Focused Project Manager adept at planning, directing and maintaining continuous operations in various departments. Experienced in directing manufacturing employees and keeping efficient production in accordance with quality standards. Applying creative and analytical approach to operations for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training and empowering team to excel in performance.

Overview

15
15
years of professional experience
6
6
years of post-secondary education
5
5
Certifications

Work History

Project Manager

ENVIRONMENTAL CONSULTANCIES & OPTIONS
3 2012 - Current

Job Descriptions Includes

  • HSE training to the operators who worked at WWTP plants.
  • Documentation Control of safety Training
  • Site visit and risk assessment according to Safety Policy
  • Periodically safety inspection at different sites
  • Ensure the reliability of the PPE’s at WWTP of different industries
  • Supervision of installation of plants by maintaining HSE precautions
  • Finalization of proposals for new projects and reports of the completed projects
  • Managing Operations & Maintenance of ETP, RO Plant at TCCEC & AkzoNobel, Mitchels Foods
  • Managing the team working on ETP at The Coca-Cola Export Cooperation
  • Managing the team working on ETP at AkzoNobel Paints
  • Arranging & delivering trainings about the ETP as well as Health Safety and Environment
  • Responsible for the troubleshooting at the ETP
  • Checking detailed Drawings related to Wastewater Treatment Plant
  • Auditing, monitoring and inspection from Contractor & the activities of employees of Contractor and other subcontractors on the project of The Coca-Cola Export Corporation related to safety
  • Ensure compliance with required environmental standards, procedures, policies, work plans, priorities, and internal and external audits; including QHSE norms and systems
  • Schedule work and assign crews to shifts
  • Instruct employees in work methods and interpret and enforce operating orders and procedures
  • Ensure compliance with company and client procedures, policies, work plans and priorities, including QHSE management system
  • Ensure customer satisfaction with work performed
  • Implementation of HSE policies and plan for construction going on at site
  • Log out tag out, slip and trip, fall hazards, electrical hazards, chemicals hazards, spillage hazards, SSOW (safe system of work) of every job task, manual handling of powered and non-powered tools etc
  • Responsible for supervision of day to day HSE activities, keeping update daily progress reports, weekly and monthly progress reports, and dealing with client, Contractors and sub-contractors as well
  • Maintain project documentation in a central repository
  • Implementing the agreed action plan to the agreed standards and deadlines
  • Ensure the overall coordination of the work of a project
  • Provide training, supervision, mentoring and guidance to the SAFETY group leader, and the rest of his team (safety officer, safety inspectors, scaffold inspectors etc.)
  • Drafted project reports to identify successful outcomes, insights and future recommendations.
  • Prepared and submitted project invoices for review and approval.
  • Streamlined project processes by implementing Agile methodologies, resulting in increased efficiency and reduced costs.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Developed and implemented project plans and budgets to ensure successful execution.
  • Provided detailed project status updates to stakeholders and executive management.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Managed projects from procurement to commission.
  • Reported regularly to managers on project budget, progress, and technical problems.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Planned, designed, and scheduled phases for large projects.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Analyzed project performance data to identify areas of improvement.
  • Negotiated contracts with vendors and suppliers, securing quality materials at competitive prices for efficient use of resources.
  • Ensured regulatory compliance by closely monitoring applicable laws and regulations within the industry sector throughout each stage of the project life cycle.
  • Worked well in a team setting, providing support and guidance.
  • Worked effectively in fast-paced environments.
  • Proven ability to learn quickly and adapt to new situations.
  • Worked flexible hours across night, weekend, and holiday shifts.
  • Learned and adapted quickly to new technology and software applications.
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution.
  • Demonstrated strong organizational and time management skills while managing multiple projects.

Assistant Operations Managers

ENVIRONMENTAL CONSULTANCIES & OPTIONS
03.2010 - 03.2012
  • Job Descriptions Includes
  • Environmental Monitoring in the field
  • Supervised wastewater treatment plant operations
  • Comply the Pakistan Environmental Quality Standards by performing of quality work
  • Preparing and implementing shutdown pans and reporting to the upper management.

Assistant Manager(Dyeing Processing)

STYLE TEXTILE (Pvt.) Ltd
Lahore, Punjab, Pakistan
02.2009 - 01.2010
  • Job Descriptions Includes
  • Served as a liaison between employees and upper management effectively facilitating communication that bridged any existing gaps.
  • Led the production of dyeing unit up to 10 tons and also led the team of 40 workers during my shift with Controlling 16 dyeing Machines
  • Involved in the meetings regarding the dyeing production and planning
  • Executed startups and shutdowns successfully
  • Implement EHS policies, standards and procedures to ensure integrity of People, Environment, Assets and Reputation of the Company
  • Worked in close liaison with Maintenance Department to resolve plant problems, condition monitoring to improve plant availability and reliability
  • Prepare, review and revise Operating work instruction and Procedures in line with standards and guidelines for safe and smooth plant operations
  • Lead and motivate personnel under my command to enhance productivity
  • Recording all the activities related to production unit operations and operators in a Log Book daily checked by plant manager.

Education

B.S. Chemical Engineering -

Institute of Chemical Engineering And Technology, University of The Punjab, Lahore, Punjab, Pakistan
09.2003 - 08.2007

PGD in Health Safety And Environment (HSE) -

University of Engineering And Technology, Lahore, Punjab, Pakistan
09.2019 - 08.2021

Occupational Health And Safety

NEBOSH IGC
02.2022 - 05.2022

ISO 45001 Safety Lead Auditor

OSHA Occupational Safety And Health Administration

HABC (Highfields Awarding Body For Compliance)

Skills

Understand flow sheets PID (piping & instrumentation diagrams), PFD (process flow diagrams), and Block flow diagram

undefined

Certification

NEBOSH IGC certified

Personal Qualifications

B.S. Chemical Engineering, Institute of Chemical Engineering and Technology, University of the Punjab, Lahore, 2003-2007

PGD Health Safety & Environment , Department of Chemical and Metallurgy Engineering,University of Engineering & Technology,

Lahore 2019-2021

Passport Number

DG1227093

Pec Registration Number

Chem/10134

Projects During Study

  • Plant design on Hydrodesulphurization of Gas Oil 30000 bbl. /day.
  • Process report on Removal of Hexavalent Chromium from Fertilizer Wastewater.
  • Optimization of chemical treatment of wastewater of paint industry

Internship

Attock Refinery Limited, Morgah, Rawalpindi, 07/01/2005, 07/31/2005, Went under an internship for 1 month in July 2005, where I studied about Plate forming Unit and also learned about line tracing of the unit. Spent some time in the laboratory and studied about quality tests for the industry. Most importantly learned safety measures of the petroleum industry.

Timeline

NEBOSH IGC - , Occupational Health And Safety
02.2022 - 05.2022
University of Engineering And Technology - PGD in Health Safety And Environment (HSE),
09.2019 - 08.2021
Assistant Operations Managers - ENVIRONMENTAL CONSULTANCIES & OPTIONS
03.2010 - 03.2012
Assistant Manager(Dyeing Processing) - STYLE TEXTILE (Pvt.) Ltd
02.2009 - 01.2010
Institute of Chemical Engineering And Technology, University of The Punjab - B.S. Chemical Engineering,
09.2003 - 08.2007
NEBOSH IGC certified
ISO 45001 (Lead auditor)
OSHA (Occupational Safety and Health Administration)
HABC (Highfields Awarding Body for Compliance) Level 2
OHSAS 18001:2007 Certified (Lead Auditor) (06/2017-06/2020)
ISO 45001 Safety Lead Auditor - ,
OSHA Occupational Safety And Health Administration - ,
HABC (Highfields Awarding Body For Compliance) - ,
Project Manager - ENVIRONMENTAL CONSULTANCIES & OPTIONS
3 2012 - Current
MUHAMMAD IMRANCHEMCIAL ENGINEER