- Experience at 235MW combined cycle power plant
- Gas turbine (Siemens V 94.2) 155MW and its auxiliaries
- Steam Turbine ABB (80MW) and its auxiliaries
- Dual Pressure, forced circulation HRSG made by CMI (280 Ton/Hr)
- Auxiliary Boiler 12ton/hr
- Black Start Diesel generator 2.0 MW
- Emergency Diesel Generator 400 KV
- Compressed Air System 250 m³/hr
- Demineralization system
- RO plant 20 m³/hr and 200 m³/hr
- Pumps Isolation and de-isolation
- Isolation of 132 KV Substation
- Plant Chemistry control
- Cooling water System
- All necessary Isolation of plant, Lockout/tag outs.