MUHAMMAD USMAN

MUHAMMAD USMAN

Mechanical Engineer, Project, Program, Portfolio and Construction Management Professional.
Karachi

Summary

With over 15 years of dedicated experience in oil and gas Projects and Construction, I have amassed comprehensive knowledge and skills vital for successful project management, execution, and completion within the oil and gas industry. Throughout my career, I have consistently demonstrated proficiency in overseeing complex projects in both Qatar and Pakistan, ensuring strict adherence to HSE, Procedures, Optimizing Timeline and Cost. My unwavering commitment to excellence, coupled with strong leadership abilities, has enabled me to effectively navigate challenges and contribute significantly to the success of numerous projects.

Overview

16
16
years of professional experience
5
5
years of post-secondary education

Work History

Project Manager

United Energy Pakistan Limited
06.2016 - Current
  • Manage the oil and gas project portfolio, overseeing planning, execution, and performance to ensure alignment with strategic goals and compliance
  • Prioritize projects based on resources, risks, and returns while coordinating with teams and communicating progress to stakeholders
  • Prepare the department's Long-Term Plan (LTP) and collaborate with stakeholders to secure CAPEX approval
  • Responsible to carry out the EPC Projects along with the financial closeout
  • Adhere to and implement Project Management Procedures, including the sequential project stages of Appraise, Select, Define, Execute, and Operate
  • Prepare and takes management endorsement on the Approval for Expenditure (AFE) according to the assigned DOFA
  • Understand the departmental and organizational KPIs and align the personal KPI with the organizational goals
  • Prepare and float bid packages with RFQ through procurement team
  • Conduct Pre-bid meeting, Review and evaluate the techno-commercial bids
  • Effectively negotiate with contractors to streamline project timelines and ensure pricing are aligned with benchmarks or with in planned budget
  • Review BOMs, identify short material alternatives from redundant, slow moving and surplus inventories to minimize the procurement cost and time
  • Manage procurement of material, and facilitate the delivery of materials, and equipment to ensure efficient construction site operations
  • Initiate Engineering of the project, participate and provide feedback in EDR (Engineering Design Review) and HAZOP (Hazard and Operability study)
  • Participated in FEED (Front End Engineering and Design), provided valuable inputs
  • Follow up Engineering deliverables as per the approved targets
  • Also review Engineering packages and carry out the inter disciplinary check (IDC)
  • Identify risk using SWOT analysis, Delphi and Brainstorming techniques and execute strategies for addressing these risks
  • Prepare the Risk register of EPC projects, including pre and post controls, risk ranking
  • Mitigate or reduce the risk by placing the possible controls
  • Development and take consent of the Business case of the project from UEP and UEG (China) management
  • Coordinates and finalize the scope of work and conceptual of the projects by taking consent from the stakeholders both OPEX and CAPEX Projects
  • Negotiate and obtain approvals from landowners and government authorities, ensuring regulatory compliance before commencing construction
  • Share project performance reports including status of design, procurement, construction, CPI and SPI, payments with higher management
  • Ensure the Project Close out is signed off with all stakeholders, along with the financial closure
  • Support team to carry out the economics of the project through calculating of IRR (Internal Rate of Return) and NPV (Net Present Value)
  • Prepare and take required approval of Project's cost, schedule, project management plan from UEP and Joint venture partners
  • Prepare and control project costs by monitoring actual, committed, and forecasted expenditures
  • Use CPM and PERT to identify the project's critical path, estimate mean duration and variances, and calculate Z-score to estimate completion timeline
  • Carryout Fast tracking and Crashing techniques to optimize the project timeline
  • Utilized Earned value management to calculate the schedule, cost variances
  • Analyze, initiate, process, and monitor the change management process within projects
  • Perform Time Impact Analysis to reassess schedules and costs, evaluate the potential risk of budget and timeline deviations
  • Determine the further course of actions to mitigate the risk at minimum level
  • Lead and manage the Project and Construction Management team, including Site Manager, Planning Engineer, Project and construction Engineers, and supervisors of third-party consultants, and contractors
  • Lead project kick-off meetings with construction team and visit construction sites
  • Also resolve constructional / contractual issues, including changes to the 'Scope of Work' in a manner that there is minimum disruption in the construction work
  • Review daily, weekly and monthly reports on project's progress
  • Lead meetings with stakeholders for the update and resolve potential challenges
  • Collaborate closely with contractors, and other stakeholders to ensure that construction works at Site are being conducted in a safe manner, along with a good coordination among the teams following the timeline, control costs and maintain compliance with quality standards
  • As a contract sponsor, carryout contractor's 4-P (People, Plant, Process and Performance) Audits to ensure the HSE compliance of contractors
  • Ensure UEP HSE policy, national & international applicable codes, standards, and procedures are strictly adhered to during project life cycle
  • Lead and manage mechanical completion, pre-commissioning, Pre startup safety Review (PSSR), Commissioning and Project Handover to Operations
  • Ensured projects are designed & constructed as per company's expectation and no unsafe activity takes place during project execution
  • Prepared lesson learn document for the respective project in true spirit and learning is captured to address in future projects
  • Have good knowledge to utilize relevant engineering standards, international codes, related to projects
  • Coordinate departmental QPR (quarterly performance review) with the management
  • Utilize new technologies, Generative artificial intelligence (AI) in Project management, for continuous improvement in the projects
  • Assess contractor performance against predefined objectives and analyze outcomes for lessons learn and areas of improvement
  • Lead inventory optimization efforts by redesigning Min-Max inventory levels and developing the annual material demand plan
  • Carries out cost and time Benchmarking of the standard projects
  • Align personal and departmental KPIs with organizational goals, driving performance improvements and accountability
  • Lead and mentor project teams, fostering a collaborative environment and enhancing team performance through coaching and support
  • Establish and track performance metrics, utilizing KPIs to assess project and team effectiveness and drive continuous improvement
  • Naimat West High CO2 Compression EPC Project
  • Highlights are as follow, Project Cost: 5.6 million USD, Area buildup, Relocation of 3 x HP Compressors, Manhours 75,000, Steel Structure 200 Ton, Equipment 500 Ton, Piping: 25,000 Dia inches, Flowline 6" x 10KMs
  • 100 MMCFD, Naimat Phase-5 Facility Upgrade EPC Project, completed in 2017
  • Highlights are as follow, Project Cost: 75 million USD, Manhours 1 million, Steel Structure 1500 Ton, Equipment 1400 Ton, Piping: 150,000 Dia inches
  • Managed the procurement / relocation and installation of various LP and HP Compressors
  • Timely completion of wellhead setups
  • Manage and completed various Pipeline projects
  • Lead multiple Facility shutdown planning and execution
  • Decommissioning of Pipelines after P&A (Plug and Abandon)
  • Completion of Buzdar and Mazari Unmanning Projects
  • Completion NRA (Non-Reserve Adding) Projects, which includes efficiency improvement and Risk Reduction Projects
  • Procurement / Relocation and Installation of Jet pumps, PD pumps, Gas lift setups
  • Procurement and installation of LPG Heat Exchangers and Bullets

Senior Construction Engineer - Mechanical

United Energy Pakistan Limited
09.2013 - 06.2016
  • Carryout kick off meetings with the contractors, lead and control the mechanical construction work and resolve technical issues related to construction
  • Lead constructability review of the engineering drawings for upcoming projects
  • Participated in HAZOP (Hazard and Operability Study) and FEED (Front end Engineering and Design) of multiple projects
  • Lead and manage the construction works for the of LP and HP reciprocation compressors, Jet Pumps, PD Pumps and Gas lifts Projects
  • Laying of Flowlines / Pipelines and installation of Wellhead Setup along with the completion of Facility end works
  • Lead and managed Facility TAR (Turn Arounds)
  • Have working experience to handle the construction works both Greenfield and Brownfield
  • Experience in scheduling, monitoring, and controlling by utilizing MS-Project
  • Implement the schedule compression techniques by fast tracking or crashing the activities
  • Optimize the material issues by utilizing redundant and surplus material available in warehouses
  • Plan, execute and control the shutdown activities related to the projects
  • Carryout the material reconciliation, as built, closure of works orders and verification of bills, after completion of construction works
  • 40 MMCFD, Naimat Phase-4 Facility Upgrade Project, completed in 2015
  • Highlights are as follow, Project Cost: 45 million USD, Manhours 650,000, Steel Structure 900 Ton, Equipment 800 Ton, Piping: 100,000 Dia inches
  • Laid ~ 400 kms multiple Pipelines from 4" to 16" dia
  • Executed the fabrication and installation of wellhead setup and ensured the well is timely put on production (POP)
  • Successful installation of Wellhead Remote Monitoring System, Natural draft wellhead coolers
  • On Site fabrication and installation of Slug Catchers of 36" x 700 ft in length
  • Lead and manage the construction works for Kausar Facility Annual Turn Around (TAR)
  • Naimat Flare Phase-1, installation of 120 ft high Naimat Flare and its associated piping network
  • Swift installation of ETF (Early testing Facility) setup
  • Carryout the rigging study and lifting plan of equipment or any other critical lifting
  • Shut down works: Tie In, Removal & Replacement of corroded sections of piping & pipelines
  • Successful completion of water upgradation, water flooding and Unmanning projects

Senior Construction Engineer

Descon Engineering Qatar
11.2012 - 09.2013
  • Company Overview: Project: Barzan Onshore Project Ras Gas
  • After exceptional performance in PMP, I have been promoted and appointed as Senior Mechanical Engineer in Barzan On shore project
  • The highlight of this large-scale project is as follow
  • Responsible for mechanical construction and assured the work is done in accordance with the AFC package, ASME specifications and standards
  • Ensured the team has sufficient resources, material, and work front to complete the job and targets
  • Ensured the construction works are being carried out following HSE, quality of work, procedures, and standards
  • Carryout the safe lifting of equipment after reviewing rigging studies and lifting plan in the brownfield and greenfield areas
  • Optimized the fabrication process by implementation of latest fabrication tools and equipment to meet the target
  • Designed spool yard and lay down areas, Implemented Bar-Code system to trace out the spools movement
  • Project: Barzan Onshore Project Ras Gas
  • Project Cost: 151 million USD, Manhours 9.7 million, Steel Structure 5300 Ton, Equipment 1500 Ton, Piping: 600,000 Dia inches
  • In this Project I took lead as Area In-charge for piping and successfully completed and handover the assigned area to the operations

Mechanical Engineer

Descon Engineering Qatar
11.2011 - 11.2012
  • Company Overview: Project: Plateau Maintenance Project (PMP) Qatar Gas
  • Appointed as a mechanical engineer for PMP project
  • The highlight of this large-scale project is as follow
  • I have led and manage the piping fabrication including 2" to 64"dia SS / CS and Jacketed piping
  • Moreover, also carried out the execution works in the brownfield of Qatar Gas Processing Facility along with the experience of planning and the execution of shutdowns
  • Project: Plateau Maintenance Project (PMP) Qatar Gas
  • Project Cost: 75 million USD, Manhours 5.6 million, Steel Structure 7600 Ton, Equipment 7500 Ton, Piping: 750,000 Dia inches
  • Being Piping in-charge, successfully accomplished the piping fabrication targets
  • The piping includes the SS, Duplex, CS and Jacketed Piping
  • The overall achieved Dia inches were ~ 50,000
  • Timely completion of compressor unit in the brownfield of Qatar Energy Facility
  • Also completed piping erection works in greenfield zone
  • Conduct daily progress meeting, update them regarding the progress, on site issues along with the best available solutions

Trainee and Executive Engineer

Siemens Pakistan Private Limited
01.2009 - 11.2011
  • I have completed my one-year training and appointed in the company as Executive Engineer
  • Worked in construction department of multiple project sites, where I was responsible for the fabrication and erection of piping and steel structure
  • Moreover, I have led the team of supervisors, resolved day to day technical and material availability issues, along with the consolidation of daily progress reports
  • Eni Pakistan - Bhit Gas Compression Projects
  • OMV Pakistan / ABB S.p.A Italy - Sawan Gas Field Compression Project
  • Bhp Billiton Pakistan - Wellhead setup fabrication and installation project

Education

Masters In Project Management - Project Management

Bahria University Islamabad
Karachi
02.2020 - 05.2021

Bachelor Of Engineering - Mechanical

NED University of Engineering & Technology
Pakistan
01.2005 - 05.2008

Skills

Portfolio Management

Highlightedprojectsandawards

United Energy Pakistan Limited (UEP), www.uep.com.pk, Facility Upgrade EPC Project, Naimat West High CO2 Compression and Flowline Project, Conversion of conventional compression to Modular Compression, 100 MMCFD, Naimat Phase-5 Facility Upgrade Project, 40 MMSCFD, Naimat Phase-4 Facility Upgrade Project, Installation of LPG heat exchangers, On Site fabrication and installation of Slug Catchers of 36" x 700 ft in length, Naimat Facility Flare Project, Procurement / Relocation and installation of Wellhead coolers and Separators, Facility Unmanning and Optimization Projects, Descon Engineering Qatar, www.descon.com/en/, Qatar Gas - Plateau Maintenance Project (PMP), Ras Gas - Barzan Onshore Project, Siemens Pakistan Limited, www.siemens.com/pk, Eni Pakistan - Bhit Gas Field Compression Projects, OMV Pakistan - Sawan Gas Field Compression Project, Bhp Billiton Pakistan - Zamzama wellhead setup fabrication and installation project, Employee of the month award - Descon Engineering, 2012, Appreciation award to complete compressor unit - Descon Engineering, 2013, Cost Saving and Efficiency Enhancement Award - UEG (China), Various Spot Recognition Awards for the successful completion of multiple Projects - UEP

Coursestrainingskillscertifications

  • Intelligent Automation in Project Management
  • International Gas Business Workshop
  • The Leadership Essentials - A.I Mir Karachi
  • Gender sensitivity with Diversity, Equity and Inclusion
  • Strategic Alignment
  • Onshore pipeline engineering: ASME B31.3 and B31.8 - Haward Technology Middle East, Karachi
  • Continuous Improvement
  • Energy Project Economics and Risk Analysis - Online training by IHRDC e-learning solutions
  • Oil Field Safety - Online training by IHRDC e-learning solutions
  • Surface Facility Production Operations - Next A Schlumberger Company, Karachi
  • Stakeholder Management (Internal, External including Government Authorities)
  • Strong Presentation Skills
  • Leading Teams - Online training by IHRDC e-learning solutions
  • Microsoft Project Professional inhouse training by UEP
  • Primavera Planner
  • SAP Fiori Training, inhouse training by UEP
  • Hazard Identification Training
  • Permit to Work Training by Qatar Gas
  • 10 LSR (Life Saving Rules) training by Qatar Gas, 8 Golden safety Rules by UEP
  • Pulse safety training by TCJV
  • Heat Stress training by TCJV
  • Work at height training by JGC
  • Safety Observation Card training by JGC
  • Safety Training & Observation Program STOP training by Du Pont from Eni Pakistan Ltd.
  • H2S Safety Training by Rutledge H2S from Schlumberger
  • First Aid Training by URS from SIEMENS Pakistan Engg. Co. Ltd. And United Energy Pakistan Ltd.
  • Firefighting Training by URS from SIEMENS Pakistan Engg. Co. Ltd.
  • Member of Pakistan Engineering Council
  • Student member of ASME (American Society of Mechanical Engineers)
  • Golden Safety Rule 8 of UEP
  • Control of work
  • Safe card and Safety observation and communication training
  • Conduction of Work Site Audits
  • Effective Communication Training
  • Introduction to Safety & Management Training By OSHA
  • Defensive Driving Certified

Timeline

Masters In Project Management - Project Management

Bahria University Islamabad
02.2020 - 05.2021

Project Manager

United Energy Pakistan Limited
06.2016 - Current

Senior Construction Engineer - Mechanical

United Energy Pakistan Limited
09.2013 - 06.2016

Senior Construction Engineer

Descon Engineering Qatar
11.2012 - 09.2013

Mechanical Engineer

Descon Engineering Qatar
11.2011 - 11.2012

Trainee and Executive Engineer

Siemens Pakistan Private Limited
01.2009 - 11.2011

Bachelor Of Engineering - Mechanical

NED University of Engineering & Technology
01.2005 - 05.2008
MUHAMMAD USMANMechanical Engineer, Project, Program, Portfolio and Construction Management Professional.