Results-oriented Land Surveyor with a proven track record in diverse surveying projects. Proficient in interpreting and implementing codes and regulations, excelling in collaborative team environments and thriving in self-directed capacities. Demonstrates exceptional communication, problem-solving, and planning skills. Detail-oriented professional adept at data compilation and efficient project management. Accomplished and experienced in residential and commercial land surveying for over 20 years. Recognized as an expert user of cutting-edge technologies, including Total Station, Laser Scanners, and Trimble Stations for large-scale topographic surveys. Background in executing volumetric surveys for landfill and chemical waste sites, ensuring comprehensive expertise in the field.
Conducted traversing to measure distances and angles for accurate mapping of project area.
Led topographic survey efforts to gather data on natural and man-made features for infrastructure design.
Utilized quantity estimation techniques to calculate material requirements for construction projects.
Prepared site data, including 46km of roads, 4 culverts, over 2000 light poles, 4 pads, and 5 guardhouses, for efficient project planning and implementation.
2. Early Works for Hawiyah Unayzah Facilities (Code:6600045004) Saudi Aramco
I played a crucial role in conducting precise traversing surveys to establish the control points necessary for accurately mapping the project area. Additionally, I meticulously conducted topographic surveys to gather detailed information about the existing features of the land, enabling the development of comprehensive site plans.
My responsibilities also included estimating quantities of materials required for the construction of roads, pads, and light poles, providing essential data for cost estimation and project planning. I was also involved in preparing site data for the efficient and effective implementation of the projects, ensuring that all necessary information was available for the successful completion of the development.
In this project, I was responsible for conducting precise surveys to accurately map the project area and establish control points for V-Ditch construction. I also played a key role in surveying and mapping the locations for the installation of light poles, ponds, roads, and the guardhouse, ensuring that all features were positioned correctly according to the project plans.
Additionally, I conducted surveys to estimate quantities of materials required for the construction of V-Ditches, ponds, roads, and the guardhouse. These quantity estimates were instrumental in cost estimation and project planning, ensuring that the necessary resources were allocated efficiently.
I worked on the establishment of evaporation ponds, site camps, and roads. I conducted detailed surveys to map out pond locations, ensured proper site camp areas for personnel and equipment, and surveyed roads for safe transportation. By providing quantity estimations and working closely with the project team, I contributed to effective project planning and implementation. My experience in these areas has prepared me for similar projects in the future.
5. Saudi Aramco – Wasit Gas Facilities (Code: SK-KS-001 & 002) SKEC
For the pipe rack foundations and anchor bolts, my responsibilities included conducting surveys to determine the precise locations and dimensions for the foundations and anchor bolts. This required accurate data collection and analysis to ensure that the structures would be properly positioned and aligned to support the piping systems.
Furthermore, I played a role in the surveying and design of roads within the project site. This included conducting topographic surveys to determine the optimal road alignments, grades, and drainage solutions to facilitate safe and efficient transportation of personnel and materials.
Throughout the project, I collaborated closely with the project team to provide detailed site data for the development of the pipe rack foundations, anchor bolts, ponds, and roads. This involved ensuring that all necessary information was available for effective project planning and implementation, as well as providing quantity estimations for materials needed for construction.
6. Saudi Aramco Karan Gas Processing Facilities (Code: KHAN-T-SC-003) HDEC
I was involved in surveying and designing for underground utilities, pipe rack foundations, and anchor bolts. This included conducting surveys to determine precise locations and dimensions for the utilities, foundations, and anchor bolts, ensuring accurate data collection and analysis for proper positioning.
7. Upgrade of Waste Water System – Western Region (Code: 6600018285) Saudi Aramco
My role primarily involved conducting surveys for waste water pipelines, manholes, and pipe rack foundations. I pinpointed the precise locations and routes for the pipelines within the existing infrastructure, analyzing topographic data to assess elevation changes and identify potential obstacles.
Additionally, I surveyed and strategized the placement of manholes, considering factors such as accessibility, ventilation, and maintenance requirements. Moreover, I surveyed the locations for pipe rack foundations to support elevated waste water pipelines, ensuring optimal positioning based on soil conditions and safety regulations.
8. Pipe rack Foundations, Flare Area Civil Works & Tanks Foundations – Saudi Aramco Khurais Gas Plant (Code: MONE-C-SC-004 & 009) Saudi Aramco
Collected measurements for pipe rack foundation locations
Gathered information on existing infrastructure for flare area civil works
Assessed terrain characteristics for tanks foundation design
Provided accurate survey data for planning and execution of construction activities
Apr. 2007 – Present (17 years)
GAMMON Pvt. Ltd., Pakistan
04.2004 - 03.2007
Projects:
1. 7th Avenue Road & Underpasses, Islamabad CDA
As a surveyor for the 7th Avenue Road project in Islamabad that involved road construction, underpasses, and wastewater pipelines, my responsibilities included conducting precise surveys to establish control points for accurate mapping of the project area. I also performed detailed topographic surveys to capture existing land features and terrain information. In addition, I collected data for the design and installation of wastewater pipelines, ensuring accurate alignment and elevation profiles.
2. N-50 Highway D.I. Khan to Mughal Kot NHA
As a surveyor for the N-50 Highway project involving five bridge constructions, my role was crucial in ensuring project success. I conducted detailed surveys to establish control points and map the area accurately, including critical land features like elevations and drainage patterns. I collected data for highway and bridge alignment, collaborated with engineers for structural design, and estimated material quantities. Through accurate survey data and close collaboration, I contributed to completing the project successfully, enhancing safety and efficiency for road users.
Apr. 2004 – Mar. 2007 (3 years)
Education
Diploma - Surveying
Govt. College of Technology Rasul
08.2000
Matric - undefined
Gujranwala Board
01.1999
Skills
AutoCAD Civil 3D (Well Skilled – Preparation of Site Data, Earthwork Calculation, Draw Cross-Sections)
Topographic Mapping
Auto Level
GPS (Trimble, Sokkia)
MS Office
Total Station (Sokkia, Topcon, Leica)
Certification
First Aid (Cardiopulmonary Resuscitation) Saudi Heart Association ID: 1972970-1-445859 2022-03-25