Summary
Overview
Work History
Education
Timeline
Generic
MEMONA FAYAZ

MEMONA FAYAZ

Electrical And Automation/ Instrumentation Engineer
LAHORE

Summary

I am a diversified Electrical and Automation engineer having 4.5 years of experience in team leadership ,instrumentation ,control systems, electrical installations, PLC programming , SCADA and HMI development ,project designing and plant maintenance. I am able to develop strong and innovative solutions to complex problems by identifying the root causes of issues and take personal responsibility for making decisions .

Overview

5
5
years of professional experience
9
9
years of post-secondary education
2
2
Languages

Work History

Application Engineer

Avanceon , Middle East And South Asia
Lahore
03.2021 - Current

Responsibilities:

  • Manage automation projects as assigned
  • Lead Client Kick-Off Meetings, Vendor handling, and Internal Coordination
  • Work in the development team in PLC Coding, HMI development, SCADA configurations
  • Material Submittals/Approvals: Clause by Clause Compliance of proposed material against URS Communication with Vendors/Suppliers
  • Selection of materials
  • Design Drawings and documentation: System Architectures, Cause and Effects, Panel drawings, Layout drawings, FRS, DDS (Detailed Design), FAT, SAT

Projects:

1. Process optimization and SCADA revamp at PTC AKORA.

Working: Designing and working on MAR ,PLC Network layout designing, HMI programming in Factory Talkview for Rockwell systems. Logic migration and development on RsLogix5000.Servers and Thin Client installation.

2. 60 MMSCFD GLYCOL(TEG) DEHYDRATION TYPE NATURAL GAS PROCESS PLANT

Working: Logic Development on studio 5000, HMI development on Factory Talkview studio. System architecture design ,BOQ ,IO list development

3. Design, Engineering, Supply, Installation, Testing and Commissioning of Synthetic Natural Gas (SNG) Farm (G3) at Qetaifan Island

Working: Logic Development on studio 5000, Factory TalkView Machine edition and Site edition application development. System architecture design , Technical Documentation

4. Execution of main tunnel for King Salman

Working: IO List Development, operation and maintenance manual development, Method Statement development, FDS development

5. Muhammad Bin Suleman MISK city infrastructure

Working: IO List Development, SCAD Development for 10 stations on WinCC unified comfort TIA portal , HMI development on WinCC unified TIA portal , Logic development for RTU’s ,FAT

6. Rehabilitation of Al-Mafraq Waste Water treatment plant Treatment Plant

Working: IO List Development, HMI development ,Logic development for 9 stations,Logic sequences testings


Design Engineer

Rapidtack
Lahore
11.2020 - 03.2021
  • Research Work on Energy management system for EV’s
  • Implementation and designing of electric power system for electric cars using super capacitors and Li ion batteries.

Electrical and Automation Associate Project Engineer

Nestlé, Sheikhupura
03.2019 - 09.2020

Responsibilities:

  • Planning and carrying out project activities according to respective time lines
  • Site work management
  • Leading of electrical and automation team and ensuring site works are done properly in terms of quality, efficiency and according to Nestle standards and compliance's
  • Make sure that the project design is based on Nestle Corporate Business Principles, Nestle E&A Standards, local regulations and defined User Requirements Specifications
  • Design and installation of different electrical panels according to the Nestlé requirements
  • Design of different electrical schematic drawings and P&ID's
  • Testing, commissioning, start up and maintenance for the instruments installed in thefield
  • Follow up of the solution development and FAT to resolve issues before commissioning of the project Implement full compliance to standards to ensure process & equipment safety for people, products and environment

Projects:

1. Upgrading of Lindor panel by converting Local I/O's to Flex I/O's

Working: Documentation of instruments tags, working, location, DI, DO ,motor types(VFD/direct DOL),connection in new panels (Fcp01/Fcp02/MCC) .GA's and technical drawings updating of panels. Verification of instruments location working and DI/DO from PLC program and HMI

2. Installation and commissioning of new CIP station at Infant Cereal plant

Working: Cable laying and termination from MCC and FCP to respective instruments , Cold testing of CIP station by operating instruments from HMI and observing instrument behaviour according to process automation .Calibrations of instruments on simulation mode.Verification of system operating sequence verification by running Acid,Caustic and water according to designed parameters in HMI

3. Egron 1 CIP programming, temporary connections of ZL-Line Process with Egron 1 CIP station

Working: installation four mechanical lines (two for tanks return and supply and two for pipes return and supply) with four valves .Modification in PLC program to run CIP in plant .Commissioning with verification of automation sequences and phases

4. DRYMIX upgrading and programming

Working: PCD development and modification according to URS .PLC programming and HMI development of drymix system according to PCD. Verification of process sequences and phases according to PCD by running program simulation

5. Electrical Installation and commissioning of new skids and cereal Wheat and rice and 5m3 silos and tipping station in Cereal wet mixing Process .New skids include Balance tank skid ,Z-Line 2 skid ,Soup distribution skid, HP hot water skid) and Wetmix, Drymix ,RDR4(Gouda Mill Sifter)

Working: Cable laying and termination from MCC and FCP to respective instrument. Generation of PLC NEAT tags of all instruments. Generation of list of each instrument cable length, cable type ,location/floor input power rating .flex IO's identification for all three processes from drawing. Cold testing by operating each and every instrument from HMI and observing real instrument behavior according to process automation

6. Steam and compressed air flow meters mapping for whole factory

Creation of flowsheet and P&ID for steam and compressed air system for whole factory

Tagging of flowmeters Updating in existing system by installing flowmeters for segregating areas

7. Electricity meters mapping and SLD designing having electrical power flow

Creation and updating of SLD for electricity flow of transformers , Generator LT and LT's .Improvement in existing power system by installing and repairing energy meters.

Internship

Packages Limited
Lahore
06.2018 - 08.2018
  • SOCIALS mamona-fiaz-17195712b, having experience in team leadership and team management , instrumentation ,control systems, electrical terminations, PLC programming ,project designing and plant maintenance
  • Develops strong and innovative solutions to complex problems by identifying the root causes of issues and takes personal responsibility for making decisions
  • Project management
  • Team Leadership and team management
  • Instrumentation
  • Control System
  • PLC instruments Tagging ,URS , FDS, MAR‘s
  • PCD's ,P&ID and technical drawings
  • Ladder Logic programmer - Rs Logix 5000
  • Machines Commissioning
  • Allen Bradley PLC
  • Electrical Panel designing
  • HIGHLIGHTS
  • Electrical terminations and installations
  • HMI development and PLC programming
  • Energy management
  • Siemens TIA Portal
  • Servers Installation
  • CAD software designer
  • MATLAB Programmer, Designing of technical documentation (electrical and mechanical) related to printing machines Lemanic 82 and Rivera in Business unit folding carton BUFC section
  • Process control manuals designing
  • Waste reduction in printing machines by updating existing system.

Freelance Programmer

Freelancing
06.2018 - 01.2022
  • Online Working//MATLAB, –Cont
  • Research on 5G technologies
  • Worked in field of robotics , control system, artificial intelligence and embedded system.

Education

M.Sc. - Mechatronics and control engineering

University of Engineering And Technology
09.2018 - 09.2023

B.Sc. - Mechatronics and control engineering

University of Engineering And Technology
09.2014 - 09.2018

Timeline

Application Engineer

Avanceon , Middle East And South Asia
03.2021 - Current

Design Engineer

Rapidtack
11.2020 - 03.2021

Electrical and Automation Associate Project Engineer

Nestlé, Sheikhupura
03.2019 - 09.2020

M.Sc. - Mechatronics and control engineering

University of Engineering And Technology
09.2018 - 09.2023

Internship

Packages Limited
06.2018 - 08.2018

Freelance Programmer

Freelancing
06.2018 - 01.2022

B.Sc. - Mechatronics and control engineering

University of Engineering And Technology
09.2014 - 09.2018
MEMONA FAYAZElectrical And Automation/ Instrumentation Engineer