Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Publications (In OnePetro)
Personal Information
Timeline
Generic

MUHAMMAD SHAHRUKH

Karachi

Summary

A highly accomplished Senior Completion & Work-Over Well Operations with +/- 10 years of diversified experience of planning and execution both in Completion & Work-Over Intervention jobs. Exceptional technical acumen and communication abilities coupled with a wider skill set and looking forward to re-establish a career in a progressive organization which requires engineering expertise.

Overview

10
10
years of professional experience
1
1
Certification

Work History

Senior Completions & Work Over Engineer

United Energy Pakistan
04.2019 - Current

Completion & Work Over Operations:

  • Prepare Completion & Work Over Job programs and work closely with all stakeholders involved in job design and execution.
  • Prepare AFEs & Cost Estimates for completion & work-over job programs.
  • Provide inputs for operational challenges & way-forward during completion & work over operations to rig site teams.
  • Conducts technical evaluation of completion equipment ordering and co-ordinates with PSCM and concerned stake holder in timely ordering of completion equipment for completion operations.
  • Participates in Scope of Work exercise and co-ordinate with PSCM for contract tendering and other approvals for timely contracts setup for completion & work over services.
  • Maintain close liaison with service company personnel's for smooth operations during job execution.
  • Review contractor services invoices as per contract T&Cs.
  • Implement new ideas & technology to achieve required performance standard.
  • Prepare monthly, quarterly and annual performance reports and slide pack for completion & work over operations key highlights to company' management.
  • Prepare End of Well Report (EOWR), After Action Review (AAR) reports to review completion & work over job performance and capture lesson learned (if any).
  • Ensure all documents for completion & work over operations are properly filled in well file, stored and available in shared or digital drives etc.

Field Completion & Work Over Engineer

United Energy Pakistan
04.2014 - 04.2019

Field Completion & Work Over Engineer:


Supervise Completions & Work-Over Jobs:

Supervise different types of open hole and cased hole completions/workovers and setting of different types of permanent and retrievable packers with wireline, tubing and hydraulic setting tools for different types of conventional, gas-lift assisted and jet pump completions. Have experience of performing space-out calculations and landing and engagement of tubing hangers, preparation of completion and perforation gun tallies and supervising TCP perforation jobs, CBL-VDL logging, open hole and MDT logging etc.


Supervise Liner Hanger Jobs:

Supervise Liner hanger running jobs, tie-back liner jobs, setting of both hydraulic and mechanical set Liner hangers and cementing of liners.


Supervise Non-Routine Jobs: Supervise non routine jobs such as Coring, Stuck pipe, Open hole/Cased hole sidetracks, Fishing operations, Remedial cementing jobs etc.


Supervise Wireline Logging, Perforation, Fishing and TLC Jobs: Supervise wireline logging, TLC and perforation jobs. Also have experience of fishing while logging operations using the wire line cut and thread and reverse cut and thread method.


Hands-on Experience of Halliburton Landmark Software Suite : Have hands-on experience of working with Halliburton Landmark Software Suite including ‘Open Wells’ for daily operations report


Inscription of Post Well Reports: Preparing daily reports on ‘Open Wells’ EDM as well as preparing End of Well Reports (EOWR), Well Handover documents, After Action Reviews (AAR), Days vs Depth graph and maintaining AFE cost report’s & sub-contractor evaluations pertaining to the ongoing rig operations, DPR and CPR Reports for Rushmore, Technical Time Limit Sheets for Flat Time Analysis etc and Well Planner sheets etc.


Assistance in Preparation of Well Programs/ AFE Reports: Assist in preparation of Drilling, Completion/Work-over programs, Authorization for Expenditures (AFE) including all information specified in company procedure by applying engineering best practices.


Logistics Management for Smooth Completion & Work-over Operations: Planning delivery time tables, inventory management, equipment mobilization and logistics management to carry out smooth drilling operations.


Implementation of HSE Procedures & Policies: Implemented HSE procedures and policies at the Well Site. Compliance of environmental protection standards. Conducting Hazard Hunts, Pre Job Safety Meetings, Tool Box Talks and Safety Stand Downs.

Education

Bachelor of Science - Petroleum Engineering

NED University of Engineering & Technology
Karachi, Sindh, Pakistan
12.2013

Skills

  • SAP
  • Maximo
  • EDM Open Wells
  • Well Cat
  • Microsoft Applications (Power Point Excel, Word etc)

Accomplishments

  • Received Spot Recognition Award (SRA) outstanding efforts successful Perks/ Well line up job in an effective way at Umar-7.


  • Received Spot Recognition Award (SRA) from HOSS for successful execution of Perforation job at exploratory well of Korai-01 which flowed at the rates of over 30 MMSCFD.


  • Achieved 2nd position in Petroleum Engineering Batch (2009-10) of NED University of Engineering and Technology, Karachi with 92.71% (4.0 CGPA) marks.


  • Participated among the top 75-100 students from around the globe in International Petroleum Technology Conference (IPTC) Education Week which was held in Beijing, China in 2013.


  • Awarded SPE Star Scholarship 2012 from the whole Middle East Region.


  • Awarded Merit Scholarship by NED University for achieving 2nd position in the Petroleum Engineering Department in 2010 and 2011.


  • Awarded a four year scholarship by Shell Pakistan Ltd. for graduation in University.

Certification

  • IWCF Well Intervention Pressure Control Programme (Expiry - Oct 2024)
  • “Advanced Completion Design and Operations” by Harward Technology Middle East. (Credential ID 3650-7304-8510-1546)
  • “Enhanced Well Intervention” by NEXT Well Corp.
  • “Cased Hole Logging” by NEXT. (Serial No. 65996-164537-277799)
  • “Completion Equipment” by IHRDC. (License No. 655425)
  • “Basic Completion Design and Practices” by IHRDC. (License No. 654428)
  • “Wellheads, Flow Control Equipment and Flowlines” by IHRDC. (License No. 655473)

Publications (In OnePetro)

  • Sheraz Ahmed, Muhammad Shahrukh and Azhar Khan; “An Innovative and Cost-Effective Artificial Lift Solution to revive the Dying Wells in Tight and Marginal Gas Reservoirs-Capillary Soap Injection”; URTeC 1922586; presented at the Unconventional Resource Technology Conference held in Denver, Colarado, USA 25-27 Aug 2014.


  • Sheraz Ahmed, Muhammad Shahrukh and Bilal Abdul Hakim; “Maximizing the Production Potential of Multi-Stacked Heterogeneous Compartmentalized Oil Reservoirs by Cost Effective Intelligent Reservoir Management and Monitoring - A Case Study”; SPE-170302-MS; presented at the SPE Deep Water Drilling and Completions Conference held in Glaveston, Texas, USA 10-11 Sep 2014.

Personal Information

  • Father’s Name: Muhammad Farooq
  • CNIC No.: 42101-2218292-9
  • Address: A-381 Block-9, Yaseenabad, F.B.Area, Karachi.
  • Passport No: UJ5142922
  • Cell No: +92 300 2326937 / +92 331 2109483
  • Date of Birth: February 04, 1991
  • Email I.D: muhd.shahrukh@hotmail.com
  • Residential No.: +92 21 36317885

Timeline

Senior Completions & Work Over Engineer

United Energy Pakistan
04.2019 - Current

Field Completion & Work Over Engineer

United Energy Pakistan
04.2014 - 04.2019

Bachelor of Science - Petroleum Engineering

NED University of Engineering & Technology
  • IWCF Well Intervention Pressure Control Programme (Expiry - Oct 2024)
  • “Advanced Completion Design and Operations” by Harward Technology Middle East. (Credential ID 3650-7304-8510-1546)
  • “Enhanced Well Intervention” by NEXT Well Corp.
  • “Cased Hole Logging” by NEXT. (Serial No. 65996-164537-277799)
  • “Completion Equipment” by IHRDC. (License No. 655425)
  • “Basic Completion Design and Practices” by IHRDC. (License No. 654428)
  • “Wellheads, Flow Control Equipment and Flowlines” by IHRDC. (License No. 655473)
MUHAMMAD SHAHRUKH