Summary
Overview
Work History
Education
Skills
Interests
Timeline
Generic
Khawar Saeed

Khawar Saeed

Lake City, Lahore,PB

Summary

ENGINEERING INNOVATION Seeking new challenging job which is parallel to my professional experience and abilities is one of the keys of the company’s vision into realization through strong dedication, hard work and good leadership skills to enable the organization to deliver strategic new initiatives on time, within budget and scope. Make new learning curve to move in linear fashion along with growth of my functional skills coupled with overall personality development to face the challenging time ahead.

Overview

15
15
years of professional experience
1
1
Language

Work History

Project Manager

SAADE Construction
Ulaanabatar , Mongolia
12.2021 - 05.2023
  • (Total 14 Years on going Experience, SURFACE FUEL FACILITY & Structure, MHS2 Conveyor Installation Project

Diamond Paint Ltd, Soya
  • Bean Oil Tanks & Piping

M/S Renacon (Pharmaceutical) Pvt. Ltd
  • Supply & Installation of SS Tanks along with Skids & Mobile Screw Conveyor
  • Client, Project: PC50/PC32 Up-gradation & shutdown works

United Detergents
  • (Unilever Pakistan)
  • Project: Plant Various up-gradation including tower detergent works

Engineering Kinetics (Pvt) Ltd
  • DDFC group)
  • Project employs qualified & highly experienced personnel at all levels capable of organizing, executing & handling of all kind of mechanical construction projects from start to completion
  • The project team consists of supervisors, foreman, pipe fabricators & fitters, welders, general fitters, riggers, millwrights, electricians, mechanics, insulators, painters & the site support groups
  • The project support group consisting of human resource, planning, procurement & material handling departments managed by a team of professionally trained personnel & constantly provides the needed assistance to the project team.

Tariq Float Glass Industries Ltd, Toyo Nasic (PVT) Limited
  • Pakistan’s Biggest Float Glass Plant {A Project of Tariq Float Glass Group of Company} Fully automatic through DCS control system Having Capacity of 550 Ton/day
  • Activities are being planned to start fabrication, erection, installation, commissioning, and maintenance of plant.

Qinhuangdao Yaohua Glass Machine Manufacture, Millat Tractor (Pvt) Ltd
Lahore

Project Manager

Rio Tinto Copper & Gold Mine, Matrix Engineering (Pvt) Ltd, Colgate Palmolive (Pakistan) Ltd
01.2022 - 05.2023
  • Client: Procter & Gamble
  • Project: Fire Water Tank

RESUME 4
01.2022 - 05.2023
  • With following responsibilities Project Management Project Planning Contract & Cost analyze Commercial Invoices Project Cost Control Execution of Project Estimation of material Commercial proposal Contractor Coordination

Manager Projects

Engineering KineticsLimited, EKL
02.2020 - 12.2021
  • Project: MFM MOGAS Phase-2 PARCO

Manager Projects

Matrix Engineering (Pvt.) Ltd
02.2020 - 12.2020
  • I am rendering my services as, Today Matrix Engineering is the well-recognized as Composite Engineering Solution Provider in all sectors of industry
  • The company has emerged with the concept of one window operations approach in a very short span
  • Major Responsibilities are as following Project Execution Project, 5
  • Contractor Coordination Cost Analysis

Project Manager

AJGroup of Companies
01.2018 - 02.2020

Project Manager

Engineering Kinetics (Pvt) Ltd, Building Construction
01.2018 - 02.2020
  • I am rendering my services as, at PARCO Project
  • EPC Project is Joint Venture with China petroleum pipeline (CPPB) Since from, 1
  • Construction of tank Foundations 05 Nos
  • (Dia 42 Mtr.) Piping Sleepers and
  • Fabrication and Erection of tanks 05 Nos
  • (Dia
  • 42 Mtr) Fabrication and Erection of Piping Installation of Equipment’s

Manager Projects

Engineering Kinetics Limited, EKL
11.2016 - 12.2017
  • Project: Coal Fire Power Plant Project, (CFPP); 26 MW

Manager Projects

AJ, AJ Corporation
11.2016 - 12.2017
  • With the following responsibilities Management of the projects Execution activities Cost Controlling of the projects Preparation of dossier of the projects
  • Area of Concerns: Fabrication and erection of Stainless Steel & MS Tanks ( Nos
  • 10) Erection of Stainless steel & MS Piping
  • Equipment’s installation

Site Manager

Ibrahim Fiber Limited, Engineering KineticsLimited, EKL, Hi Tech Blending Plant Ltd
07.2016 - 10.2017

Site Manager

Ibrahim Fibers Limited, CCFP, Ibrahim Fiber Coal fired
07.2016 - 10.2016
  • With the following responsibilities i
  • Erection of Pre-Fabricator structure of Boiler ii
  • Water walls membrane fabrication and welding iii
  • Installation of rotary & stationary Equipment iv
  • Fabrication of transfer tower structure v
  • Fabrication of De-Dust duct vi
  • Fabrication of piping for cooling tower, HP Steam, Extraction Steam Etc
  • Vii
  • Assembling & Installation of Coal feeding conveyor viii
  • Installation of Compressors ix
  • Installation of turbine with gear box and generator
  • Hi Tech, Blending Plant (Zic Oil) I rendered my services as Site Manager at Hi Tech Project (ZIC Oil) Since from

Site Manager

Saade, International Halal Meat Plant Exporter Mongolia
06.2015 - 07.2016

Mechanical engineer

SAADE Group Ltd
06.2015 - 07.2016
  • With following responsibilitiesOverall monitoring of project activitiesFabrication and erection of Tanks (24 Nos.)Prepared the Plant layout before commencing of civil worksMonitoring all civil works including foundations of sheds, pumps and panels etc.Prepared the Plant piping General arrangement drawings with DesignerPrepared the Tanks drawings with designerMonitor and ensure the piping execution according to the designMonitor and ensure the tanks fabrication and erection according to the designMonitor the pipe testing likewise hydro test, pneumatic with 3rd party coordination Monitor the tanks testing likewise Vacuum, MPI, hydro test with 3rd party coordination Ensure the insulation work of tanks and piping Monitor the paint work of tanks and piping Monitor of sheds fabrication and erection Monitor Shed sheeting erection as per design
  • RESUME 6 Commissioning of pumps, compressor etc
  • Commissioning of Pipelines and tanks Good Coordination in between company executive, contractors and 3rd party Prepared the plant progressive on the bases of daily, weekly, and monthly and reported to BOD Checked the Direct/ Indirect material specs as per code and procured from market, Concern with construction in Mongolia), with solid expertise in the project planning, project cost, project scheduling, project execution, implementation, and demonstration of innovative mechanical engineering
  • Highly experienced in the area fabrication, erection, and installation of all kinds of the equipment’s
  • Ability to apply general principles of engineering to provide the technically feasible solutions for complex engineering problems
  • Obtaining tender documents, tender drawings, supplier quotations and prepare cost estimation budget on award of projects
  • Prepare list of materials/drawing submittals and maintain track of approvals
  • Preparation of programmers of work in coordination with project managers based on the bill of quantities and develops a plan of action with the nursery, workshop, warehouse, logistics and purchase department
  • Follow up with the suppliers for timely delivery of supplies
  • Maintain a daily report of on list activities and presenting it to the head office
  • Forwarding of requests to account department for approval of various bonds
  • Maintaining time sheets of individual group of companies and time allocation sheets of PMs and supervisors.1 Renovation of international Halal Meat Plant Exporter (Slaughter House) Mongolia

Project Manager

Saade Group of Companies
07.2014 - 04.2015
  • Project: Extraction of Gold

Project Manager

SAADE Construction LLC, Bur Undor
07.2014 - 04.2015
  • Water Storage tanks fabrication and installation Renovation of the All Meat Plant
  • Patch up and Epoxy paint works
  • Construction of Lair age Installation of Equipment’s Installation of Boiler Installation of Effluent water treatment plant Installation of Compressors Installation of Chiller room Equipment Installation Fire/safety alarms and extinguisher

Project Manager

Bayan Airag Gold Mining exploration Mongolia, Tariq Glass Industries Ltd
08.2013 - 06.2014

Project Engineer

Bayan Airag Gold Mining exploration LLC, SAADE Construction LLC
08.2013 - 06.2014
  • Fabrication and Installation of Water Tanks
  • Fabrication and Installation of All plant pipelines
  • Fabrication and Installation of SS pipelines
  • Fabrication and Installation of Galvanized pipelines
  • Hydro and pneumatic test of all pipelines
  • Vacuum test of the Tanks Hydro test of the tanks
  • Radio Grapy test of the tanks.

Project Engineer

Float GlassSheikhpura
11.2011 - 06.2013

Project Engineer

Tariq Float Glass Industries
11.2011 - 06.2013
  • With the following responsibility, Fabrication of tanks, piping and steel structure Erection of tanks, piping and Steel Structure Installation, Commissioning of Equipment’s Calculate the bill of material (BOM) Costing of the material
  • Job, 1
  • Plant Piping fabrication and installation Fabrication and erection of air ducts Fabrication and installation of belt conveyors Erection of steel structure of furnace (550 T/day) Installation of cooling tower Installation of pumps for pump house Installation of all type compressor Commissioning and maintenance of compressors/pumps Maintenance of Gear Box Maintenance of Compressors (i.e
  • Screw & piston type) Maintenance of Pumps
  • (i.e
  • Centrifugal, screw, gear) Maintenance of Blowers
  • RESUME 9 Maintenance of Bucket Elevators
  • Maintenance of Conveyors
  • Maintenance of Cooling towers Manage staff & manpower coordinating
  • Preparing the concerning data & reports
  • I have worked experience and also recommended by.

Assistant Manager

Millat Tractor Pvt Ltd
11.2008 - 10.2011
  • I am rendering my services as Project Manager with SAADE Construction since from

Assistant Manager

Matchless Engineering (Pvt) Ltd
Lahore
11.2008 - 10.2011
  • With the following responsibilities
  • Working experience in
  • Production
  • Production
  • Planning
  • Quality parameter
  • Have some experience of work with Home Based workersHave knowledge of cutting tools
  • Key Duties:
  • Deal with automotive parts
  • Overall production
  • Production department Responsible for the alignment of demands and production plans tosatisfy customer requirements
  • Maintain Quality control
  • To maintain reports and record keeping of all work in process and finished products
  • Planning, directing, controlling, coordinating, and evaluating all or most inventory planning andcontrol activities (e.g
  • Master scheduling, stocking, inventory, materials handling and forecasting)
  • Calibrate jig fixture and inspection instruments `
  • Maintain control over raw material
  • Preparation of daily floor position report
  • Daily production report
  • Final stock report
  • RESUME 1 0

Education

Bachelor of Science - Mechanical Engineering

University of Engineering and Technology Taxila
01.2004 - 1 2008

Skills

2 Good Leadership skillsundefined

Interests

New Challenges and Achievements for a New Goals

Timeline

Project Manager

Rio Tinto Copper & Gold Mine, Matrix Engineering (Pvt) Ltd, Colgate Palmolive (Pakistan) Ltd
01.2022 - 05.2023

RESUME 4
01.2022 - 05.2023

Project Manager

SAADE Construction
12.2021 - 05.2023

Manager Projects

Engineering KineticsLimited, EKL
02.2020 - 12.2021

Manager Projects

Matrix Engineering (Pvt.) Ltd
02.2020 - 12.2020

Project Manager

AJGroup of Companies
01.2018 - 02.2020

Project Manager

Engineering Kinetics (Pvt) Ltd, Building Construction
01.2018 - 02.2020

Manager Projects

Engineering Kinetics Limited, EKL
11.2016 - 12.2017

Manager Projects

AJ, AJ Corporation
11.2016 - 12.2017

Site Manager

Ibrahim Fiber Limited, Engineering KineticsLimited, EKL, Hi Tech Blending Plant Ltd
07.2016 - 10.2017

Site Manager

Ibrahim Fibers Limited, CCFP, Ibrahim Fiber Coal fired
07.2016 - 10.2016

Site Manager

Saade, International Halal Meat Plant Exporter Mongolia
06.2015 - 07.2016

Mechanical engineer

SAADE Group Ltd
06.2015 - 07.2016

Project Manager

Saade Group of Companies
07.2014 - 04.2015

Project Manager

SAADE Construction LLC, Bur Undor
07.2014 - 04.2015

Project Manager

Bayan Airag Gold Mining exploration Mongolia, Tariq Glass Industries Ltd
08.2013 - 06.2014

Project Engineer

Bayan Airag Gold Mining exploration LLC, SAADE Construction LLC
08.2013 - 06.2014

Project Engineer

Float GlassSheikhpura
11.2011 - 06.2013

Project Engineer

Tariq Float Glass Industries
11.2011 - 06.2013

Assistant Manager

Millat Tractor Pvt Ltd
11.2008 - 10.2011

Assistant Manager

Matchless Engineering (Pvt) Ltd
11.2008 - 10.2011

Bachelor of Science - Mechanical Engineering

University of Engineering and Technology Taxila
01.2004 - 1 2008

Diamond Paint Ltd, Soya

M/S Renacon (Pharmaceutical) Pvt. Ltd

United Detergents

Engineering Kinetics (Pvt) Ltd

Tariq Float Glass Industries Ltd, Toyo Nasic (PVT) Limited

Qinhuangdao Yaohua Glass Machine Manufacture, Millat Tractor (Pvt) Ltd
Khawar Saeed