from the start

Maintenance Engineer

AMRELI STEELS LTD, DHABEJI
Karachi
08.2013 - 10.2015
  • Performed preventive and corrective maintenance on critical plant equipment, including induced draft fans, generators, heat exchangers, compressors, cooling towers, and FES (Fume extraction system), ensuring their optimal performance and minimizing unexpected breakdowns
  • Efficiently managed breakdown and planned maintenance activities, including electric overhead cranes and hydraulic systems, minimizing disruptions and maximizing equipment uptime
  • Ensured strict adherence to standard operating procedures (SOPs) and equipment checklists, promoting consistent and standardized maintenance practices across the plant
  • Performed root cause failure analysis on critical equipment, leading to more effective preventative measures.
  • Developed preventive maintenance schedules for the different rotary and static equipment i-e:nduced draft fans, generators, heat exchangers, compressors, cooling towers, and FES (Fume extraction system), to minimize downtime and optimize performance.
  • Cleaned and lubricated parts to keep equipment operating at peak performance.

Service Engineer

S.M JAFFER & CO
05.2011 - 07.2013

Education

B.E - MECHANICAL

MEHRAN - UET
Jamshoro, SD
12.2006 - 05.2011

Skills

Staff management

Workload management

Team collaboration

Project management abilities

Time management

Team building

Problem-solving

Decision-making capacity

Cost analysis and savings

Continuous improvement

Predictive maintenance

Asset management

Preventive Maintenance

Safety protocols

Energy management

Work order management

Certification

CMRP, 2027

Career Trajectory

  • Dalda Foods Pvt LTD, Deputy Manager Maintenance (Technical), 01/01/24, Present, Execute project civil works according to the provided drawings, ensuring adherence to specifications and quality standards., Follow up and monitor maintenance activities to ensure smooth and efficient operations of all refineries, addressing any issues promptly., Manage, review, and devise contractor bids and agreements to ensure they meet engineering requirements and compliance standards., Conduct thorough evaluations during site visits prior to assigning maintenance jobs, identifying potential challenges and planning accordingly., Arrange and maintain an inventory of critical spares, ensuring availability to prevent operational downtime., Prepare detailed budgets for projects and maintenance activities, and optimize the inventory to balance cost efficiency with operational readiness., Maintain accurate permit-to-work records and ensure adherence to Lockout/Tagout (LOTO) procedures to guarantee a safe working environment for all personnel., Conduct team development sessions to improve their skills.
  • COLGATE-PALMOLIVE PAKISTAN LTD, AM Plant Maintenance & Utilities, 06/01/15, 12/31/23, Successfully implemented 5S and Kaizen methodologies, driving continual improvement, enhancing productivity, and increasing efficiency in the workplace., Optimized manpower utilization by allocating resources effectively, ensuring timely response to departmental concerns, maintaining smooth operations, and maximizing productivity., Developed a comprehensive strategy to maintain key performance indicators (KPIs) such as downtime, OEE, MTBF, and MTTR for plant equipment, improving overall equipment effectiveness and performance., Successfully implemented and followed the asset life cycle management approach, making informed decisions regarding equipment replacement and maximizing the value of assets., Developed and maintained SAP PM Plans, efficiently managing breakdown records, analyzing reliability issues, and implementing proactive strategies to reduce breakdown events and improve equipment reliability., Effectively managed critical spare inventory for relevant equipment parts, ensuring optimal stock levels, minimizing downtime, and ensuring uninterrupted operations., Proposed and executed utility-related projects, including UF-RO plant installation, fire tube boiler upgrades, and screw compressor commissioning, enhancing operational efficiency and reliability., Led the fabrication process, ensuring adherence to design specifications, quality standards, and project timelines, resulting in successful fabrication projects., Implemented HAZOP in critical processes, conducting safety risk assessments and recommending re-engineering or modifications to meet compliance standards and enhance safety measures., Maintained ISO documentation & fulfilled the safety compliances to ensure the minimize the safety risks on workplace., Successfully implemented predictive maintenance measures, utilizing vibration analysis and thermography techniques to minimize unplanned maintenance and optimize equipment performance., Monitored operational parameters and condition monitoring data for utilities equipment, optimizing their performance and preventing unforeseen failures.
  • MAPAK EDIBLE OIL REFINERY LTD, Mechanical Engineer, 11/01/15, 06/30/16, Conducted monthly inspections of storage tanks, pumps, and pipelines, ensuring their integrity and promptly identifying potential issues., Developed comprehensive checklists for inspecting and maintaining coal-fired boilers (water tube), solvent extraction plants, and coal-fired seed crushing plants, improving operational efficiency and minimizing downtime., Led the successful pre-commissioning and commissioning processes for static and rotary equipment, ensuring smooth and efficient operations from the start.
  • AMRELI STEELS LTD, DHABEJI, Maintenance Engineer, 08/01/13, 10/31/15, Performed preventive and corrective maintenance on critical plant equipment, including induced draft fans, generators, heat exchangers, compressors, cooling towers, and FES (Fume extraction system), ensuring their optimal performance and minimizing unexpected breakdowns., Efficiently managed breakdown and planned maintenance activities, including electric overhead cranes and hydraulic systems, minimizing disruptions and maximizing equipment uptime., Ensured strict adherence to standard operating procedures (SOPs) and equipment checklists, promoting consistent and standardized maintenance practices across the plant., Conducted root cause analysis, performed case studies, and prepared accurate cost estimates and maintenance budget, facilitating informed decision-making and cost-effective resource allocation.
  • S.M JAFFER & CO, Service Engineer, 05/01/11, 07/31/13

Training Workshops Attended

  • Non-Intrusive Inspection
  • Leadership in Action
  • Advanced Maintenance Management
  • Lubrication Management
  • Ultrasonic
  • Plant Reliability
  • Industrial Asset Management

Short Courses Certificates

  • Six Sigma (Green Belt)
  • AutoCAD 2D & 3D
  • Solid Edge V.19
  • Ansys V.10
  • CNC Machines (Programming & Operations)
  • Ultrasonic
  • Risk Based Inspection
  • Motion Amplification
  • Plant Reliability
  • Asset Management
  • Project Management
  • Risk Assessment

Personal Information

Passport Number: DR5176732

Timeline

Deputy Manager Maintenance (Technical)

Dalda Foods Pvt LTD
01.2024 - Current

Mechanical Engineer

MAPAK EDIBLE OIL REFINERY LTD
11.2015 - 06.2016

AM Plant Maintenance & Utilities

COLGATE-PALMOLIVE PAKISTAN LTD
06.2015 - 12.2023

Maintenance Engineer

AMRELI STEELS LTD, DHABEJI
08.2013 - 10.2015

Service Engineer

S.M JAFFER & CO
05.2011 - 07.2013

B.E - MECHANICAL

MEHRAN - UET
12.2006 - 05.2011
SYED AHMED ALIDEPUTY MANAGER MAINTENANCE