Summary
Overview
Work History
Education
Skills
Constructions Skills:
Timeline
Generic

SHAHZAIB SHAKOOR

CIVIL ENGINEER
KARACHI

Summary

OBJECTIVE:

Seeking a demanding & quality oriented position in an organization to gain work experience and knowledge in the practical field and to be an integral part of good environment that could make effective use of potential and contribution towards achievement of organizational objectives and personal growth. An experienced Civil Engineer having diverse experience specialized in construction and project management of Infrastructure projects & execution including Architecture, MEP and design coordination. In my career of Civil Engineering I’ve done complete Infrastructure projects including Bridges, Culverts, Storm Water Drainge, Sewerage and complete Utility Services. Capable of Project Management, QA/QC, Project Execution, Precast Concrete, Quantities & Cost Evaluation, Construction Planning.

Overview

10
10
years of professional experience
1
1
Language

Work History

Construction Manager

BAHRIA TOWN (PVT) LTD
Karachi
01.2020 - Current

PROJECT OF:

Infrastructure Development

JOB RESPONSIBILITIES:

✓ Earth Work

✓ Structure (Culverts and Drainage)

✓ Sewerage Work

✓ Water Supply

  • Report to General Manager.
  • Earthwork volume Calculation.
  • Observation of Typical Drawings.
  • Sort out entire problem regarding Earthwork Including Quality, Culvert, Drainage, Water Supply, Survey and Alignment at site as per standards.
  • Developed and implemented comprehensive schedule of preventive maintenance and repair work.
  • Ability to execute work at site and troubleshoot execution problem at site with prompt on site decisions.
  • Supervised team of "57" construction workers to maintain productivity and quality of work.
  • Experience in Road Construction, Asphaltic Wearing Course, Asphaltic Base Course, TST, Aggregate Base Course, Sub Base and all Embankment Layers, Curb Stones, Tuff Tile &Pavers.
  • Sewerage Systems, Water supply systems, Storm water drains.
    Electrical Foundation, Electrical cables and networks.
  • Laying Compound under Ground services.
    Worked on Over Head water Tanks, Underground Tanks & Boundary Walls.
  • Assist in making any changes to construction design to make project more feasible and eco friendly.
  • Responsible for ensuring that project meets all environment and construction laws and does not violate same in any case.
  • Assist in maintenance of the Project getting required approvals & etc.
  • Assist in Project Planning, Implementation, Supervision.
    Drafting reports and Schedules.
  • Responsible for effective maintenance of Project both preventive and corrective.
  • Assist in maintenance planning and implementation of same to avoid accidents.
  • Used computer software to design construction plans and perform calculations.
  • Verified completed projects met approved time, quality, and cost estimates.
  • Surveyed sites to determine material needs and accurately manage inventories and budgets.
  • Collaborated with contractors, architects, engineers, and public agencies to complete projects within timeline limitations and budget constraints.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
  • Established and maintained relationships with vendors to source affordable and high quality materials and equipment for construction projects.
  • Oversaw effective disposal of construction waste and implemented programs to increase use of recycled materials.
    Led weekly production and operations contractor meetings, facilitating stronger communication, and helping to resolve critical issues.
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
  • Scheduled utility service providers according to project timelines.
  • Monitored construction sites for compliance with safety regulations and adherence to standards.
  • Developed and implemented risk mitigation plan to reduce potential project delays and costs.

Assistant Project Manager

N.L.C
DHA City Karachi
04.2015 - 11.2019

PROJECT OF:

Infra Structure Development Works at DHA City with

NLC Sector-2, Karachi

  • Earth work
  • Structure (Culverts and Drainage)
  • Sewerage Work
  • Water Supply

JOB RESPONSIBILITIES:

  • Attend and Manage Internal & External coordination meetings
    with all departments and take decisions accordingly.
  • Delivering workshops to enable project team to calibrate.
  • Interface with Project Engineers, Architect, and Managers .
  • Before implementation Resolve all the quarries and issues after
    the comments of all departments responsible & get their final
    approval.
  • Collaborate and communicate with other disciplines, trade
    partners, clients, and project engineers on coordination issues
    and model development tasks.
  • Ensure all designs are in accordance with relevant
    standards and approved by relevant local authority.
  • Contributing to effective functioning of team by
    identifying with and participating in attainment of team
    objectives, communicating, and sharing knowledge.
  • Scheduling, Coordination, and Monitoring of assigned
    Projects.
  • Ensuring compliance to HSE, QA/QC, Project timeline,
    Applicable codes & standards, Performance standards and
    Specifications, Productivity, and Cost Control, Representing the
    Company in meetings with Clients, Architects, and Services
    Consultants, Design Coordination, and Assure timely supplies at
    Projects.
  • Detection of Interference/clash severity matrix.

Site Engineer

SHAMSI BUILDER (PVT) LTD
Karachi
01.2014 - 02.2015

PROJECT OF:

Infra Structure Development Works

  • Earth work
  • Structure (Culverts and Drainage)
  • Sewerage Work
  • Water Supply

RESPONSIBILITIES:

  • Collaborated with civil technicians together project equipment and update maps, drawings and blueprints.
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
  • Applied engineering principles to troubleshooting and followed up on defined corrective actions to prevent reoccurrences.
  • Developed SOPs and change controls pertaining to setup, maintenance and operation of equipment, facility and utilities.
  • Checked technical designs and drawings for adherence to standards.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Oversaw quality control and health and safety matters for construction teams.

Education

BS - Civil Engineering

SIR SYED UNIVERSITY OF ENGINEERING AND TECHNOLOGY,
KARACHI, PAKISTAN
04.2001 -

BOARD OF INTERMEDIATE & SECONDARY EDUCATION
MIRPUR KHAS, PAKISTAN
04.2001 -

Skills

    PROJECT SCHEDULING

undefined

Constructions Skills:

  • Good at Execution, Coordination, Managing, Planning, and Organizing.
  • Skilled at Analyzing and Interpreting Information.
  • Practical and logical with Good Problem-solving skills.
  • Creative and innovative supervision skills.
  • Able to work well under pressure with safety conscious.
  • Structural & Architectural Drawing Study with MEP Co-ordination.

Timeline

Construction Manager

BAHRIA TOWN (PVT) LTD
01.2020 - Current

Assistant Project Manager

N.L.C
04.2015 - 11.2019

Site Engineer

SHAMSI BUILDER (PVT) LTD
01.2014 - 02.2015

BS - Civil Engineering

SIR SYED UNIVERSITY OF ENGINEERING AND TECHNOLOGY,
04.2001 -

BOARD OF INTERMEDIATE & SECONDARY EDUCATION
04.2001 -
SHAHZAIB SHAKOORCIVIL ENGINEER