Mechanical Manager and Project Management Professional with the experience in Fabrication, Erection/ Installation, Pre-commissioning, Commissioning, and Maintenance, offering technical expertise (Engineering, Procurement, Construction and Commissioning) projects Textile machinery, Bio-Mass boiler, ETP Recycling plant, Pellet manufacturing plant, Gas boilers, waste heat recovery boilers, Eco water, wastewater energy savings projects
Proven success and record of building, developing, and managing high-performing teams, providing environment focused on teamwork, creativity, empowerment and successfully creating solutions for complex engineering problems. I have exceptional communication skills, and ability to liaise with confidence to establish strong stakeholder relationships. I also have keen interest in new technologies in mechanical engineering. Thriving under pressure to complete all projects with the best standards, I facilitate organizational growth with structured approach and using my organizational abilities.
As a project Managers applied multiple time Project tools, techniques, methodologies, procedures to control project scope, schedule, cost and successfully completed multiple projects at minimum level of change applied during planning and execution phases.
As qualified Mechanical Engineer having Project Management Professional knowledge and member of Pakistan Engineering Council (PEC) seek challenging opportunities in an organization where I can utilize my skills for the success of the business and develop myself as well.
Manager – Plant Engineering (MEP Projects & Maintenance)
June 2020 – to present
HIGHLIGHTS
l Strong knowledge and understanding of PID's, Foundation layouts, Sections, Piping Networks & Electrical.
l Review and update project scope, schedule & cost through project planning team by using MS Project
l Strong collaboration skills with all stakeholders engaged with related project.
l Developing skills to develop project team from initial phase to project closer; by using technique forming, storming, norming, performing & adjourning.
l Strong coordination with civil construction manager on site regarding foundation layout to control over change management.
l Evaluate project scope (civil, mechanical, and electrical) to develop the Bill of Quantities (BOQ) by applying cost estimation techniques and submit for approval to relevant authorities.
l Supervised International/local contractors and labor teams, ensuring that quality standards were met.
l Site Walk through to ensure real monitoring & control over Project Scope, Schedule, Cost and Quality
l Identification of Risk during project Initiating to execution; also applying best practices to mitigate
l Present quarterly meeting to hire Management Capex/ Revex CPI/SPI performance evaluation.
Achievement/Projects:
l Revamp/installed Textile more then 50 machines, Bleaching unit, Dyeing machines, Stenter, Pentek, Salvade Dryers, Fabric printing machines, continuous washing and digital printing (Project Value 2.2 billion PKR)
l Lead procurement planning , selection and installation of state of the art Chinese textile printing plant WINWIN Machinery ; worked with Chinese engineer including visit china shanghai in 2023 for procurement and inspection of machines. (Project Value 250 Million PKR)
l Successfully installed 15-ton/hr waste to energy bio-mass boiler from initial phase to closure.Directly involved with international /Chinese engineer in execution /commissioning phase. (Jinma Boiler) (Project Value 200 Million PKR)
l Design and execute complete process water network of the factory, including selection of piping, pumps, and pump stations, as well as coordination of related civil works. (Project Value 10 Million PKR)
l Installation of Pellet production machines using textile waste material to develop the pellet ; utilization of pellets in coal boiler (Project Value 70 Million PKR)
Ongoing Projects:
l Installation of Knits Production Machine (DMS Brand) working with Turkish engineers' production capacity 8000kg of fabric /day. Utility network installation work in process like Metal Supports, Steam piping, Condensate, Hot water, Cooling return, Drain lines, Compressed air piping & Electrical Panels etc
l Installation and commissioning of a 2000 KW Solar Panel project, resulting in substantial natural gas savings and a significant reduction in greenhouse gas emissions, showcasing expertise in sustainable energy initiatives.
Assistant Manager- (Maintenance & Projects)
July 2017 – June 2020
HIGHLIGHTS
l Lead all activities related to permanent corrective action during machinery shutdowns, ensuring efficient and effective maintenance processes.
l Provide valuable technical support to the Rotating & Pneumatic equipment maintenance team, facilitating smooth operations and swift issue resolution.
l Effectively manage and handle the ERP system, including work request, work order tracking, resource allocation, purchase requisitions (PR), and preventive maintenance (PM)applications/modules.
l Oversee the management of machinery section costing, including spare parts procurement, planned and unplanned shutdowns, manpower allocation, and training/certification programs for Supervisors and Technicians.
l Review and implement a Predictive Maintenance Program, including criticality analysis, defining data collection frequencies, scheduling maintenance tasks, creating data collection route codes, preparing job plans, and proposing new preventive maintenance tasks to enhance machinery reliability, availability, and productivity.
l Conduct research and propose the adoption/utilization of new and innovative technology and automation options to maximize efficiency, eventually improving the service delivery of the engineering department
l Preparation of annual maintenance budget of respective sections and monthly review of expenses to have better control over allocated budget.
l Coordinate for internal and external Audits.
l Orient with the organizational objectives and master plans strategically, translate the implications for PE function to the team and derive annual functional KPIs, projects and plans to help meet the organizational objectives.
Achievement/Projects:
l Revamp complete condensate system of textile factory by installation of condensate recovery pumps TLV; by using the technology recover 15ton condensate/day.
l Successful installation and commissioning of a 1.5MW MTU Gas Engine with a Waste Heat Recovery Steam Boiler of capacity 1600 Kg/hr. @10 Bar
l Contributed to the commissioning of a 42m3/hr. Reverse Osmosis (RO) Plant with an impressive 70% water recovery rate.
l Played a pivotal role in the end-to-end process of erecting and commissioning the Zimmer digital printing machine, showcasing comprehensive involvement in the successful implementation of advanced printing technology.
l Engaged in the end-to-end process of erection and commissioning for Exhaust Dyeing Machine, actively contributing to the setup and integration of utility lines.
Senior Executive Officer- (Maintenance & Projects)
Aug 2016 – July 2017
HIGHLIGHTS
l Manage Engineering and Maintenance services to ensure that production machines are in best operative conditions.
l To keep all the relevant machinery and equipment in excellent working conditions and to reduce any unforeseen/unscheduled down times to avoid production losses.
l Planning and implementation of capital/non capital work projects with effective cost estimation to keep the projects most viable and economically sustainable.
l Conduct site surveys/visits to ensure best working condition of plant machinery/equipment. To coordinate with operational department for improved service delivery and maintenance related instructions.
l Coordinate with equipment/machinery vendors for prompt technical assistance for timely availability of required services and parts.
l Review & scan the existing operations & identify areas of improvement; guide & direct team efforts to look into improvement of processes.
l Review the cost sheets & analysis prepared by the Costing & Budgeting department to ensure that costs are allocation properly, identify opportunities for cost improvement and take remedial actions wherever required.
l Effectively manage and handle the ERP system, including work request, work order tracking, resource allocation, purchase requisitions (PR), and preventive maintenance (PM) applications/modules.
Achievements/Projects:
l Maximized energy efficiency through RCR installation at waste hot water heat recovery machines, generating 20 m³/hr. hot water at 80 °C. Achieved annual savings of 3 ton steam saving , translating to a cost reduction of 10 million/Year , highlighting expertise in sustainable energy practices and system optimization.
l Led the precise planning, execution, and commissioning of the Printing machines, overseeing a seamless installation process and ensuring peak operational performance.
l Managed erection and commissioning of Contentious washing Machine, ensuring meticulous installation and seamless integration into the production line. Improved operational efficiency and output quality.
HIGHLIGHTS
l Design and implement preventive maintenance schedules to ensure the reliable operation of mechanical systems, reducing unplanned downtime.
l Quickly diagnose and address mechanical failures through breakdown maintenance, ensuring rapid recovery and minimal production disruption
l Implement condition-based monitoring techniques to predict potential failures and optimize system uptime.
l Use predictive tools and techniques like vibration analysis, thermography, and oil analysis to monitor the condition of equipment.
l Lead energy-saving initiatives by analyzing equipment performance and implementing improvements to reduce energy consumption.
l Proficient in CMMS (Computerized Maintenance Management System) and equipment management software.
l Expertise in root cause analysis (RCA) for breakdowns.
l Knowledge of automated monitoring systems and performance tracking.
l Continuously monitor and analyze MTTR and MTBF metrics to identify trends, weaknesses, and improvement opportunities in mechanical systems.
l Managed the maintenance and repair of various rotary equipment, including pumps, motors, and gearboxes, to ensure continuous and optimal operation.
Achievements/Projects:
l Designed and installed an in-house Steam Condensate Recovery System at bleaching machine, achieving an impressive annual energy savings of 5000 MMBtu/year and annual cost savings of 10.5 million (PKR).
l Led the implementation and commissioning phases for an Effluent Treatment Plant (ETP) boasting a capacity of 56 m³/hr., ensuring smooth operations and compliance with environmental regulations.
l Led the precise planning, execution, and commissioning of the Bruckner Stenter machine, orchestrating a seamless installation process and ensuring peak operational performance. This initiative significantly bolstered production capabilities at the facility.
l Successfully managed the erection and commissioning of the Yongda Sanforizing Machine, overseeing a meticulous installation process and ensuring its seamless integration into the production line, contributing to improved operational efficiency and output quality.
l Successfully managed the erection and commissioning of the Bono Oil Heater, coupled with the design of a high-capacity line with a total output of 5.6 MW.
l Maximized energy efficiency through gas engine jacket heat recovery, generating 25 m³/hr. hot water at 50°C. Achieved annual savings of 10,000 MMBtu, translating to a cost reduction of 20 million, highlighting expertise in sustainable energy practices and system optimization.
l Led the precise planning, execution, and commissioning of the Monfort's stenter machine, overseeing a seamless installation process and ensuring peak operational performance.
l Managed erection and commissioning of Monfort's Sanforizing Machine, ensuring meticulous installation and seamless integration into the production line. Improved operational efficiency and output quality.
HIGHLIGHTS
l Fabrication/Construction of Porta cabins having on site facility of residential rooms, Kitchen, Ghym etc for oil rigs plant as per drawing.
l In-house house manufacturing of Meat storage chiller plants having 10ton cooling capacity of each by using PU panel insulation
l Fabrication of water and oil storage tanks in complains with international standards (ISO & ASME)
l Instillation of commercial/domestic air conditioning units in Porta cabins
l Regular walk through and monitoring/controlling and maintenance of commercial and domestic air conditioning units
l Successfully Fabrication, Installation & commissioning of 40 Pcs Porta cabin's within three months of duration at rig side facilitating accommodation of 80 people.
l Making of budget of are parts and other accessories of equipment's on yearly basis and to keep spare parts in inventory.
l Work closely with clients to provide system maintenance recommendations and ensure optimal system performance
l Servant Leadership Spiritual , Physical self, Intellectual , Emotional
l Project Management
l Stakeholder, Team, Communication
l Risk, Procurement, quality
l Scope, Schedule, Cost
l Energy/Sustainability Management
l Contract Management
l Coordination with International & Local Teams
l Maintenance Management
l Customer satisfaction / voice of costumer
l Regulatory Compliance
l Health & Environmental Safety
l Inventory Management
l Designing and Installation
l Project Management Professional 2025
l Emotional Intelligence 2025
l ISO 50001 EnMS 2022
l Leading in a Quantum World 2021
l Advance Maintenance Management 2019
l Member Pakistan Engineering Council (PEC) Registration No: MECH/2934
l ENGRO ENERGY COMBINE CYCLE POWER PLANT,
QADIRPUR. PAKISTAN JUNE-JULY 2010 (4 weeks)
l THERMAL HOUSE, JAMSHORO PAKISTAN JUNE 2011 (4Weeks)
l BYCO OIL LIMTED, KARACHI. PAKISTAN. JULY 2011 (4 WEEKS)