MICROWAVE (Huawei GSC 2022-Current)
Excellent practical experience and proficiency in the field, along with strong capabilities in integration, commissioning, and troubleshooting on Huawei RTN 900/300/6900 series using NCE.
Strong experience and proficiency in the field, along with strong capabilities in integration, commissioning, and troubleshooting on E// TNs and MLTN 2P,6P,20P and 6600 series using Minilink and Web browser.
Practical expertise in installing various technologies such as MIMO, SDB XPIC, Long Haul SD/Non SD, XPIC high cap link 16+0 on HSB and SD categories, including CA.
Hands on experience for upgrading 1+0 connections to HSB, SD 2+0 to N+N. Proficient in customer interaction, technical support, and coordination for Operations at NMS using Huawei U2000 and NCE platforms.Hands on experience of test Instruments in lab and field environment.
Media configuration E-line/E-LAN Layer3 services based on L3VPN/BGP.
MTN Nigeria Project/ Business Trip in Nigeria for Integration Support
Integration Engineer, E-band upgradation rollout & Relocaion project (2023-2025)
Successfully led the integration of a L3VPN/BGP Ring network, significantly improving deployment efficiency and reducing site rollout time.
Successfully automated manual configurations using scripting, and configured/troubleshooted various network protocols (ISIS, LDP, RSVP, L3VPN, BGP).
Over 1200+ SDBE-band /Pure links were supported in Nigeria, with a total of 800+ control card replacements.The link migration was successfully carried out on layer-3 VPN/BGP services
Additionally, nearly 300 K-Band links were expanded from 1+0 to 4+0,8+0/CA. Furthermore, an appreciation letter was received By MTN Nigeria Frontline for the successful completion of the 10GE ready project and K-Band expansion.
Implementation Coordinator RAN (Ericsson) (July, 2019 –Oct, 2020)
During this project key responsibilities are Hardware requirement calculation, coordination with NOC for logical creation in OMCR, vendors’ management, providing first level OMC assistance to in-field teams.
To assign, schedule, supervise, provide technical and functional support to teams for installation commissioning and integration.
Catering all issues related to BSS relating from sites installation till acceptance
Coordinating with Vendors, Warehouse & other departments for equipment transportation, installation, commissioning & integration of BTS sites.
Supervising 2G & 3G swap from Alcatel to Ericsson. Includes action from site installation till cutover of site.
Supervising 2G expansion includes action from material transportation till expansion of site.
Coordinating with NOC for implementation of Creation/Hardware Change requests.
Taking PAR/ECRF windows to execute up-gradation plans.
Catering issues related to SWAP.
Keeping track of all the activities performed, taking follow ups with the vendors & updating the project manager.
Hold meetings with customer and assist with determination of project requirements.
Track the progress and quality of work being performed by sub-contractors/ASPs.
Effectively and accurately communicate relevant project information to the customer and project team.
Resolve performance issues within the ASPs and supply/ logistics organization.
Communicate ideas for improving project processes with a positive and constructive attitude.
MW Implementation Engineer Jazz/Ericsson Project Pakistan ( 2013-2020)
Technical Support:
Installation and configuration of ML6600 Series (6691, 6692, 6693,6694, 6651)
Upgradation of MW nodes from TN to ML
Performed Traffic shifting and POP shifting of sites.
Performed GE connectivity of NE sites with TN/ML with NMS coordination. Commissioning of new links for NRO sites.
Configuration of Space Diversity, 2+2 Xpic, Dual polarization and 1+1 links
Responsible for Ericsson 2PB, 6P/6PC and 20P Traffic Nodes configuration & Installation
PT 2020 Link configuration & visibility on NMS with plan DCN.
Configuration of MMU 2H, 2K, 3A
Configuration of NPU 1C/2B/2C/3/3C/ 3D, LTU 155. LTU 3
Upgrading link capacity 4Mbs to 800 Mbps
Creating SNCP (E1 Protection) Cross connection & Traffic routing for 2p, 6p, and 20p Traffic Node
To ensure E1 routing from BSC to BTS with coordination of transmission team according to MUX plan provided by TXN planning
Upgrading software for Ericsson 2P, 6P and 20P traffic node including software Up gradation for MMU, NPU and LTU
End to End testing to get the available E1’s for the 3G Node B and make it ready for integration
BSS Engineer/TI Team lead CCS Comerica Pakistan Solutions Pvt. Ltd (Mar-2012, Sep 2013)
Complete understanding of MSC installation layout of Ladder/Power Cable/Rack Position/alignment and Fiber cable Routing.
Roll Out sites complete installation, ANT azimuth & Height decision according to SSRF of site.
Feeder Cable connector making and clamping.
Integration of site to BSC.
MW Ipassolink (0.3, 0.9, 1.2) alignment, commissioning.
Installation Connection ZTE rectifier ZXDU 68 and alarm setting on CSU.
Post swap alarm testing, verification & troubleshooting of both internal & external alarms of W301, ELTECH FP2 2000, Huawei TP48200A rectifier from NOC.
Troubleshooting of SDR, GEM setting at Auto or Manual Genset.
I've been a technical support provider for MW transmission from last 13 years support world wide like Pakistan,Malysia, Iraq and Nigeria etc.., working with multipal vendors Ericsson and Huawei. Strong Support in MW link configurations and MW link installation. Skilled with Risk handling management, operations and maintenance, link upgrading, project rollout, and MW product troubleshooting