Summary
Overview
Work History
Education
Skills
Certification
Additional Information
Timeline
Generic
Muhammad Ahsan Sami

Muhammad Ahsan Sami

Plant Manager
Karachi

Summary

Highly accomplished career spanning over 15+ years in Foods and FMCG Production, Supply Planning, Manufacturing Excellence, and Project Management. Certified JIPM TPM Instructor with multi-million dollar savings delivered through innovative strategies. World class experience with companies like Unilever, Friesland Campina, and EBM. Skilled in diverse team leadership, ERP implementations, and ensuring compliance with international quality standards. Recognized as Best Performer at EBM. Strong leadership, communication, negotiation, and analytical abilities.

Overview

16
16
years of professional experience
11
11
years of post-secondary education
3
3
Certifications
3
3
Languages

Work History

Factory Operations Manager

Araak Group
Khartoum
08.2017 - Current

Project Management: Spearheaded a 2M+ USD Greenfield Factory by taking charge of core tasks like

  • Site Selection
  • Preparation of factory layouts for civil design.
  • Equipment/machinery selection and procurement.
  • Budgeting and scheduling of the construction phase.
  • Utilities Planning, piping diagrams
  • Erection and commissioning

Odoo ERP Implementation:

  • Implemented Manufacturing, Quality and Inventory Modules of Odoo v.14 and conducted end user trainings.

Factory Operations: Led a dynamic team of 15 direct reportees and 50+ individuals for milk powder and tea production. Core activities included

  • Supply planning based on demand forecasts,
  • Production scheduling and manpower management,
  • Predictive and preventive maintenance planning,

Major Achievements:

  • Delivered an impressive 3.7% overall saving on Project Capex against the budget.
  • Created and Implemented policies and procedures manual for ISO 22000 FSSC implemenation,
  • Successfully completed Friesland Campina's rigorous pre-commissioning food safety audit for Foremost Milk Powder.
  • Achieved a remarkable 80% Overall Equipment Efficiency (OEE) within the first six months of project commissioning.
  • Maintained an exceptional 91% Output Reliability (OR).
  • Achieved 8% improvement on labor productivity on YTD basis during 1st year of operations.

Plant Manager

Ismail Industries Limited
Karachi
04.2016 - 07.2017
  • Lead complete Production and Maintenance Operations of Fried Snacks Manufacturing Factory (Potato Chips, Peanuts and Nimco) at Hub Industrial Area.
  • Managed a large and diverse team of 20 direct reportees and 500 contractual workers.

Major Achievements:

  • 10% Reduction in FOH cost per kg resulting in a YTD saving of PKR. 11.4 Mn.
  • 35% Reduction Packaging Material Wastage, reduced from 2.83% to 1.80%. Annualized cost saving of PKR 0.80 Mn.
  • 10% Improvement in Labor Productivity (Kg/Man-hrs).
  • 3% Improvement in Process Yield; increased from 24.8% to 25.7%
  • 75% Improvement in MTBF; increased from 9.72 to 17.00 hrs.
  • 35% Improvement in MTTR; decreased from 0.83 to 0.53 hrs.
  • Streamlined Annual Capacity Planning through preparation of Annual Operating Plan (AOP) and Supply Planning Schedules as per Rolling Sales Forecast (RSF) for Pre & Executive S&OP.
  • Optimized Process Parameters and improved OEE% of Packing Machines from 76% to 83% through effective use of Loss Tree Analysis and other TPM and Lean Manufacturing techniques.
  • Prepared Capital and Revenue Budget for the factory. Achieved 6% saving on Revenue budget over the target via improved Autonomous and Planned Maintenance programs.

Track Lead - PP Module for SAP Implementation

English Biscuit Manufacturers
Karachi
06.2015 - 04.2016

In addition to regular responsibilities, I led the implementation of the SAP PP module, overseeing its seamless integration with other modules. Played a key role in creating Business Process Maps, Business Blue Print Documents, Authorization Matrices, and End User Training Program. Ensured effective implementation and user readiness for enhanced operational efficiency.

Production Manager

English Biscuit Manufacturers
Karachi
01.2013 - 04.2016
  • Led end-to-end operations of Biscuit Manufacturing on 7 production lines, overseeing 30+ packing machines
  • Managed a diverse team of 18 permanent employees and over 1000 contractual workers
  • Led the Annual Capacity Planning process at the Group Level, optimizing capacity utilization from 87% to 92% over three years based on Rolling Sales Forecast (RSF)
  • Developed and implemented Supply Planning Schedules for Pre & Executive S&OP, ensuring an impressive Output Reliability Rate of 95% through effective collaboration with sales and logistics teams
  • Implemented a comprehensive system for measuring the Overall Equipment Effectiveness (OEE%) of Packing Machines, resulting in an average OEE of 83%
  • Ensured strict compliance with occupational health and safety rules, maintaining a safe working environment at the plant

Key Achievements:

  • Successfully implemented rigorous time and motion studies, leading to a 14% reduction (175 workers) in the on-roll workforce and achieving a gross annual saving of PKR 40 million
  • Optimized coding format, resulting in a significant 40% reduction in Thermal Printing cost, equivalent to a saving of PKR 20 million per annum
  • Significantly increased Labor Productivity from 17 to 21 Kg/Man-hr over a three-year period
  • Implemented effective measures to reduce Packaging Film Wastage by 15% in 2014, resulting in an annual saving of PKR 12 million
  • Achieved a remarkable 16% reduction in Finished Product Wastage
  • Successfully minimized Process Downtime by 18% over a three-year period
  • Conducted an extensive study with the Finance Department to identify and address un-traced wastage, resulting in a 25% reduction in unaccounted losses
  • Implemented Statistical Process Control (SPC) techniques, reducing giveaway (overweight product) losses to an impressive 0.2%
  • Demonstrated a significant 30% decrease in customer complaints over a three-year period.

Assistant Manager - Quality & Safety

Unilever Pakistan
Karachi/Lahore
01.2010 - 12.2012
  • Managed quality and SHE (Safety, Health, and Environment) matters at 3P sites for Detergents, Personal Products, and Tea, implementing Unilever Global Quality Standard for co-packers across all 3P units
  • Enforced strict adherence to manufacturing processes in alignment with HACCP Guidelines, Unilever OHS FWS/OHSAS 18001:2007 Compliance, and EMS FWS/ISO 14001:2004 Compliance
  • Spearheaded the implementation of the CRQS program, Quality Verification Program (QVP), and Enzyme Safety Protocol in Detergent Plants
  • Conducted comprehensive Internal/External audits of Unilever factories/offices on a nationwide basis

Major Achievements:

  • Developed and implemented a robust measurement and monitoring regime for Environmental KPIs across all 3P sites
  • Prepared system procedures for environmental aspect impact assessment and conducted training
  • Successfully completed annual quality and safety audits, ensuring the renewal of certifications by independent third-party auditors
  • Oversaw the construction of a 400 Tons/Day Detergent Manufacturing Plant, maintaining Zero Lost Time Accidents throughout the project.

Assistant Production Manager

Friesland Campina Engro Pakistan
Sukkur
07.2007 - 12.2009
  • Independently Lead Shift Operations Production Planning and Operations Management of Liquid Line (Pasteurization and UHT) and Powder Plant
  • Prepared & maintained daily report on schedule adherence and Productivity status
  • Minimized performance bottlenecks for achieving high productivity with minimum consumption of material & machine
  • Supported the adherence of HSE and Food Safety Rules Compliance

Major Achievements:

  • Successfully implemented a system for filling machines’ efficiency monitoring in 2008
  • Performed the role of Project Coordinator (Processing) for installation and commissioning of 2nd Milk Pasteurization Plant
  • Commissioning of Third Aseptic Tank (ATS) with GEA TDS in 2007
  • HPO Storage and Dosing System as Project Team Member (Process Design)

Trainee Engineer

Gatron Industries Limited
Karachi
02.2007 - 07.2007
  • Shift Incharge on UOP Sinco Solid State Polycondensation (SSP) Plant for PET resin up-gradation.
  • Traveled to job sites with senior personnel to aid in inspections and ongoing project observations.
  • Interpreted blueprints and technical drawings to analyze upcoming projects.
  • Maintained contemporary technical knowledge of engineering concepts.
  • Constant Plant Monitoring through Delta V DCS.
  • Production Plan Execution
  • Trouble shooting and Trends’ study of key controllers.
  • Exposure to Zimmer GmbH Polycondensation (POLYCON) plant for PET resin manufacturing.

Education

Bachelor of Chemical Tech/Engg - Chemical Process Industries

University of Karachi
Karachi, Pakistan
04.2003 - 05.2006

MBA - Supply Chain & Finance

Institute of Business Administration
Karachi, Pakistan
04.2015 - Current

Skills

TPM/Lean Manufacturing

undefined

Certification

TPM Lead Instructor

Additional Information

Scored 8.0 Bands in IELTS Academic Track.

Arabic Language (Basic Level) course with Excellent grade from Open University of Sudan.

Timeline

Factory Operations Manager

Araak Group
08.2017 - Current

Plant Manager

Ismail Industries Limited
04.2016 - 07.2017

Track Lead - PP Module for SAP Implementation

English Biscuit Manufacturers
06.2015 - 04.2016

MBA - Supply Chain & Finance

Institute of Business Administration
04.2015 - Current

Production Manager

English Biscuit Manufacturers
01.2013 - 04.2016

ISO 14001/Unilever ECS Lead Auditor

12-2010

TPM Lead Instructor

07-2010

OHSAS 18001/Unilever FWS Lead Auditor

02-2010

Assistant Manager - Quality & Safety

Unilever Pakistan
01.2010 - 12.2012

Assistant Production Manager

Friesland Campina Engro Pakistan
07.2007 - 12.2009

Trainee Engineer

Gatron Industries Limited
02.2007 - 07.2007

Bachelor of Chemical Tech/Engg - Chemical Process Industries

University of Karachi
04.2003 - 05.2006
Muhammad Ahsan SamiPlant Manager