A mechanical engineer having comprehensive knowledge of design analysis and maintenance of mechanical systems.Focusing on economy safety, reliability, and sustainability.I am having a comprehensive understanding of mechanical health safety regulations.
HSE Mechanical Engineer/Inspection Engineer with over 4 years of experience in the design, implementation, and management of health, safety, and environmental protocols in the mechanical engineering sector. Proven expertise in conducting risk assessments, developing safety procedures, and ensuring compliance with industry regulations. Strong analytical skills complemented by hands-on experience in mechanical systems, project management, and cross-functional collaboration. Committed to fostering a safety-first culture and enhancing operational efficiency while minimizing environmental impact.
As an Inspection Engineer/HSE Engineer INSPECTION ENGINEER / HSE Engineer PAK ARAB FERTILIZERS, Multan As a HSE Engineer, SNGPL (Faisalabad) For 3 Month duration As a HSE Engineer, SNGPL (Sadiqabad) For 2-month duration INSPECTION ENGINEER Descon Power Solution INSPECTION ENGINEER++ Best-Way -Cement Plant (Hattar) INSPECTION ENGINEER JES, PSO, KARACHI INSPECTION ENGINEER SNGPL, Wah Region INSPECTION ENGINEER MOL NDT INSPECTION ENGINEER JES, PORT QASIM INSPECTION ENGINEER QUAID-E-AZAM POWER PLANT (BHIKKI 1180MW) HSE ENGINEER SNGPL, MARDAN For 1 month duration
• Ultrasonic testing of piping, lines, storage tanks, pressure vessels and boilers
• Dye Penetrant Testing of piping, lines, storage tanks, pressure vessels and boilers
• Magnetic Particle Testing of piping, lines, storage tanks, pressure vessels and boilers
• Time of flight Diffraction (TOFD) of piping, lines, storage tanks, pressure vessels and boilers
• Phase Array Ultrasonic Testing (PAUT) of piping, lines, storage tanks, pressure vessels and boilers
• Co-ordination with client & NDT sub ordinates
• Preparing daily inspection reports
• Interpretation of ISONIC (2005, 2010) PAUT/TOFD scan of different thickness
• Ensure that inspections/testing equipment at site are with valid Calibrations & working as per procedure
• VT of weld joints
• Inspection of Beveling and surface Defects identification & Rectification
• Abide by the safety rules & regulations
• Out of service Inspection of H2SO4 STROGE TANK
• During installation of the buried Line
• Instalation of Buried Pipe Line
• PAUT/MPI of Boiler Header at Rousch Power
• UFD, UTG of kiln
• Out-of-Service Inspection Of Storage Tank
• Inspection of Buried Pipe Line
• PAUT of Pipe Line at MOL
• Out of Service Inspection of GASOLINE STORGE TANK
• Inspection of Lifting Accessories and equipment's
• Instalation of Buried Pipe Line