Summary
Overview
Work History
Education
Skills
Certification
References
Awards
Affiliations
Timeline
Generic
RANA ABDUL JABBAR KHAN

RANA ABDUL JABBAR KHAN

Electrical Engineer
Lahore

Summary

Dynamic executive with over 30 years of experience in the energy sector, specializing in power generation, transmission, and renewable energy solutions. Proven track record in leading transformative initiatives and multi-billion dollar projects, collaborating with financial institutions and government entities to drive impactful reforms. Expertise in strategic planning and operational excellence, combined with a commitment to employee welfare and sustainable practices.

Recognized for delivering measurable business growth and pioneering digital transformation in public-sector energy organizations. A research scholar with numerous publications, bringing a robust analytical approach to addressing complex energy challenges.

Overview

32
32
years of professional experience
1
1
Certification
1
1
Language

Work History

General Manager (HVDC)

NTDC
04.2024 - Current

Currently overseeing O&M of the first ever ±660 kV HVDC Matiari–Lahore Transmission Line (886 km).

  • Developed a comprehensive geospatial visualization model of the entire HVDC line, including 3D mapping of each tower by type.
  • The model serves as a scalable solution for other transmission lines, supporting improved asset monitoring, emergency response, loss reduction, and TA/DA control.
  • These digital initiatives aim to future-proof NTDC/NGC operations through sustainable, technology-driven network management.

Managing Director

NTDC
07.2022 - 04.2024

Led NTDC through a period of significant reform, modernization, and expansion, with key achievements including:

Regulatory & Strategic Milestones:

  • Finalized and secured NEPRA approval for the Grid Code (2022) and IGCEP 2022–2031.
  • Oversaw the approval of the System Operator (SO) license for NTDC in March 2023.
  • Accelerated work on IGCEP and TSEP, slated for submission to NEPRA.

Digital Transformation & Project Monitoring:

  • Introduced project management dashboards for real-time tracking of progress, risks, and issues.
  • Laid the groundwork for ERP implementation by establishing a dedicated team.
  • Infrastructure Development & Rapid Project Execution:
  • Oversaw record-fast execution of critical projects including:
  • 500 kV SECL–Matiari T/L – completed in 3 months
  • 132 kV Polan–Jiwani T/L – completed in 4 months for 100 MW import from Iran.
  • 500 kV Balloki–Lahore North–Nokhar T/L – delivered 2 months ahead of schedule.
  • Acquired strategic land for future grid stations and the 00 MW Muzaffargarh Solar Plant (2527 acres).6

Crisis Management & National Emergencies:

  • Personally led flood and storm rehabilitation efforts, restoring supply rapidly.
  • Budgetary & Financial Excellence:
  • Achieved record-high budget utilization in FY 2022–23 (PKR 95.5B vs. PKR 56.6B – 168.8% utilization).
  • Secured major funding agreements:
  • €2.5M grant with KfW for renewable energy and efficiency.
  • $250M ADB loan for hydro power project transmission infrastructure.

Capacity Building & Localization:

  • Established a state-of-the-art training center at New Kot Lakhpat, ending reliance on external academies.
  • Promoted local manufacturing through Education Orders and initiated local production of CDP meters.

Security & Innovation:

  • Mitigated sabotage-related tower collapses in Sindh through Tech-enabled surveillance (drones, AI, alarms), and law enforcement collaboration.
  • Partnered with Mehran University to develop smart security hardware for transmission assets.

Maintenance & System Resilience:

  • Implemented preventive maintenance using drones, insulator cleaning, and asset inspections, helping to prevent system collapse during an unprecedented foggy season.

General Manager (TSG)

NTDC
12.2021 - 07.2022
  • Provided strategic guidance for the prudent allocation and utilization of fiscal and operational resources, aligning with the department’s short, medium, and long-term goals.
  • Led the budgeting and strategic planning process, ensuring alignment with overall corporate objectives.
  • Continuously evaluated departmental progress against macro-level objectives, maintaining alignment with the organizational vision.

General Manager (Project Delivery North)

NTDC
01.2021 - 11.2021
  • Led the planning and execution of major transmission infrastructure projects to support national energy goals and performance targets set by the Government of Pakistan.
  • Oversaw power evacuation planning and implementation for critical hydro power and thermal projects.
  • Managed over 40 PSDP-funded Transmission Line and Grid Station projects across KPK and Punjab, ensuring timely completion and adherence to quality standard.

Deputy Managing Director (AD&M)

NTDC
01.2021 - 02.2021

Led the planning, implementation, and oversight of transmission infrastructure to meet government-mandated performance targets and ensure timely power evacuation from upcoming generation projects across KPK, Punjab, and Sindh.

Chief Executive Officer

Alternative Energy Development Board (AEDB)
08.2019 - 01.2021
  • Led AEDB as the Federal Government’s sole agency for renewable energy development, overseeing national efforts to scale up clean, affordable, and sustainablenergy solutions.
  • Took charge during a critical reform phase, driving strategic initiatives to align with national targets of achieving 20% renewable energy by 2025 and 30% by 2030.
  • Supervised implementation of renewable energy projects across Pakistan, including wind, solar, bagasse, and hybrid technologies. Finalized the Alternative & Renewable Energy Policy 2019, establishing a clear framework for sector growth.
  • Enabled nationwide roll-out of net metering through the PV Ecosystem, expanding decentralized solar energy adoption.
  • Coordinated with stakeholders to develop a future evacuation plan for upcoming wind power projects, ensuring transmission readiness.

Chief Engineer (MI/QA&I), General Manager (Technical, Technical Services Group)

NTDC
03.2017 - 08.2019
  • Led NTDC’s regulatory and technical functions, including the implementation and revision of the Grid Code, and the development of renewable energy (solar and wind) addendums. Oversaw all regulatory affairs and represented NTDC in coordination with NEPRA, ADB, World Bank, USAID, and other donor agencies.
  • Chaired feasibility development for a Secure Metering System (SMS) for coincidental Maximum Demand Indicator (MDI) calculation Established a state-of-the-art NTDC Training Center at New Kot Lakhpat, Lahore

Chief Executive Officer

IESCO -Islamabad Electric Supply Company
02.2016 - 03.2017
  • Led IESCO—Pakistan’s top-ranked electric distribution company with over US$1 billion in annual turnover and a consumer base of 2.5 million, served through 108 grid stations. Under NEPRA’s latest performance evaluation, IESCO ranked #1 among all 11 distribution companies nationwide.
  • Introduced and implemented key innovation and modernization programs to enhance operational efficiency, customer service, and sustainability.

Focal Person

QA SOLAR PARK
11.2015 - 02.2016

Served as Focal Person for Pakistan’s first utility-scale solar power initiative, the 1000 MW Quaid-e-Azam Solar Park (Phase I: 100 MW, Phase II: 300 MW, Phase III: 600 MW), overseeing construction, power evacuation, and inter-agency coordination with Zonergy, AEDB, NTDC, MEPCO, Government of Punjab, and Ministry of Water & Power.

COO (Chief Operating Officer)

QA Solar Power Company
02.2014 - 11.2015
  • Led technical bid evaluations and supervised international consultants 8p2 (Germany) and ECSP (Pakistan).
  • Conducted technical due diligence of EPC contractors CHINT and TBEA in China, focusing on module/inverter manufacturing and PR (Performance Ratio) analysis.
  • Participated in EPC contract negotiations and technical supervision with ILF (Germany).
  • Provided technical oversight for Generation License and Tariff Petition approvals with NEPRA.
  • Established an in-house R&D Directorate post-training in PV Syst (Switzerland).
  • Trained staff in technical and financial feasibility analysis for grid-connected and off-grid PV systems.
  • Set up PV module testing laboratories for quality assurance. Assisted in finalizing the Energy Purchase Agreement (EPA) with key stakeholders.
  • Coordinated with NTDC and MEPCO for 132 kV evacuation infrastructure development. Analyzed and mitigated power quality issues (harmonics, unbalance, flickering) by installing SVC banks to maintain power factor near unity.

Chief Executive Officer

FESCO
12.2012 - 02.2014
  • Led one of Pakistan’s largest electricity distribution companies, serving over 5 million consumers through 133 grid stations and a network exceeding 80,000 km of transmission and distribution lines (132kV, 11kV, 400/230V).
  • Delivered trans-formative improvements in performance, financial stability, and customer service.

Manager Design and Standards

NTDC
01.2011 - 12.2012
  • Managed prototype approvals for critical power infrastructure components including energy meters, PC poles, steel structures, LT & HT cables, CTs, PTs, 11 kV switchgear, termination kits, and conductors.
  • Authored and issued key technical specifications and Standard Operating Procedures (SOPs) to enhance system reliability and standardization

Regional Manger Technical Services

GEPCO
10.2010 - 12.2010

Managed metering operations for a distribution company serving 2.4

million consumers across four circles (Domestic, Commercial, Industrial).

Principal

Rachna College of Engineering & Technology (RCET / UET)
04.2005 - 10.2010
  • Led and promoted R&D initiatives addressing critical power sector challenges, including power quality, renewable technologies, FACTS applications, and the impact of CFL induction.
  • Supervised Bachelor’s, Master’s, and PhD research projects, facilitating high-quality academic work with publications in national and international journals.
  • Delivered lectures on Power Quality to Master’s students, contributing to academic excellence and knowledge transfer

Consultant

PEPCO (Pakistan Electric Power Company)
02.2004 - 02.2005

Managed coordination and communication with major international donors including World Bank, USAID, and Asian Development Bank (ADB) to support ongoing restructuring processes in Pakistan’s power sector.

Technical Advisor to General Manager Operation

WAPDA Pakistan
10.2003 - 02.2004
  • During this assignment, I have been investigating the Power Quality issues in big industrial units like ICL, PARCO, Pioneer Cement, Lahore Airport etc. and provided safeguard to the organization against litigation.

Assistant Director Planning

Gujranwala Electric Power Company (GEPCO), Pakistan
05.2000 - 08.2000

Sub Divisional Officer

GEPCO
11.1998 - 05.2000

Officiating Executive Engineer

GEPCO
07.1998 - 11.1998

Sub Divisional Officer

GEPCO
08.1994 - 07.1995

Junior Engineer Induction training

GEPCO
05.1993 - 08.1994

Education

PhD -

Royal Melbourne Institute of Technology (RMIT)
01.2003

MS Eng. - Electrical Engineering

University of Wollongong
Australia
01.1997

BSc/ BE - undefined

University of Engineering & Technology
01.1990

Skills

Strategic planning

Team leadership

project management

change management

regulatory compliance

MS Office

MS Project Enterprise

Primavera Project Planner

PSS/E

ETAP

SAP Utilities

Certification

Successfully completed the training programme of “Certified Director” under Code of Corporate Governance 2012 of SECP from Institute of Cost and Management Accountants of Pakistan (ICMA).

References

  • Prof. Dr. Iqbal Gondal, Cyber Security Expert, RMIT – Melbourne, Australia, Australia.
  • Prof. Dr. Majid Al-Dabbagh Former Faculty RMIT University, Australia.

Awards

Commendation Certificate by Mr. Tariq Hameed, Chairman WAPDA.

Commendation Certificate by Lt. Gen (Retd) Zulfiqar Ali Khan, Chairman WAPDA.

Letter of Appreciation by Mr. Habib Ullah, Chairman AEB, WAPDA, Gujranwala.

Based on the recent contributions while serving in NTDC, nominated for Civil Award.

Affiliations

  • Former President IEEEP Pakistan
  • Member Australian Solar Council
  • Member ISES (International Solar Energy Society)
  • Member, Institute of Engineers Australia MIE (Australia)
  • Member, World Renewable Energy Forum
  • Member, Asia Clean Energy Forum
  • Member, Thailand Renewable Energy Forum
  • Professional Engineer PEC


Timeline

General Manager (HVDC)

NTDC
04.2024 - Current

Managing Director

NTDC
07.2022 - 04.2024

General Manager (TSG)

NTDC
12.2021 - 07.2022

General Manager (Project Delivery North)

NTDC
01.2021 - 11.2021

Deputy Managing Director (AD&M)

NTDC
01.2021 - 02.2021

Chief Executive Officer

Alternative Energy Development Board (AEDB)
08.2019 - 01.2021

Chief Engineer (MI/QA&I), General Manager (Technical, Technical Services Group)

NTDC
03.2017 - 08.2019

Chief Executive Officer

IESCO -Islamabad Electric Supply Company
02.2016 - 03.2017

Focal Person

QA SOLAR PARK
11.2015 - 02.2016

COO (Chief Operating Officer)

QA Solar Power Company
02.2014 - 11.2015

Chief Executive Officer

FESCO
12.2012 - 02.2014

Manager Design and Standards

NTDC
01.2011 - 12.2012

Regional Manger Technical Services

GEPCO
10.2010 - 12.2010

Principal

Rachna College of Engineering & Technology (RCET / UET)
04.2005 - 10.2010

Consultant

PEPCO (Pakistan Electric Power Company)
02.2004 - 02.2005

Technical Advisor to General Manager Operation

WAPDA Pakistan
10.2003 - 02.2004

Assistant Director Planning

Gujranwala Electric Power Company (GEPCO), Pakistan
05.2000 - 08.2000

Sub Divisional Officer

GEPCO
11.1998 - 05.2000

Officiating Executive Engineer

GEPCO
07.1998 - 11.1998

Sub Divisional Officer

GEPCO
08.1994 - 07.1995

Junior Engineer Induction training

GEPCO
05.1993 - 08.1994

BSc/ BE - undefined

University of Engineering & Technology

PhD -

Royal Melbourne Institute of Technology (RMIT)

MS Eng. - Electrical Engineering

University of Wollongong
RANA ABDUL JABBAR KHANElectrical Engineer