AutoCAD
Currently working as Fire and Life Safety Engineer in Pragmatic Engineeria Solutions (Private Limited).
Worked as Electrical Engineer/ MEP Engineer/ MEP Coordinator/ Fire Protection Engineer on several Infrastructure & Building projects of public and private sectors in UAE, Oman and Pakistan for 8 years.
Expertise in electrical, plumbing and fire protection design review, passive and active fire protection system design & pre-qualification/Bidding documents.
Good in keeping great business and client relationships based on in-depth technical knowledge, industry awareness and communication skills.
KEY RESPONSIBILITIES:
Nature of Projects: Infrastructure & Buildings
My core responsibilities include:
1. Managing following pre contract activities of numerous projects associated with Fire Protection System design.
2. Managing following contract stage activities:
3. Managing following post contract activities:
4. Directly interfacing with the client.
5. Mentoring junior staff.
6. Contributing to the overall business development of the company.
Skills:
Additional knowledge of following project stages:
A journey of a Private Dental Clinic from establishment to operations.
Establishment:
Operations:
KEY RESPONSIBILITIES:
My core responsibilities were to:
KEY RESPONSIBILITIES:
Designing (selection of materials, sizing and layouts), supervision of the installation and coordination of MEP and Fire protection works between client, consultant and contractor of following services/utilities for infrastructure development and building construction projects;
FIRE PROTECTION (For PROPERTY AND LIFE SAFETY)
Passive Protection
Active Protection
ELECTRICAL (POWER)
1. Pre contract activities:
2. Being involved in Contract stage activities:
a. Preparation of pre-qualification documents, bidding documents and tender/pre-qualification notices.
b. Pre-qualification of bidders, bids evaluations and award of contract.
3. Managing following post contract activities:
a. Approval of materials/equipment submittals, shop drawings, mock-ups
b. Inspection of installations
c. Testing and Commissioning of electrical installations
ELECTRICAL (COMMUNICATION)
PLUMBING
KEY RESPONSIBILITIES:
1. Lighting Design (As per American and British standards)
2. Application of Design Software/Tools
3. Lightning Protection System Design (As per standard BS-EN-62305)
4. Sizing wire (Electrical Load, ampacity of wire, Voltage drop Calculation As per IEC, and NFPA-70
5. Communication works (Access control systems, public address systems, CCTV)
I did my internship on a power cable installation project of Dubai Electricity Water Authority (DEWA) where I improved my analytical abilities and technical skills necessary for engineering applications.
Recognized by Pakistan Engineering Council (PEC)
Interpersonal Skills
undefinedAutoCAD
Dialux
Relux
Pakistan Engineering Council (PEC), Registered Engineer - ELECT/37436
1. MIXED USE (RESIDENTIAL+COMMERCIAL) CENTER
Project Name: Nawras Commercial Center (NCC)
Project Description: It consists of two main towers containing (2 basements + 7 floors + Penthouse): One is dedicated for 4Star Hotel and the other is for Corporate Offices and Mall. Top floors of hotel tower containing residential apartments and Ground Floor, 1stFloor and 2nd Floor is a common Mall area of both towers.
Project Duration: Sep 2015 – Sep 2019
2. ARMS & AMMUNITION FACTORY
Project Name: Small Arms Ammunition Factory (SAAF OMPC) (Area of Land: 750 Acres)
Project Description: Project owned by Oman Munitions Production Company (OMPC) under Ministry Of Defense (MOD)
Design and construction supervision of infrastructure development works and different industrial, storage and administrative buildings
Project Duration: Jan 2015 – Jun 2017
3. CITY DEVELOPMENT (CANTONMENT DESIGN)
Project Name: Mahoot Cantonment (Area of Land: 3000 Acres)
Project Description: Ministry of Defense (MOD) Project
Design of Infrastructure Development Works and official buildings for the cantonment consisting of 78 buildings i.e. Admin Headquarter, Company camp Headquarter, Medical Centre, Communication Center, Recreational Club (Football ground + Tennis court), Mosque, Commercial buildings, Residential apartments, Educational buildings, Parade Ground, Armed Tanks Garages, Mess Building, Shooting range, Helipad, Fuel Station etc.
Project Duration: Jan 2015 – Dec 2017