Summary
Overview
Work History
Education
Skills
Certification
Work Profile
Positionwanted
Jobcategories
Personal Information
Instrumentsused
Timeline
Generic
Muhammad Bilal Azhar

Muhammad Bilal Azhar

Land Surveyor
Doha,PB

Summary

To acquire a challenging position to be an integral part of your esteem and oriented organization where I can propose my knowledge in the field of land Surveyor and contribute my skills, interest and academic training while having an in-depth knowledge of land surveying principles and theories to success the company's project well with experience more than 06 years at Qatar as well as at Pakistan.

Overview

11
11
years of professional experience
1
1
Certification
1
1
Language

Work History

Land Surveyor

QD-SBG Construction
08.2015 - Current
  • Company Overview: Client; Lusail real estate co
  • Doha, State of Qatar
  • Project's name; 1; Lusail plaza infrastructure project, LRT station, Car parking and landscaping
  • 2; Lusail plaza towers BP12
  • 1:PM\CM consultant; PARSONS Qatar
  • Supervision Consultant; Dorsch Qatar
  • 2:PM\CM consultant; LOUIS BERGER + QPM
  • Supervision Consultant; DAR AL HANDASAH
  • All the activities did, I managed all the issues if have at site with coordination of construction team and resolve the problems without delaying the work and did the inspections with consultant
  • Layout all the lines and followed up for excavation of trenches, manholes etc
  • Did the alignment and sloped level for all he lines (potable water, sewage water, pneumatic waste collection, low voltage, extra low voltage, high voltage, surveillance security, telecommunication lines etc.) as per approved drawings
  • Did the final checking and check with consultant of utilities lines and backfill all lines and backfill for road work as per design
  • As per approved shop drawing of tunnel, layout for excavation of trench in horizontal and vertical slope along with preparing the side walls as per mentioned side slope in the shop drawing
  • Work for Parking having 5 basement floors on raft foundation & frame structure building which also includes ramps, core walls (for stair, elevator pit, shafts opening) and slab with drainage slope & MEP openings
  • Also includes retaining walls under maintaining dewatering works
  • Took the drawings and directly follow up for excavation work up to formation level for structure of car park having excavation more than 20m and prepared the side slope for excavated area's walls as per approved drawings
  • Did all the survey work for civil structure having rafts, shear walls, columns, core walls, ramps, slabs as per approved shop drawing, solving the related issues
  • Did all the finishing work in parking structure for block work, kerbstones upstands, epoxy, marking of signs and finishing for ramps
  • Did all work for plaza at roof including utilities, MP Theater, canopy, tree pits, granite laying and kerbstone
  • Did the layout for construction of raft foundation in tunnel, the retaining walls, shear walls, ramps, intermediate slabs and pergola slabs of structure having 04 levels inside (level for Lusail railway train's track, station, level for entrance in car parking connected and for the road etc.)
  • Did all the activities in tunnel for utilities, drainage channels, MEP and all filling for base and then did the asphalt for the tunnel of Lusail highway with road speed 120km/h
  • Layout Structure work for the overhead bridges and pedestrian coming at trough
  • Layout for shoring works & following for piles drilling, elevation for secant piles, friction piles & micro piles
  • Construction for capping beam on pile head & construction for Waller beam with secant piles & friction piles having anchor sleeves for stressing
  • Layout & construction of parapet wall having utilities & MEP opening as per section & elevation with horizontal and vertical slope
  • Layout & construction for diaphragm wall as per design along sea wall having installation of anchor sleeves for stressing & did sea wall monitoring by monitoring devices during construction of D-wall
  • Preparing survey reports of work done & used civil 3D for taking data in detail
  • Client; Lusail real estate co
  • Doha, State of Qatar
  • Project's name; 1; Lusail plaza infrastructure project, LRT station, Car parking and landscaping
  • 2; Lusail plaza towers BP12
  • 1:PM\CM consultant; PARSONS Qatar
  • Supervision Consultant; Dorsch Qatar
  • 2:PM\CM consultant; LOUIS BERGER + QPM
  • Supervision Consultant; DAR AL HANDASAH

Land Surveyor

KINGCRETE BUILDERS (PVT) LTD.
07.2014 - 08.2015
  • Company Overview: Project; CMH Extension Project GHQ RWP
  • Consulting; DCI MES (Military Engineering Services)
  • Managing all construction activities related to survey
  • Solving issues when needed for site surveyors
  • Checking of construction drawings with field problems and proposing changes if required to site team
  • Preparing working drawings by calculations through construction drawings
  • Preparing daily activities reports Solving issues when needed for site surveyors
  • Setting out of Road, Krebs (straight & curved) and utilities Services (storm water, drainage and sewer works), vertical control as per design levels and existing Topographical survey, to do reconnaissance to locate suitable positions for traverse stations alongside the corridor selected for proposed road alignment
  • Responsible for new bench mark establishment, and performing traverse for reducing and checking error in bench marks to adjust the difference for having precise bench marks for infrastructure critical work layout
  • Lay out of all kinds of different structure from excavation up to the top finishing of structure
  • Project; CMH Extension Project GHQ RWP
  • Consulting; DCI MES (Military Engineering Services)

Land Surveyor

AL-NOOR BUILDERS & CONSTRUCTION HUB (PVT.) LTD.
06.2013 - 06.2014
  • Company Overview: Project; AL-NOOR Builder & Construction Hub (Pvt.) Ltd
  • Consulting; Lahore Ring Road Project section 2 package 4,5,6,7
  • Different type of work like SWD pipe line Drainage pipe line kerb stone and walkways
  • Design work for house connections and cover level for chambers and main holes
  • Calculating and fixing of invert of Drainage and Sewer pipelines
  • Control of Layers
  • Calculation of vertical and horizontal alignment
  • Responsible of Roads and setting out for roads alignment
  • Formation, Road base, Asphalt and interlocked pavement
  • Material testing: Slump test, compression test, field density, C.B.R test etc
  • Project; AL-NOOR Builder & Construction Hub (Pvt.) Ltd
  • Consulting; Lahore Ring Road Project section 2 package 4,5,6,7

Education

D A E - Civil Engineering

Punjab Board of Technical Education Lahore

F.S.C - Pre Engineering

BISE Rawalpindi Board

Matriculation - undefined

BISE Rawalpindi Board

AutoCAD Civil 3D - undefined

Nice institute of learning Punjab

MS Office - undefined

Punjab College of computer sciences (M.B.Din)

Skills

Good knowledge of construction sequences and methods

Certification

I hereby certify that the above supplied information are true and correct to the best of my knowledge.

Work Profile

  • QD-SBG Construction, Lusail real estate co., Doha, Qatar, Lusail plaza infrastructure project, LRT station, Car parking and landscaping, PARSONS Qatar, Dorsch Qatar, Lusail plaza towers BP12, LOUIS BERGER + QPM, DAR AL HANDASAH, Land Surveyor, 08/01/15, Present, 5 years, Managed all the issues at site with coordination of construction team and resolved problems without delaying the work., Layout all the lines and followed up for excavation of trenches, manholes etc., Did the alignment and sloped level for all lines as per approved drawings., Did the final checking and check with consultant of utilities lines and backfill all lines as per design., Worked for Parking having 5 basement floors on raft foundation & frame structure building., Took the drawings and directly followed up for excavation work up to formation level for structure of car park., Did all the survey work for civil structure as per approved shop drawing., Did all the finishing work in parking structure., Did all work for plaza at roof including utilities., Did the layout for construction of raft foundation in tunnel., Did all the activities in tunnel for utilities, drainage channels, MEP., Layout Structure work for the overhead bridges and pedestrian., Layout for shoring works & following for piles drilling., Construction for capping beam on pile head., Layout & construction of parapet wall., Layout & construction for diaphragm wall as per design., Preparing survey reports of work done & used civil 3D for taking data in detail.
  • KINGCRETE BUILDERS (PVT) LTD., CMH Extension Project GHQ RWP, DCI MES (Military Engineering Services), Land Surveyor, 07/01/14, 08/01/15, Managing all construction activities related to survey., Solving issues when needed for site surveyors., Checking of construction drawings with field problems., Preparing working drawings by calculations through construction drawings., Preparing daily activities reports., Setting out of Road, Krebs and utilities Services., Responsible for new benchmark establishment., Lay out of all kinds of different structure from excavation up to the top finishing.
  • AL-NOOR BUILDERS & CONSTRUCTION HUB (PVT.) LTD., AL-NOOR Builder & Construction Hub (Pvt.) Ltd., Lahore Ring Road Project section 2 package 4,5,6,7, Land Surveyor, 06/01/13, 06/01/14, Different type of work like SWD pipe line Drainage pipe line kerb stone and walkways., Design work for house connections and cover level for chambers and main holes., Calculating and fixing of invert of Drainage and Sewer pipelines., Control of Layers., Calculation of vertical and horizontal alignment., Responsible of Roads and setting out for roads alignment., Formation, Road base, Asphalt and interlocked pavement., Material testing: Slump test, compression test, field density, C.B.R test etc.

Positionwanted

LAND SURVEYOR

Jobcategories

  • Contractor
  • Consultant

Personal Information

  • Citizenship: Pakistan
  • Date of Birth: 12/15/92
  • Driving License: Qatari, Pakistani
  • Marital Status: Unmarried

Instrumentsused

  • Different kinds of total stations like Leica (builder 502, 503), Leica (TS11, TS12, TS15), LEICA (TS 06 PLUS, TS 09), Trimble M3.
  • Different types of GPS such as Leica GS15, GS14.

Timeline

Land Surveyor

QD-SBG Construction
08.2015 - Current

Land Surveyor

KINGCRETE BUILDERS (PVT) LTD.
07.2014 - 08.2015

Land Surveyor

AL-NOOR BUILDERS & CONSTRUCTION HUB (PVT.) LTD.
06.2013 - 06.2014

D A E - Civil Engineering

Punjab Board of Technical Education Lahore

F.S.C - Pre Engineering

BISE Rawalpindi Board

Matriculation - undefined

BISE Rawalpindi Board

AutoCAD Civil 3D - undefined

Nice institute of learning Punjab

MS Office - undefined

Punjab College of computer sciences (M.B.Din)
Muhammad Bilal AzharLand Surveyor