Summary
Overview
Work History
Education
Skills
Accomplishments
Affiliations
Additional Information
Software
Certification
Timeline
Generic
Syed Abdullah

Syed Abdullah

Senior Deputy Manager Electrical
Lahore

Summary

To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

7
7
years of professional experience
9
9
years of post-secondary education
1
1
Certification
2
2
Languages

Work History

Senior Deputy Manager Engineering

US Apparel & Textile Private Limited Unit V
Lahore
2016.01 - Current

HOD: Electrical/Electronics, Power House, Air Generation, HVAC & Fire Alarm/Hydrant System

  • Handling and looking after of LESCO administrative, legal and documents related issues for US-5 & US-2 BIII connections, having Sanction Load of 2500KW & 2000KW respectively along with BII and Two H1 Connections.
  • Looking after Electrical Workshops and handling of overall electrical maintenance of unit.
  • Looking after Electronics lab and handling of overall electronic related maintenance of unit
  • Looking after Power Generation of 2.15 MW Power plant, having Diesel Engine of MTU-18V200G26F, Cat D-3412 and Cat C-18
  • Looking after the operation and maintenance of 1.47 MW Solar Park.
  • Looking after the operation and maintenance of Air Compressors. (Two Atlas Copco GA160VSD, Kaeser CSDX-165, BSD-75, CSDX-140, Power 160KW, 90KW, 75KW and 37KW respectively)
  • Looking after the Projects and Sustainability of complete facility in all aspect.
  • Working closely with plant Engineering, Maintenance and Production departments to provide reliable support systems for 24/7 operations.
  • Working on Engineering tools application such as inventory control, Downtime/overtime control, Maintenance costs, CAPEX & OPEX of utilities and efficient productivity techniques.
  • Developing and Controlling of Annual Maintenance & Utilities Budget plan, Capex Budget, critical item list and shelf life of inventory in main store.
  • Working on the project planning, project Cost Estimation and Execution of all Civil/ Mechanical /Electrical Projects in the mill.
  • Looking after Corrective & Proactive Maintenance (Predictive and Preventive) of machineries in GWP (Garments wet process), GDP (Garment Dry Process) and other production machinery, i.e., TONELLO Washers, YILMAK Hydro, Curing Ovens, TRIVENETA & YILMAK Dryers, JEANOLOGIA Twin super Laser machines & Ozone machine, Tuka Tek Spreaders, multilayer machine, Spray Booths, 3D Wrinkle, Scrapping machines etc.
  • Looking After the operation & maintenance of HVAC system in complete facility.
  • Looking After the operation and maintenance of integrated fire alarm system (Apollo) and Fire Hydrant System (1000 GPM, UL/FM approved pumps

Internship

Packages Limited, Lahore
Lahore
2015.07 - 2015.08
  • Analyzed problems and worked with teams to develop solutions.
  • Took Part in Kaizen Championship.
  • Made Skill Matrix for CPD Department Packages Ltd.
  • Analysis & Suggestion on flap sealing issues and Bulk height issues.
  • LUX Monitoring and Energy Analyzer.

Internship Student

Siddiq Trade Center, Lahore
Lahore
2011.05 - 2011.06
  • Conducted extensive research for startup company projects.
  • Performed Technical Energy Audit of Commercial Buildings, Motors, and HVAC system
  • Identified Annual energy losses and developed detailed report.

Education

Matriculation - Science

The Moon Light School
Lahore
2006.08 - 2008.08

FSC Pre-Engineering - Science

Punjab College of Science
Lahore
2008.09 - 2010.06

Bachelor of Science - Electrical Engineering

University of Management And Technology
Lahore
2010.11 - 2015.11

Skills

    Project manager supervision

undefined

Accomplishments


  • Complete MEP Designing, Budgeting, Erection and Commissioning of 10,000 garments/day, LEEDS PLATINIUM CERTIFIED Project, having the Total Covered Area of 113,000 Sq. feet
  • Reduction of 54% GHG emission, in absolute value, in comparison to the 2019, base year. A Total emission of 8.3 million KG of CO2 was removed via various engineering projects and techniques.
  • Designing, Budgeting, Erection and Commissioning of 1.47 MW Solar Park.
  • Reduction of Energy Consumption (KWHe) by 28% in absolute and 36% in normalize figure from the base year of 2019 to 2022.
  • Extension of load of 1200 KW to 2500 KW from LESCO Pakistan.
  • Complete working and approval of 600MCF Captive Power Gas connection from Sui Northern Gas Pakistan.
  • Designing, Budgeting, Erection and Commissioning of 2000KVA PEL Step down Transformer, 1250 KVA MTU Diesel Engine, Atlas Copco 160KW variable speed Air Compressor along with heat recovery and 5 Cargo Lifts with gearless motors along with energy recovery devices, having the capacity of 3 tons, 2 tons and 1.15 ton.
  • Designing, Budgeting, Erection and Commissioning of, Eighteen TONELLO Washers, Nine YILMAK Dryers, Two TRIVENTA Dryers, Three YILMAK Hydro, Six JEANOLOGIA Twin Super Laser machine, Five Pocket Setter and Two TUKA TEK spreaders, in washing sewing and cutting department.
  • Designing, Budgeting, Erection and Commissioning of Sewing lines with the Capacity of 10,000 Garment/ Day and a module line of 1000 Garments/Day
  • Designing, Budgeting, Erection and Commissioning of 1000 GPM UL/FM Approved Fire Hydrant System.
  • Designing, Budgeting, Erection and Commissioning of Building Management System with more than 100 IOT devices for controlling different aspects of building and accurate measuring of electricity, steam, compressed air and water.
  • Costing, designing and In-house Developing of 3d Wrinkle Machines and Garment Turner Machine.
  • Budgeting, Erection and Commissioning 2 Ton RO water drinking Plant for whole facility
  • Budgeting, Erection and Commissioning 12 Ton RO plant for Boilers.
  • Budgeting, Construction and Electrification of new Mosque having the capacity of more than 500 people.
  • Replacement of 1100 75Watt Ceiling fans with energy Efficient 50-Watt Ceiling Fans.
  • Replacement of Clutch motors with Servo motors in sewing in order to save 50% electricity in comparison to the previous system.
  • Designing, Budgeting, Erection and Commissioning of evaporative air-cooling system in sewing lines.
  • Budgeting and commission of boiler condensate tank.
  • Budgeting, Dismantling and undergrounding of diesel tank.
  • Dismantling of HFO 5-ton boiler and Commissioning of 10 Ton Wood Boiler.
  • Installation of Public Announcement System.
  • Commissioning of Telephone Exchange having capacity of 95 pairs.
  • Commissioning of new Attendance Machines.

Affiliations


  • Institute of Electrical and Electronics Engineers (IEEE)
  • Institute of Electrical and Electronics Engineers of Pakistan (IEEEP)

Additional Information

Father's Name: Syed Muhammad Hassan

Date of Birth: 30th June, 1992

Nationality: Pakistani

Marital Status: Married

N.I.C Number: 35202-2848576-7

Software

AutoCAD

Microsoft Office

Proteus ISIS, Eagle

MATLAB

MultiSim

WinSpice

ETAP 12.6

Certification

SAACIWCE Labor & HR Dept. Govt. of Punjab

Timeline

SAACIWCE Labor & HR Dept. Govt. of Punjab

2017-03

Senior Deputy Manager Engineering

US Apparel & Textile Private Limited Unit V
2016.01 - Current

Internship

Packages Limited, Lahore
2015.07 - 2015.08

Internship Student

Siddiq Trade Center, Lahore
2011.05 - 2011.06

Bachelor of Science - Electrical Engineering

University of Management And Technology
2010.11 - 2015.11

FSC Pre-Engineering - Science

Punjab College of Science
2008.09 - 2010.06

Matriculation - Science

The Moon Light School
2006.08 - 2008.08
Syed AbdullahSenior Deputy Manager Electrical