Listening Good music
E&I engineer with 15+ year’s experience.
Expertise in Electrical designing,installaing of MV & LV systems, testing,
repairing and maintenance planning through SAP management system Ms
Office & Ms-Project.
Good knowledge of handling project, start-ups & commissioning & sound
experience of working in Electrical Department, Operation & Maintenance of Power Generation.
Where involves E&I control of compressors,transformer,HVAC systems,Absorption chiller, Roff top electrical chillers,switchgears & LV / MV panels variable speed AC drives, Generators (Cummins, Wartsila, Jenbacher, Caterpiller and CATMAK).
CNERGYICO PK Limited (Formerly BYCO Petroleum Pakistan Ltd)
Senior Officer (Electrical & Power Generation)
March 16, 2017 to Continue.
A renowned Oil refinary plant in Pakistan. Oil Refinery-01 35000 bpd and Oil Refinery-02 150000 bpd producing refining of crude oil into various saleable components including liquefield petroleum gas , light naphtha , heavy naphtha , high octane blending components , motor gasoline , kerosene , jet fuels , high speed diesel and furnace oil.
Job Description
Ø Induction Motors (LV and MV) Having Power Up To 400 Hp, Manufactured By
WEG(UK), ABB(USA), LOHER, MAC, GE etc.
Ø Transformer.
Siemens 100 to 5000KVA etc.
Ø Switchgears (LV and MV) Manufactured By
GE(USA), SCHNIEDER ELECTRIC(UK), ABB(USA), SIEMENS etc
Ø Air circuit breaker & Vacume circuit brekaer
Upto 4000A Make: ABB, Siemens, schneider electric etc.
Ø Carrier Electrical Chiller,Cooling Towers,Package Units,Ducting,Air Handling Units,BMS system and PLCs.
Senior Electrical Engineer (Power Generation)
December 2016, to March 2017.
A renowned cement plant in Pakistan, Lucky Cement strives to remain an efficient and low cost producer and is one of the pioneers to introduce and install Waste Heat Recovery and Refuse Derived Fuel (RDF) and Tyre Derived Fuel (TDF) Plants in Pakistan. It also has self-sufficient Captive power generation facility of 180 MW and supplies additionally generated electricity to support the National grid. Lucky Cement owns a fleet of Bulkers & Trailers, which gives added advantage in terms of logistics and efficient deliveries to all types of customers spread across the length and breadth of the countryl.
Job Description
Assistant Manager E&I. September 21, 2007 to December 28, 2016
A renowned petrochemical plant in Pakistan, which is the only 900 T/Day producing bottle grade pet chips (BGC) & 350 T/Day producing textile grade pet chips (TGC) in Pakistan
I joined Novatex as a Trainee Engineer E&I and progressively moved to Assistant Manager E&I.
Job Description
Successfully handle projects.
Erection of JENBACHER JGS-420 Gas Engines
First Major erection work. Commissioning of JGS-420. (3)Jenbacher Gas Engine in December 2009.
1. Worked with consultant (ORIENT POWER ENGINEERING) in erection, pre-commissioning and commissioning phases of JGS-420 Jenbacher Gas Engines.
2. Schedule the work in accordance to the project milestones.
3. Ensuring all electrical contraction work compiled with drawings ans specifications
4. Liase with the contractor resolving all on site contractual problem. Supervise project executions, evaluate and monitor the manpower productivity.
Erection of Heat Recovery System
Second Major erection work. Commissioning of Double Effect 260 Ton (2) Absorption chillers & (2) Heaters for HTM heating in January 2012.
1. Worked with consultant (ORIENT ENGINEERING) in erection, pre-commissioning and commissioning phases of double effect (2) absorption chillers.
2. Schedule the work in accordance to the project milestones.
3. Ensuring all electrical contraction work compiled with drawings ans specifications
4. Liase with the contractor resolving all on site contractual problem. Supervise project executions, evaluate and monitor the manpower productivity
Erection of Heat Recovery System
Third Major erection work. Commissioning of Double Effect 400 Ton (1) Absorption chillers & (1) Heaters for HTM heating in April 2013.
1. These systems are design on Fatek PLC and also design Weintek HMI for operation and control of system.
2. Schedule the work in accordance to the project milestones.
3. Ensuring all electrical contraction work compiled with drawings ans specification.
4. Liase with the contractor resolving all on site contractual problem. Supervise project executions, evaluate and monitor the manpower productivity
Erection of Coal Fire Oven
Fourth Major erection work. Commissioning of Coal Fire Oven / Heater 12000kw for HTM heating in January 2014.
1. Worked with consultant CEEF from china in erection, pre-commissioning and commissioning phases of 12000kw Coal Fire HTM Oven.
2. Schedule the work in accordance to the project milestones.
3. Ensuring all electrical contraction work compiled with drawings ans specifications
4. Liase with the contractor resolving all on site contractual problem. Supervise project executions, evaluate and monitor the manpower productivity.
Erection of JENBACHER JGS-320 Gas Engines
Fifth Major erection work. Commissioning of JGS-320. (2)Jenbacher Gas Engine in December 2014.
1. Worked with consultant (ORIENT POWER ENGINEERING) in erection, pre-commissioning and commissioning phases of JGS-320 Jenbacher Gas Engines.
2. Schedule the work in accordance to the project milestones.
3. Ensuring all electrical contraction work compiled with drawings ans specifications.
4. Liase with the contractor resolving all on site contractual problem. Supervise project executions, evaluate and monitor the manpower productivity.
5. Erection of JENBACHER JGS-420 Used Gas Engines
Sixth Major erection work. Commissioning of JGS-420. (3)Jenbacher Used Gas Engine in December 2015 .
1. Worked with consultant (ORIENT POWER ENGINEERING) in erection, pre-commissioning and re-commissioning phases of JGS-420 Jenbacher Gas Engines.
2. Schedule the work in accordance to the project milestones.
3. Ensuring all electrical contraction work compiled with drawings ans specifications.
4. Liase with the contractor resolving all on site contractual problem. Supervise project executions, evaluate and monitor the manpower productivity.
Erection of 600 (TON)SSP (Solid State Polymerization) Plant
Seventh Major erection work. Commissioning of 600 (TON) SSP PLANT in april 2016.
1. Worked with consultant (CPERION from Italy & CTIEI from China) in erection, pre-commissioning and commissioning phases of Plant.
2. Installation of power and control cable tray according to design & drawing.
3. Installation & placement of MCC,DISTRIBUTION panels.
4. Termination and Cable laying job of power and control cables according to design & drawing.
Instruments installation and cables laying for instruments and calibration with consultant engineers according to design & drawing.
National Electrical Code knowledge
Listening Good music
Hanging out with family