Technical Team Lead with substantial experience in Deployment, Maintenance & Support of 2G/3G/4G/5G Networks, with practical approach towards evaluating Technical & Managerial problems & determine efficient solutions. Sound track record of eight years proactive engineering practice and leadership in implementation of Telecommunication Network Projects. Primarily focused on ensuring that assigned tasks are meticulously planned & executed to facilitate the achievement, requirements & deadlines. Highly flexible and adaptable performer; adept at multi-tasking and thriving in a fast-paced environment while coordinating numerous time-sensitive projects. Effective team player with exceptional interpersonal skills.
Team management and responsible for the overall operation of the QEHS team.
Monthly and Daily Roster preparation and resource management as per workload requirements
WO Report Preparation at the end of month that include QEHS task count as per each project for cost claim
Review and hand over the quality standards of the rep offices, review and determine the project quality FTR baseline of the rep office, officially hand over the quality standards of new projects to the QC Reviewer team
Support Rep Office or Project Team to achieve the ≤95% EHS and QC FTR Rate through analysis & training to the Supplier teams
Working on data write back on SIMSSpace and maintain the Quality Audit Rate more than 98% for TSSR preparation.
Saudi all KAD’s EHS, QC (1.0 & 2.0) and QA and PAT templates preparation and configuration
Artificial Intelligence (AI) implementation on EHS and QC templates for auto approvers
Working on ISDP Smart QC, Rollout and Work Order, Power BI Dashboard SIMS Space and SCM
Project, access and other required system rights applied for whole team for their smooth work and delivery.
Training session given to reviewer and Supplier teams about EHS and QC Installation Sops
Remote Automation and Tagging for Report Generation
EHS QC QA Task Creation and EHS QC QA Task Checking
Strive to maintain the Timely review rate ≤ 98%
Trained newcomers and internees that joined the team
5G AAU 5639 and 5G AAU5636 Installation, commissioning and configuration
L700, L900, GU900, L1800, L2100, L2300, L2600 Installation, commissioning and configuration
Fault Tracing and rectification (VSWR, RTWP, Cell coverage, Cell quality)
Carrier expansion
15 Band Antenna, Panta, Octa, Hepta Band Antenna Installation
Complete FTK site installation and integration.
2G 3G and LTE BBU Visibility.
Huawei rectifier swap (TP48200B, TP48400B, and TP48600B).
Pre-pat and PAT with zero snag.
QC closure with FTR.
MW Installation and Configuration (1.2m, XPIC, SD)
Responsibilities include management & technical support for field operations. Supervising & coordinating with supplier technical & managerial staff for smooth flow of activities performed in field. Engaged with customer for ongoing activities, on site installation, commissioning, troubleshooting & site acceptance.
Responsible for coordination, Planning, managing & execution of activities. Providing technical & managerial support to ordinates.
Installation and commissioning of Huawei BTS 3900, 3900A
Installation of Power Rack (rectifier Cabinet and Battery Bank)
2G, 3G, 4G Rollout, E1 patching and Neteco Visibility
Installation of new antennas and dismantling and Shifting of Antennas to given Height
Indoor to Indoor swap, Indoor to Outdoor swap, Outdoor to Outdoor swap.
BTS Swap, Power Swap, Feeder to RRU Swap.
Laying CPRI Cables
Cutover in given time frame
Cut-over and alarm patching, Monitoring and clearing of indoor-outdoor sites Alarms with the help of BTSM software & verified all external alarms on BTS and OMCR.
PING test and integration. BBU integration
Familiar with any hardware and software troubleshooting
Troubleshooting of different issue, i.e. RTWP, VSWR, power issue, radio link failure, CPRI degraded alarm etc
Snag rectification
TRx Expansions
Antenna Expansion and Sector Addition
Responsible for conducting surveys
LOS Survey, RF Survey, Power Survey, Civil Survey
Following quality standards & preparing site for Acceptance Test Procedure (ATP)
Conducted ATP with zero Snag
Dismantling, packing and reverse transportation of equipment to warehouse
Preparation of Quality audit reports and technical reports
DN Verification, Site sign and site verify by using ISDP
LEQ, BEQ verification
Commissioning of UBBP (d2) by using WDT
Complete knowledge About Huawei EHS and QA QC Standards
Coordination with Customer and on site Teams and Train the teams about Huawei quality standards.
Updating weekly progress and reporting to higher management.
LMT
Registered with Pakistan Engineering council as Electronics Engineer reg no Electro/27208