Experienced Electrical Engineer with expertise in designing, testing, commissioning, and troubleshooting electrical equipment. Strong knowledge of relevant standards and codes, and a proven track record of success in the Energy Sector. Collaborative team player with a positive attitude and a strong work ethic.
Overview
10
10
years of professional experience
7
7
years of post-secondary education
2
2
Certifications
Work History
Manager Electrical
OMS PVT
Karachi
08.2018 - Current
Protection Relay Testing witnessing of 132kV Transmission line, Power Transformer and Bus bar Protection during Annul testing of Power Plant
Coordinating with power purchaser and power regulatory authority and reporting KPIs to lenders
Managing execution and supervision of Electrical works to ensure reliability, efficiency and availability of Plant
PV Power Plant planning and undertaking scheduled maintenance
Confirm plant performance meets established standards, operating goals, permits & contracts and to identify improvement opportunities
Routine and condition-based testing of PV modules
Planning and undertaking scheduled maintenance
Responding to breakdowns
Diagnosing faults
Rendered technical drawings and electrical systems specifications exceeding company standards.
Prepared detailed reports on electrical systems and components for project review.
Assisted in installation of electrical systems and components for commercial and industrial applications.
Evaluated and identified opportunities to improve performance of electrical systems.
Coordinated with vendors to identify and procure appropriate equipment necessary for project completion.
Wrote protocols, qualification documents, test plans and test reports for quality assurance purposes.
Analyzed and documented test results to comply with industry standards.
Implemented and approved design control procedures for electrical development in accordance with regulatory guidelines.
Applied principles of electrical theory to advance and improve product development and efficiency.
Electrical Secondary Design Engineer
Siemens
Karachi
05.2014 - 08.2018
Prepare concept diagram, Trip logic, Relay list & signal list
Designing and Execution of control, protection & Local control cubicle schematics on the basis of concept diagram, trip logic & Signal list
Develop Interlocking logics for Circuit Breaker, Isolators and Earthing Switches
Cable Planning of Control and Protection schemes
Develop interfacing between HV devices (CB, DS, CT’s etc) and control / protection cubicles
Selection of different components.
Holding frequent meeting with customer and consultant to clarify technical points in order to finalize control/Protection schemes.
Getting approval from Consultant like NESPAK/BARQABB/WAPDA/KE etc Of various control & Protection schemes.
Prepare Single line diagram of ACDB, DCDB, Emergency lighting, 48V DCDB.
DC and AC Load Calculations
Coordination with supplier of 220/132kV Circuit Breaker, Disconnector s, Transformer, CT’s, and CCVT ’s in order to finalize our control & protection schemes and to avoid any ambiguity during execution work at site
Technical Calculation for Current Transformer
Technical Calculation for Voltage Transformer
Termination of all external panel(e.g) Fault recoder, Event recorder, Battery charger,PLC,transformer fan control panel, trafo motor drive unit, HV devices (CB, Isolator,busbar Isolator,VT,CT, gas compartment etc)
Prepare complete checklist of projects & implement relevant quality issues
Relay Settings
Complete FAT (Factory Acceptance test) drawings
Electrical Engineer
Rabbaf Engineering Private Limited
Lahore
03.2013 - 04.2014
MV and LV System Commissioning
Commissioning of 11KV switchgears, 11/0.4KV Distribution Transformer, 11KV Capacitor Banks, 400V Switchgears Testing, Battery Chargers and Batteries testing
Established of Primary engineering design drawings :
Established single Line Diagram, Switchyard layout, Cable tray layout, Panel arrangement layout plan
Preparation of all interfacing details of substation including control and power cable layout plan and associated schedule
Preparation of overall Cable Termination plan
Develop interfacing between HV devices (CB, DS, CT’s etc) and control / protection cubicles
Holding frequent meeting with customer and consultant to clarify technical points in order to finalize control/Protection schemes
Getting approval from Consultant like NESPAK/BARQABB/WAPDA/KE etc Of various control & Protection schemes