Dedicated civil engineering professional with history of meeting company goals utilizing consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.
Overview
3
3
years of professional experience
8
8
years of post-secondary education
3
3
Languages
Work History
Officer Commanding
756 CTE, Frontier Works Organization (FWO)
Multan - Pindi Bhattian Motorway M-4
11.2022 - Current
Ensure overall smooth operations of Motorway M-4 which include management of manpower, cash collection and deposit, security of motorway assets, tolling operations and Emergency Rescue and Recovery Services (ER&RS).
Reduce workflow inconsistencies by recruiting and hiring capable staff and by implementing policies, protocols, work rules and disciplinary action.
Ensure preventive maintenance, rehabilitation, safety and security of motorway assets.
Resolve problems, improve operations and ensure maximum generation of revenue and control on embezzlement activities.
Prepare variety of different written correspondence, daily reports and returns regarding tolling operations, maintenance, occurrences and liaison with local and state regulatory agencies to streamline operations of Motorway M-4.
Monitor ER&RS on the Motorway M-4 that include mobile workshops, ambulances, recovery vehicles and fire tenders.
Project Officer
756 CTE, Frontier Works Organization (FWO)
Construction of Approach Roads alongwith Guide Banks of Sheikh Khalifa Bridge, Rahimyar Khan
11.2021 - 11.2022
Adjusted project plans to account for dynamic targets, staffing changes and operational specifications.
Coordinated closely with client (Punjab Highway Division) and Consultant (NESPAK) in order to identify and quickly address problems.
Evaluated and solved technical problems arising routinely or spontaneously and affecting project deliverables.
Reported regularly to managers on project timelines, progress and technical problems.
Monitored deadlines and milestones to keep team on track with project schedule.
Administered and conducted visit of VIPs including DG FWO, twice.
Scheduled and facilitated meetings between project stakeholders to discuss deliverables, schedules and conflicts.
Sourced, vetted and managed contractors needed to accomplish project goals.
Monitored execution of contract work for compliance with design plans and specifications.
Tracked delivery of construction materials i.e. Soil, Spawl, Sub Base, Water Bound Macadam and Pitching stone from contractors.
Supervised and monitored daily tasks of various subcontractors incl SPARCO.
Analyzed impact of environmental disasters such as recent floods of 2022 on the road structure and create and implement response plans.
Officer Commanding
756 CTE, Frontier Works Organization (FWO)
Sukkur - Multan Motorway M-5
06.2021 - 11.2021
Ensured overall smooth operations of Motorway M-5 which included management and administration of manpower, cash collection and deposit, security of motorway assets and tolling operations.
Reduced workflow inconsistencies by recruiting and hiring capable staff and by implementing policies, protocols, work rules and disciplinary action.
Ensured preventive maintenance, rehabilitation, safety and security of motorway assets.
Resolved problems, improved operations and ensured maximum generation of revenue and control on embezzlement activities.
Prepared variety of different written correspondence, daily reports and returns regarding tolling operations, maintenance, occurrences in close coordination with NHA and NHMP to streamline operations of Motorway M-5.
Implemented transition of tolling operations from manual entry system to Intelligent Transport System (ITS) and magnetic cards and then further administered it.
Operations, Maintenance and Management Officer
756 CTE, Frontier Works Organization (FWO)
Karachi - Hyderabad Motorway M - 9
04.2020 - 06.2021
Ensured overall smooth operations of Motorway M-9 which included management of manpower, cash collection and deposit, security of motorway assets, tolling operations and Emergency Rescue and Recovery Services (ER&RS) on Hubsari - Hyderabad section of the motorway.
Installation of approximately 30 kilometers of missing fencing along the motorway ROW, with limited manpower and resources, was accomplished within a timeframe of 2 months. This was a significant accomplishment, given the constraints and challenges posed by the availability of resources.
As Horticulture officer, Implemented a comprehensive plan for the cultivation and upkeep of 120,000 shady plants along the motorway ROW as part of Sar Sabz o Shadab Pakistan (SOS) and Green Pakistan Initiative Campaigns,. The endeavor was particularly challenging due to the prevalent water scarcity, high levels of total dissolved solids in the water, adverse weather conditions, and unfavorable soil characteristics in the designated area
Prepared variety of different written correspondence, daily reports and returns regarding tolling operations, maintenance, occurrences, misappropriations and liaison with local and state regulatory authorities to streamline operations of Motorway M-9.
Grounding/ Earthing of all Toll Plazas on Motorway M-9.
Installation and Operations of CCTV cameras alongwith microphones at all Toll Plazas on M-9 in order to minimize embezzlement cases and scuffles with commuters.
Trainee Engineer
Military Engineering Services (MES)
Risalpur Cantt
07.2018 - 09.2018
Interpreted blueprints and technical drawings to analyze upcoming projects.
Traveled to job sites with senior personnel to aid in inspections and ongoing project observations.
Maintained contemporary technical knowledge of engineering concepts.
Trainee Engineer
121 QCB, Frontier Works Organization (FWO)
Swat Expressway Babuzai
06.2017 - 08.2017
Traveled to job sites with senior personnel to aid in inspections and ongoing project observations.
Maintained contemporary technical knowledge of engineering concepts.
Worked closely with engineers and assisted with soil testing.
Tested soils and materials to determine embankment strength.
Education
Bachelor of Engineering - Civil Engineering
Military College of Engineering, MCE (NUST)
Risalpur Cantt
10.2015 - 07.2019
Intermediate - Engineering (Pre-Engineering)
Army Public School And College System
Risalpur Cantt
06.2013 - 08.2015
Matriculation - Science
Army Public School And College System
Risalpur Cantt
04.2010 - 06.2012
Skills
Interpersonal Skills
undefined
Accomplishments
As Officer Incharge of 50x individuals, completed 1x month training of the newly inducted Power Pontoon Bridge on River Ravi at Abdul Hakim.
Software
MS Office
AutoCAD/ Architecture
Primavera
ArcGIS
Interests
Reading about technology
Self Learning
Android Modifications
Timeline
Officer Commanding
756 CTE, Frontier Works Organization (FWO)
11.2022 - Current
Project Officer
756 CTE, Frontier Works Organization (FWO)
11.2021 - 11.2022
Officer Commanding
756 CTE, Frontier Works Organization (FWO)
06.2021 - 11.2021
Operations, Maintenance and Management Officer
756 CTE, Frontier Works Organization (FWO)
04.2020 - 06.2021
Trainee Engineer
Military Engineering Services (MES)
07.2018 - 09.2018
Trainee Engineer
121 QCB, Frontier Works Organization (FWO)
06.2017 - 08.2017
Bachelor of Engineering - Civil Engineering
Military College of Engineering, MCE (NUST)
10.2015 - 07.2019
Intermediate - Engineering (Pre-Engineering)
Army Public School And College System
06.2013 - 08.2015
Matriculation - Science
Army Public School And College System
04.2010 - 06.2012
Similar Profiles
Ali AjazAli Ajaz
Safety Officer at FWO ( FRONTIER WORKS ORGANIZATION)Safety Officer at FWO ( FRONTIER WORKS ORGANIZATION)