AutoCAD
Accomplished Manager Engineering with a proven track record, enhancing operational efficiency and energy management. Expert in HVAC systems and budgeting, I've successfully implemented cost-saving strategies and fostered team excellence through strategic planning and training. My leadership in engineering processes and innovation in energy efficiency stands out, driving significant improvements in both performance and MEP.
Operation and maintenance of HVAC, Power, Boiler, water supply, Laundry and Kitchen equipment and guest rooms.
HVAC equipment consists of Absorption chillers (880 RT), Gensets of 1.6 MW capacity, Direct fire Boiler of 3 Ton capacity, RO Plant of 03 ton capacity. Guest rooms are 140 in nos with 03 Banquets, 06 meeting rooms and two restaurants.
I have completed two operation and maintenance project with Iceberg Industries.
Emporium Mall and Hotels (2016 to 2018)
Operation and Maintenance of HVAC and Utility Plant serving at different areas i.e. Mall and Hotel, HVAC (5200 RT) equipment consists of 7 in Nos Compression Chillers (600 RT and 300 RT), 2 in Nos Absorption Chillers (842 RT each). Direct Fired Boiler 5 ton Capacity, AHUs and FCUs of different capacities.
Atlas Honda SKP (2019 to 2022)
Operation and Maintenance of HVAC and Utility Plant serving at different areas. HVAC (1632 RT) equipment consists of Absorption Chillers (832 RT, 450 RT and 350 RT). 4 in Nos Waste heat Recovery Boiler 1.5 ton Capacity, AHUs and FCUs of different capacities.
Scheduling and planning
Budgeting and estimating
Cost control
HVAC systems
Energy efficiency
AutoCAD
CFD
References available on request.