CARRIER OBJECTIVE Accept and enjoy the new situation and challenges, make positive contribution towards the given position, Enhance the business of organization and enhance the knowledge, abilities and skills through organization by contribution.
1. Prepared the Plant layout before commencing of civil works
2. Monitoring all civil works including foundations of sheds, pumps and panels etc.
3. Prepared the Plant piping General arrangement drawings with Designer
4. Prepared the Tanks drawings with designer.
5. Monitor and ensure the piping execution according to the design.
6. Monitor and ensure the tanks fabrication and erection according to the design.
7. Monitor the pipe testing likewise hydro test, pneumatic with 3rd party coordination.
8. Monitor the tanks testing likewise Vacuum, MPI, and hydro test with 3rd party coordination.
9. Ensure the insulation work of tanks and piping.
10. Monitor the paint work of tanks and piping.
11. Monitor of all sheds fabrication and erection.
12. Monitor Shed sheeting erection as per design.
13. Commissioning of pumps, compressor etc.
14. Commissioning of Pipe lines and tanks.
15. Good Coordination in between company executive, contractors and 3rd party.
16. Prepared the plant progressive on the bases of daily, weekly and monthly and reported to COO and Chief Engineering and Fuchs Seniors.
17. Checked the Direct/ Indirect material specs as per code and procured from market.
1. As an Assistant manager plant operation shall be overall responsible for management and control of whole plant operation (Base oil, Additives and finished product receiving to Finished Product dispatch).
2. Responsible to effectively carry out practical implementation of quality policy.
3. Responsible to ensure compliance of work instruction and procedure in Plant area.
4. Responsible to create new work instruction, standard operating procedure “SOP”.
5. Responsible to achieved given production target and checking on daily bases.
6. Responsible to ensure proper time and motion study for machine, man for good result and get more efficiency.
7. Responsible to timely calibrate all machine and equipment.
8. Responsible to ensure smooth operation without any minor and major accident.
9. Responsible to ensure the loose gain not increase the assigned limits.
10. Responsible to monitor production related all process.
11. Responsible to create trained staff/Worker.
12. Responsible to resolve problems and outstanding issues.
13. Improve system of organization.
14. Responsible to reduce plant expense with the help of management.
15. Responsible to reduce down time with help of maintenance department.
16. Study manpower setup and machines behaviour to increase productivity and automation.
17. Internal audit for whole operation.
18. Ensure good housekeeping in Plant premises.
19. Responsible to any other responsibility assigned by Chief Operating Advisor.
In Hi-Tech Blending Pvt Ltd before commissioning the LOBP.
1. Prepared Plant layout before commencing of civil works.
2. Monitoring all civil works including foundations of sheds, pumps and panels etc.
3. Prepared the Plant piping General arrangement drawings with Designer
4. Prepared Tanks drawings with designer.
5. Monitor and ensure piping execution according to design.
6. Monitor and ensure tanks fabrication and erection according to design.
7. Monitor the pipe testing likewise hydro test, pneumatic with 3rd party coordination.
8. Monitor the tanks testing likewise Vacuum, MPI, and hydro test with 3rd party coordination.
9. Ensure the insulation work of tanks and piping.
10. Monitor the paint work of tanks and piping.
11. Monitor of all shed's fabrication and erection.
12. Monitor Shed sheeting erection as per design.
13. Commissioning of pumps, compressor etc.
14. Commissioning of Pipe lines and tanks.
15. Good Coordination in between company executive, contractors and 3rd party.
16. Prepared the plant progressive on the bases of daily, weekly and monthly and reported to COO and Directors.
17. Checked Direct/ Indirect material specs as per code and procured from market.
Management skillsManaged, supervise and trained team member of served organizations
1- Done a Technical FAT (Factory Acceptance test) for ABB system in France.
2- Done a Technical FAT for CFT COMACO filling machine in ITALY.
3- Done a Technical FAT for HOT OIL system in Germany (Accentic).
4- Done a Technical FAT for both filling machines Drums and Pail/Bucket with Local vendor FD&C.
5- Commissioning of all filling machines.
6- Commissioning of complete ABB blending system.
7- Commissioning of oil heating system.
8- Commissioning of Air Compressors (Atlas Copco)
9- Commissioning of all pumps and utilities (Generators, weigh bridge, electrical system of LOBP.
From ABB France Mechanical Supervision