Summary
Overview
Work History
Education
Skills
Software
Work Availability
Quote
Timeline
Generic
INTESAR AHMAD

INTESAR AHMAD

ELECTRICAL MAINTENANCE TECHNICIAN

Summary

Attentive Electrical Foreman with 12 years of experience in Maintenance electrical systems installation and expertise in Cement manufacturing industry. Proven leader dedicated to high-quality work outcomes and safe operating practices.

Overview

11
11
years of professional experience
4
4
years of post-secondary education
3
3
Languages

Work History

Executive Officer(Supervisor)

Fauji cement Company limited
Nowshera
10.2011 - Current
  • Coordinated electrical system maintenance and repair with other departments.
  • Supervised and evaluated installation and repair of lights and power in buildings and facilities.
  • Organized ongoing maintenance schedules to boost system performance.
  • Contributed to development, implementation and execution of maintenance programs.
  • Monitored equipment, tools and system upgrades to compile data into detailed reports for upper management.
  • Monitored safety compliance to maintain strict standards and protect team members from harm.

Experience in Detail

  • Asynchronous Motors 6 KV & 6.3KV

I. Cleaning of Slip Rings & carbon brushes

II. Plan greasing

III. Condition Monitoring test

IV. Maintenance of Liquid starter

V. Maintenance of VCB(Vacuum Circuit Breaker)

  • Induction Motors

I. Greasing

II. Bearing replacement

III. Condition monitoring up to 30 K.W (vibration/Temperature)

IV. Testing (Insulation Resistance)

  • Step-down transformers 6KV~6.3KV/440 VAC

I. Periodic Silica gel replacement

II. Visual inspection (oil level & Body Temperature)

III. Cleaning of bushes & Transformer body

IV. Maintain Oil level

  • Protection Relays (REF 615, RET 615 & REM 615) ABB

I. Current Protection

II. Voltage Protection

III. Frequency Protection

IV. Differential Protection

V. Other Protection & Control

  • Direct online starters, star-delta starters, soft starters.

I. Cleaning of Magnetic contactors

II. Cleaning of Panel

III. Power Connection tightness

  • VVVF drives (ACS 880 ABB)

I. Periodic Maintenance of drives

II. Installation and parameters configuration

III. Troubleshooting

  • Motor control cabinets (MCC)

I. Cleaning of MCC

II. Connection tightness

III. Replacement of wear components (Breaker, Magnetic contactor & overload relay)

  • Power factor improvement panel (capacitor banks) three phase

I. Cleaning of Panel

II. Replacement of blew fuses

III. Replacement of damaged capacitors

IV. P.f controller setting

  • Battery Bank & Battery Charger/UPS

I. Cleaning of batteries charger

II. Periodic Monitoring of batteries output

III. Replacement of batteries

  • PLC (SIEMENS, ABB & WAGO)

I. Troubleshooting of PLC malfunction

  • Packing machines and Automation

I. Installation of FR & pressure gauges

II. Installation & & Troubleshooting of auto-drainer

III. Maintenance of pneumatic cylinders(Single acting, Double acting)

  • Maintenance of pneumatic valves

I. Two way-Two position valve

II. Three way-two position valve

III. Four way-Two position valve

IV. Spring off set pneumatic valve

  • Cement Roto-Packers (Haver & Boecker) Calibration/Configuration

I. Calibration of load cell (Bag chair)

II. Calibration of weighing conveyor (WIPOTEC)

III. Calibration of 45 ton Cement Material Bin(SCHENCK)

IV. Tuning & configuration of Digital electro-pneumatic Positioner (Type 8791)

V. Tuning & configuration of Motorized & Pneumatic Actuators(German & Chinese)

  • Technical Skill of using power tools & Testers

I. DVM, Amp Meter

II. Insulation resistance tester (Megger 250 ~1000 v)

III. Infrared thermometer (SKF TKLT 40)

IV. Vibro-pen SKF CMAS 100SL

V. Stethoscope TKST 11 (SKF)

Education

Bachelor of Science - Electrical Engineering

Preston University Kohat, Islamabad Campus
Islamabad
07.2008 - 11.2012

Skills

    Problem-Solving

undefined

Software

SAP

EMS(Employee Management System)

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Quote

Always hopeful

Timeline

Executive Officer(Supervisor)

Fauji cement Company limited
10.2011 - Current

Bachelor of Science - Electrical Engineering

Preston University Kohat, Islamabad Campus
07.2008 - 11.2012
INTESAR AHMADELECTRICAL MAINTENANCE TECHNICIAN