Accomplished Senior Assistant Maintenance Manager with over 10 years of experience in the cement industry. Specializes in optimizing equipment performance, minimizing downtime, and implementing strategic maintenance programs. Recognized for exceptional leadership skills, adept at leading cross-functional teams and developing effective maintenance strategies. Committed to upholding safety standards and ensuring compliance throughout all operations. Pivotal contributor to operational excellence, leveraging expertise in implementing SAP PM modules to streamline processes and drive significant cost savings.
JOB RESPONSIBILITY AS AN AREA INCHARGE OF FLS KILN 3700 T/D , POLRO KILN (7600 T/D),Alternative Fuel System,Coal Mill (RMK 30/15/230), and Packing Plant.
FLS Kiln (Capacity: 3700 T/D):
• Managed and led operations for the FLS Kiln with a daily capacity of 3700 metric tons.
• Proposed efficiency improvements, resulting in a 12% enhancement in day-to-day production activities for optimal kiln performance.
• Collaborated with cross-functional teams, ensuring high-quality standards, and adherence to safety protocols, contributing to a 20% improvement in overall collaboration efficiency.
POLRO Kiln (Capacity: 7200 T/D) & Coal Mill:
Alternative Fuel System (650 T/D):
Packing Plant(H&B):
Major Projects:-
Led modifications in the existing AF system to enhance feed capacity from 500 t/d to 650 t/d, optimizing fuel efficiency and improving overall plant performance.
Successfully completed the implementation of SAP S/4 hana 2021 at Fauji Cement Company Limited. I was selected as a Power User (Mechanical) in Planning Module to create data base in SAP. Created plant functional location, work centers and planner groups. Created plant equipment and attached equipment catalog's.
Managed the complete design, fabrication, and installation process of a protective shed for Kiln Pair No. 2 tires and rollers, ensuring equipment longevity and minimizing operational downtime due to weather conditions.
Area Incharge of Loeche Cement Mills (53.3+3CS):- 2018-2021
AREA INCHARGE OF FLS RAW MILL ATTOX 40 2015-2018
MAJOR PROJECTS:-
Equipment maintenance and repair
Bearing Damage Analysis, Idea Trainings, BEARING ANALYSIS
Project Management (Design and Planning)