Knowledgeable with extensive experience in managing mechanical, electrical, and plumbing systems. Successfully coordinated large-scale projects, ensuring timely completion and adherence to safety standards. Demonstrated leadership in team collaboration and problem-solving, maintaining high-quality outcomes.
Overview
9
9
years of professional experience
1
1
Certification
Work History
MEP Supervisor
ORIENT RENTAL MODARABA
Quetta, Balochistan, Pakistan
07.2022 - Current
Increased energy savings with regular monitoring of HVAC, electrical, and plumbing systems.
Assembling of york ,carries ,wolf ,sabro AHUs water coolers fresh air unite, package unite and split unite.
worked on sub station electrical panel installation.
Installation servicing and repairing of HVAC system.
chiller and pumps operation and maintenance.
measure ,cut ,thread ,and bend pipe or tubing using pipe fitters tools.
Improved safety standards by ensuring compliance with local building codes and regulations.
Updated technical knowledge through professional development opportunities, enhancing job performance and staying current with industry trends.
Streamlined work processes, coordinating activities between various trades to ensure smooth project completion.
Industrial Electrician
Greaves Airconditioning
Quetta, Balochistan, Pakistan
05.2017 - 06.2022
Collaborated with engineers and other technicians for the successful completion of various industrial projects
york 200 ,150 ton chiller .carrier 30GXK 150 chiller .
SABRO 75 ton chiller .DELCHI chiller 16 ton.
PCC (power control panel ) .MCC (motor control center ) HT and LT panel works .
Installed, maintained and repaired electrical wiring, controls and lighting systems.
Connected wires to circuit breakers, transformers, and other components.
Studied building schematics to determine location of wiring and equipment.
Tested electrical systems functionality and continuity of circuits using devices such as ohmmeters, voltmeters and oscilloscopes.
MRI Power Technician
BMC
Quetta, Pakistan
03.2018 - 02.2019
Improved equipment performance by conducting regular maintenance and troubleshooting issues.
power Amplifiers and compensative unite installation
Executed installation processes to ensure proper setup and functionality of systems.
Conducted routine inspections to identify potential issues and prevent system failures.
Increased customer satisfaction with prompt and knowledgeable support for various technical issues.
Optimized system performance thorough testing and analysis.
Diagnosed and repaired problems with electrical and mechanical systems.
Completed preventive maintenance on machines to enhance production and maintain quality.
Power Engineer
Afridi Enterprises
Quetta, Balochistan, Pakistan
03.2016 - 05.2017
Designed custom test plans for evaluating the performance of newly installed equipment or systems under specific operating conditions.
Optimized power distribution networks by analyzing load profiles and recommending appropriate upgrades or modifications.
Developed technical documentation for engineering processes, facilitating knowledge transfer among team members.
Maintained power plant compliance with industry safety and environmental standards.
Managed project budgets and resources effectively, ensuring successful completion within deadlines and cost constraints.
Education
Bachelor of Arts -
Balochistan university
01.2017
Telecommunication Engineering -
BUITEMS
01.2014
Intermediate -
BISE Balochistan
01.2009
Matriculation -
BISE Balochistan
01.2007
Skills
Network Designing
Office automation
Power projects
Team Leadership
Electrical systems
HVAC systems
Site safety
Certification
Certificate of Excellence, All Balochistan Industrial Electrician 3rd Position, 12/19/18, BBSQ
Certificate of Excellence, In zonal competition Industrial Electrician 1st position, 12/05/18, BBSQ
Certificate of Completion, Electronics 1st position, 01/03/17 to 12/25/17, TTC Quetta
Certificate of Completion, Industrial Electrician 1st position, 05/02/17 to 11/28/17, TTC Quetta
Certificate of Completion, Domestic Electrician 1st position, 03/02/17 to 07/01/17, GTTTC Quetta
Certificate of Excellence, Poster Competition 1st Position, 04/24/14, FICT, BUITEMS
Certificate of Excellence, Project Competition 3rd Position, 04/2014, FICT, BUITEMS
Certificate of Completion, Introduction to Network Designs A, 12/03/12 to 12/17/12, NIDA, Pakistan
Certificate of Participation, Speech Contest on the title 'Drug Abuse', 07/14/14, BC, Quetta
Languages
Pashto
Brahwi
English
Urdu
Thesisreport
Hybrid Solar Tracking System with Wind and WAPDA control.
Fieldworksexperiences
Six weeks internship at PTCL, Quetta.
Working with Afridi Enterprises as a Power Engineer.
Work in MARTIN DOW as industrial electrician.
One-year NIP internship with Irrigation Department.
Social welfare team leader for one year voluntarily.
Two-month work experience at NGO as a data collector in charge.
One-year internship with 92 News as a DSNG Engineer.
One year work as MRI power technician BMC Quetta.
Six months work in UNICEF as EPO (SHAOR PK).
Work with GEP-BEP Internal SMIP as admin/finance officer.
Extraskills
Power Projects
Science Projects
Research on new Technologies
Team Leadership
Debater
Conferencessymposium
Attended IEEE conference at BITEMS, Quetta.
Interview Skills at BUITEMS, Quetta.
Workshop on BEMIS Data collection, Data entry, software for one day.
Interest
Mini electronic Projects
Games & book reading
High power projects on solar and wind
Postaladdress
Al Imran Oil shop opposite to custom house Air port Road, Quetta, Baluchistan