Summary
Overview
Work History
Education
Skills
Certification
Additionalprojects
Books Reading, Playing cricket.
Timeline
Generic
Muhammad Tanzeel

Muhammad Tanzeel

Power Plant And Utilities Professional
Muridke

Summary

Experienced power plant and Utilities professional with 13+ years of expertise in operations, commissioning, and maintenance of high-pressure coal-fired boilers and steam turbines. Skilled in optimizing processes, ensuring compliance, and leading teams to achieve operational excellence. Seeking a dynamic role in the utilities industry to leverage skills for mutual growth.

Overview

16
16
years of professional experience
2
2
years of post-secondary education
7
7
Certifications
2
2
Languages

Work History

Deputy Manager, Shift Operations.

TEL and T.N.P.T.L HUBCO
Mithi, Sindh
06.2024 - Current
  • Plant Operations Oversee shift operations of a 330 MW coal-fired thermal power plant, including 1100 TPH CFB Boiler and 330 MW GE Steam Turbine.
    Manage auxiliary systems: water treatment units, HV/LV transformers, 500 KV GIS, and coal handling systems.
    Ensure compliance with Plant Operations Chemistry, OEM guidelines, and Preservation regimes.
    HSE and Incident Management100% compliance with the Injury Prevention Plan (IPP), including actionable item closures and report development.
    Conduct incident investigations and provide quality feedback for comprehensive reports.
    Ensure monthly audits, Job Cycle Check Plans, and adherence to Process Safety Management (PSM) recommendations and audits.
    Chemical and Lab Operations Implement chemical dosing regimes, monitor plant chemistry, and maintain daily logs.
    Ensure timely calibration of lab equipment and manage inventory of process chemicals and reagents.
    Develop and implement lab procedures and commission new labs according to planned timelines.
  • Training and Development Conduct training on critical topics like cooling water and steam chemistry.
    Ensure 100% participation in mandatory and internal training as per the Annual Training Plan.
    Implement awareness programs for PSM procedures and emergency preparedness.
  • Reporting and Optimization Develop and maintain records for chemical consumption and bulk materials.
    Participate in plant preservation schemes and monitor efficiency-related issues in daily coordination meetings.
    Initiate plant improvement projects for chemical optimization and achieve successful ADC test compliance.
  • Improved team efficiency by streamlining processes and implementing innovative management strategies.
  • Identified areas for improvement within the department, implementing strategic initiatives to address gaps in performance or resources.
  • Collaborated with cross-functional teams to drive business growth and achieve corporate objectives.
  • Increased customer satisfaction levels by developing targeted strategies to address client concerns effectively.
  • Created and maintained a strong team culture that promoted high levels of collaboration, employee satisfaction, and overall performance.
  • Mentored junior staff members on best practices for project management and team collaboration skills, fostering a supportive work environment.
  • Developed strong relationships with stakeholders to facilitate smooth communication and project completion.
  • Enhanced employee performance by providing regular feedback, coaching, and training opportunities.
  • Liaised with team members, stakeholders and vendors to coordinate activities, provisioning, environment setup, risk mitigation and follow-up.
  • Interviewed, performed background checks, hired, and trained 05 of associates in 2024.
  • Offered hands-on assistance to customers, assessing needs, and maintaining current knowledge of consumer preferences.
  • Generated repeat business through exceptional customer service.
  • Supervised day-to-day operations to meet performance, quality and service expectations.
  • Monitored cash intake and deposit records, increasing accuracy, and reducing discrepancies.
  • Completed regular inventory counts to verify stock levels, address discrepancies, and forecast future needs.
  • Conducted performance evaluations and provided constructive feedback to employees.
  • Defined clear targets and objectives and communicated to other team members.
  • Evaluated employee performance and conveyed constructive feedback to improve skills.
  • Maintained positive customer relations by addressing problems head-on and implementing successful corrective actions.
  • Established team priorities, maintained schedules and monitored performance.

Assistant Manager, Power House

LCI Polyester
08.2019 - 05.2024
  • Re-commissioned 2 x CFBC Boilers (50 Bar steam, 50 TPH each).
  • Part of the commissioning team for 1 x HTC steam turbine (Condensing).
  • Re-commissioned and ensured smooth operation of PRDS (MPS, LPS).
  • Re-commissioned Cooling Tower (2000 m³/h, Open/Closed Loop) and Ash de-dusting (Bag House) with pneumatic conveying systems.
  • Re-commissioned RO plant with EDI Polisher (50 + 100 m³/h), Air Compressors, and Dryers.
  • Re-commissioned CAS handling systems and DCS (Siemens) for CFBC Boilers.
  • Monitored and controlled plant equipment via DCS/SCADA for stable operations.
  • Conducted inspections and troubleshooting to ensure uninterrupted performance.
  • Enforced HSE protocols, including PTW systems, hazard assessments, and emergency drills.
  • Ensured adherence to environmental and safety standards.
  • Recorded operational data and analyzed trends to optimize performance.
  • Prepared shift reports and documented incidents.
  • Collaborated with maintenance, electrical, and other departments for seamless operations.
  • Trained staff on safety procedures and technical protocols.
  • Monitored emissions, effluents, and waste disposal for environmental compliance.
  • Identified hazards and implemented risk mitigation strategies.
  • Established performance goals for employees and provided feedback on methods for reaching those milestones.
  • Supervised day-to-day operations to meet performance, quality and service expectations.
  • Improved customer satisfaction by addressing and resolving complaints promptly.
  • Developed strong working relationships with staff, fostering a positive work environment.
  • Promoted teamwork within the workplace by encouraging collaboration among staff members on various project tasks.
  • Collaborated with the management team to develop strategic plans for business growth and improvement.
  • Maintained a clean, safe, and organized store environment to enhance the customer experience.
  • Mentored junior staff members in their professional development by offering guidance/support in their assigned roles.

Shift Engineer

FFBL Power Company (FPCL)
Karachi, Sindh
01.2016 - 08.2019
  • Key role in the operation of Boilers and Utilities, coordinating with FFBL and K-Electric for power and steam management.
  • Monitoring and Control: Operated DCS/SCADA to monitor boiler, turbine, and generator performance; ensured uninterrupted fuel supply and effective ash handling.
    Operation and Coordination: Performed start-up/shutdown inspections, optimized load management, and synchronized generators with the grid.
    Maintenance and Troubleshooting: Conducted routine equipment inspections, addressed failures, and escalated critical issues to the maintenance team.
    Safety and Compliance: Enforced HSE protocols, monitored emissions, and ensured fire and safety system readiness.
    Record-Keeping: Maintained logbooks, analyzed KPIs, and prepared shift handovers.
    Auxiliary Systems Management: Monitored cooling, feedwater, and electrical systems for continuous operation.
    Training and Emergency Preparedness: Participated in training, cross-training, and mock drills to manage emergencies effectively.
  • Implemented PTW and LOTO to ensure safe job execution.
  • Ensured adherence to Safe Operating Procedures for startup, shutdown, and emergency handling.
  • Lead commissioning of 2 x CFBC Boilers (92 Bar steam, 250 TPH each) and 4 x GE steam turbines (3 Condensing, 1 Back Pressure).
  • Commissioned MCP (Master Control Panel) for steam network (HPS, MPS, LPS), Cooling Tower (18,000 m³/h), Ash de-dusting, Air Compressors, and CAS handling systems.
  • Managed one of the largest automatic coal storage yards (60,000 MT) in Pakistan.
  • Involved in commissioning activities for DCS (ABB) and CEMS (YOKOGAWA).
  • Enforced HSE protocols, conducted safety audits, risk assessments, and safety drills.
  • Ensured compliance with environmental regulations, including emissions, effluent, and waste management.
  • Implemented emergency response procedures and hazard reporting systems.
  • Managed shift operations, ensuring continuous performance and smooth shift transitions.
  • Supervised shift teams, assigned tasks, and ensured efficient, safe operations.
  • Facilitated shift handovers and resolved operational challenges to minimize downtime.

Shift Engineer

ICI Soda Ash
Jhelum, Punjab
01.2013 - 01.2016
  • 18 MW Coal-Based Power Plant:Commissioned 2 x Circulating Fluidize Bed Boilers (70 Bar steam, 80 Tons per Hour each).
    Part of commissioning team for 1 x HTC steam turbine (Condensing).
    Managed commissioning of PRDS for steam distribution (MPS, LPS).
    Oversaw commissioning of a Cooling Tower (3000 m³/h, Open/Closed Loop).
    Commissioned Ash de-dusting (Bag House) and pneumatic conveying system.
    Managed commissioning of RO plant with EDI Polisher (50 + 120 m³/h).
    Handled commissioning of Air Compressors and Dryers.
    Led commissioning of CAS (Coal, Ash, and Sorbent) handling systems.
    Involved in DCS (Siemens) commissioning for CFBC Boilers.
  • 3.2 MW Coal-Based Power Plant:Commissioned 2 x CFBC Boilers (34 Bar steam, 45 TPH each).
    Part of the commissioning team for 1 x Qingdao steam turbine (Condensing).
    Commissioned FGD plant, Cooling Tower (400 m³/h, Open Loop), Ash de-dusting system, Air Compressors, and Dryers.
    Led commissioning of CAS handling systems.
    Involved in DCS (Winmation) commissioning for CFBC Boilers.

Principal Officer, Coal Fired Plant 3/5/12 MW

Olympia Chemicals
Khushab, Punjab
04.2009 - 01.2013
  • Managed the operation of 4 x Coal Fired Boilers (2 x B.F.B.C, 2 x C.F.B.C) and 3 x Steam Turbines (Back Pressure).
  • Commissioned 1 x H.T.C steam turbine (10 MW, Back Pressure) and 1 x C.F.B.C Boiler (52 Bar, 75 T.P.H).
  • Oversaw the commissioning of Ash de-dusting (ESP), pneumatic conveying systems, and (Coal, Ash, Sorbet) handling systems.
  • Participated in D.C.S (Sup-con) commissioning for C.F.B.C Boilers.
  • Ensured compliance with HSE protocols, maintaining a safe work environment and minimizing environmental impacts.
  • Conducted safety drills, inspections, and risk assessments to meet regulatory standards.
  • Promoted a safety-first culture and managed environmental monitoring to ensure compliance with emissions and waste standards.
  • Supervised shift staff, ensuring efficient and safe plant operation.
  • Prioritized and assigned tasks based on urgency, ensuring smooth and timely completion.
  • Managed shift handovers and resolved operational issues to minimize downtime and maintain continuous performance.

Education

Master of Science - Coal Technology.

The Punjab University
Lahore
09.2006 - 08.2008

1st Class Boiler Certification (Continue) -

Punjab Board of Boiler Engineers
Lahore, PB
09.2024 - Current

Skills

Commissioning

undefined

Certification

Advanced Course on CFBC Coal-Fired Power Plant Operations, Yantai Hua Lu Institute (China)

Additionalprojects

  • Executed in-house projects, including new air compressor tie-ins and HFO tank displacement.
  • Led civil and mechanical work execution for R-PET plant development.
  • Developed training modules based on TNA and managed section budgeting.

Books Reading, Playing cricket.

I have a strong interest in reading self-help and autobiographical books, as they provide valuable insights and inspiration for personal growth and development. I enjoy exploring the life stories of others, learning from their experiences, and applying these lessons to improve my own life. In addition to reading, I also have a passion for playing tape ball cricket at the domestic level, which allows me to stay active, connect with others, and enjoy friendly competition in a relaxed and social environment.

Timeline

1st Class Boiler Certification (Continue) -

Punjab Board of Boiler Engineers
09.2024 - Current

Deputy Manager, Shift Operations.

TEL and T.N.P.T.L HUBCO
06.2024 - Current

Assistant Manager, Power House

LCI Polyester
08.2019 - 05.2024

Shift Engineer

FFBL Power Company (FPCL)
01.2016 - 08.2019

Shift Engineer

ICI Soda Ash
01.2013 - 01.2016

Principal Officer, Coal Fired Plant 3/5/12 MW

Olympia Chemicals
04.2009 - 01.2013

Master of Science - Coal Technology.

The Punjab University
09.2006 - 08.2008
Advanced Course on CFBC Coal-Fired Power Plant Operations, Yantai Hua Lu Institute (China)
Boiler Maintenance and Safety Workshop, NPO Pakistan
In-house Training on Safety and Firefighting
Second Class Boiler Competency Certificate
Basic Engineering Concepts Training
RCMS (Responsive Care Management System) Certification
Problem-Solving and Decision-Making Workshop
Muhammad TanzeelPower Plant And Utilities Professional