Summary
Overview
Work History
Education
Skills
Timeline
OfficeManager

Muhammad Zeeshan

Civil Engineer
MIDDLESBROUGH

Summary

Civil Engineer with around 4 years of experience equipped with Planning, Execution, QA/QC, Quantity Estimation & Project Management skills of different construction (Civil, Electrical & Mechanical) EPC Projects. Seeking an opportunity to join a dynamic and progressive organization which offers diversified opportunity in order to improve professional & technical skills and outshine career.

Overview

4
4
years of professional experience
8
8
years of post-secondary education
4
4
Languages

Work History

<p><b>Reon Energy Solutions</b></p> <p></p>

Quality Team Leader
09.2020 - 12.2021

Projects:

  • Bestway Cement 14.874 MW Solar Power Plant (Kalarkahar)
  • Bestway Cement 14.36 MW Solar Power Plant (Farooqia)
  • Amreli Steel 4.432 MW Solar Power Plant


Major Responsibilities:

  • Leading quality team for overall QA/QC involved on site.
  • Establishing ITP for quality team as per project scope.
  • Liaising with client for all on-site inspections.
  • Assuring mechanical & electrical material inspection delivered on site with respect to design/drawings.
  • Assuring all civil material to be tested prior to delivery on site (Aggregates, Steel, Blocks, Bricks etc)
  • Assuring all site activities are pre-inspected & done as per drawings/design.
  • Assisting site execution team with drawings evaluation & missing details.
  • Ensuring all structural defects generated during transportation are treated asap.
  • Generating all checklists related to civil, electrical & mechanical activities carried out on site.
  • Maintaining all inspection reports (MIRs, RFIs, Checklists, RCAs, NCRs etc)
  • Monitoring hold points for each activities are inspected on time.
  • Acknowledge, Intimate & warn project team for any process or design violation.
  • Conducting site audits as per quality protocols & PQI.

+ Edit or add your own

<p><b>Fortesol Ground Improvement Solutions</b></p>

Project Engineer
08.2020 - 09.2020

Projects:

  • 2.4 Million Tyres SLM TBR (2 Km Boundary Wall)


Major Responsibilities:

  • Liaison with client regarding drawings revisions & evaluations.
  • Conducted site surveys with client & revised sectional drawings accordingly.
  • Prepared project schedules on P6 & update them accordingly.
  • Prepared daily routine reports including DPRs, Project Delays etc.
  • Prepared BOQs, BBS, Cost Evaluation Report of project.
  • Monitored site activities including excavation, compaction, steel fixing, formwork binding etc.

+ Edit or add your own

<p><b>BST Services</b></p>

Planning/Project Engineer
12.2018 - 06.2020

Projects:

  • Bhit Compression Phase-IV (Bhit Gas Field)
  • Installation & Merging of Fence & Gates from Camp-01 to Camp-02 (Bhit Gas Field)
  • Solar Power for 24/7 Electrical Supply to Bhit Mountain Ufone Tower (Eni Bhit Gas Field)
  • Provision of Fire Water Ring Main in Project Camp. (Eni Bhit Gas Field)
  • Replacement of Train 1 & 2 Amine Unit CS Corroded Piping with SS Material (Eni Bhit Gas Field)

  • Bhit Field Power Optimization (Eni Bhit Gas Field)
  • Construction of Mini Warehouse Camp-IV (Eni Bhit Gas Field)
  • Enar Petroleum Refining Facility Revamp-II (Naya Nazimabad Refinery)
  • PARCO Coating Refurbishment KMK Pipeline- 4.5Km (Korangi Creek)


Major Responsibilities:

  • Work as an acting project manager on project manager's field break.
  • Prepare & Maintain project execution plan that's been submitted on project start.
  • Plan, Prepare & Submit man power deployment plan to client.
  • Estimation of overall project material to be procured locally & through headoffice.
  • Attending kick-off meetings with clients prior to start of project for risk assessment & other evaluation approvals.
  • Preparation of Work Measurement Sheets & their supporting docs & getting them verified from client representative.
  • Preparation of monthly invoices as per BOQ quoted rates & activities executed on site.
  • Preparation of QA/QC documentation to be submitted with dossier at project completion phase.
  • Approval of Inspection Requests from consultant regarding activities performed already.
  • Preparing & maintaining daily progress reports & their comparison w.r.t baseline schedule to be submitted to client.
  • Evaluating site requirements & their procurement from Karachi to avoid delays.
  • Liaison with client for any changes or non availability of information in drawings.
  • Preparation of time sheets w.r.t all work force & equipment working on site.
  • Coordination with head office for project procurement & their timely deliveries.
  • Looking after overall site HSE procedures & implementation to avoid any major accident.
  • Keeping record of site expenses from company petty cash.
  • Preparation of Bar Bending Schedule of different refinery structures.
  • Evaluation of BOQ items & their procurement as per mentioned specification in BOQ.
  • Meeting timelines of site executions for on time handing over of project w.r.t baseline schedule.
  • Timely handing over of different site locations to other firms working on the project.
  • Supervision of safe execution of site activities including locating pipeline, excavation just above pipeline, sandblasting etc.
  • Obtaining different site related permissions from government authorities for the execution of the project.

<p><b>AIKES Private Limited</b></p> <p></p>

PMO & Site Engineer
01.2018 - 11.2018

Projects:

  • JS Petroleum LPG Storage Facility
  • Rajby Effluent Treatment Plant


Major Responsibilities:

  • Supervised 16 acre plot back filling as a senior site engineer.
  • Managed all site activities from procuring lubricant for heavy machinery to all engineering aspects.
  • Preparing Field Density Reports & dossiers to be submitted to client for IPCs.
  • Performed site surveying on daily basis to check plot level w.r.t BM.
  • Evaluation of Bill of Quantities, preparing them with local rates & attending pre-bid meetings.
  • Prepared MS Project & Primavera P6 schedules for different on going projects.
  • Accumulation of Daily Progress Reports from multiple sites & updating their respective schedules.
  • Coordinating with clients for site visits & approvals regarding Interim Payment Certificates.
  • Taking out different structural & finishing quantities.
  • Preparation of Bar Bending Schedules of different site structures.
  • Dealing with projects procurement to avoid delays.




<p><b>Paragon Constructors Private Limited</b></p>

Internee Engineer
05.2016 - 06.2016

Project:

  • Bahria Town Apartments, Karachi.


Major Responsibilities:

  • Monitored finishing activities of G+7 BTK Apartments.
  • Supervised plaster, masonry, flooring & multiple structural activities.
  • Evaluated different flaws in finishing work.

Education

Master of Science - Civil & Structural Engineering

Teesside University
Middlesbrough, UK
01.2022 - Current

undefined

NED University of Engineering & Technology.
01.2014 - 11.2017

undefined

Govt. Degree College Malir Cantt, Karachi.
05.2011 - 05.2013

undefined

White House English School
04.2009 - 04.2011

Skills

Microsoft Project

undefined

Timeline

Master of Science - Civil & Structural Engineering

Teesside University
01.2022 - Current

Reon Energy Solutions

Quality Team Leader
09.2020 - 12.2021

Fortesol Ground Improvement Solutions

Project Engineer
08.2020 - 09.2020

BST Services

Planning/Project Engineer
12.2018 - 06.2020

AIKES Private Limited

PMO & Site Engineer
01.2018 - 11.2018

Paragon Constructors Private Limited

Internee Engineer
05.2016 - 06.2016

undefined

NED University of Engineering & Technology.
01.2014 - 11.2017

undefined

Govt. Degree College Malir Cantt, Karachi.
05.2011 - 05.2013

undefined

White House English School
04.2009 - 04.2011
Muhammad ZeeshanCivil Engineer