Summary
Overview
Work History
Education
Skills
Affiliations
Software
Certification
Timeline
Hobbies-Table Tennis
Generic

Imran Ahmed

LEAD PROJECT CONTROLS
Karachi-Pakistan

Summary

Passionate professional having 23 years of experience, having engaged with end-to-end phases of 4-large scale (total value ~ 2 billion USD) grass root projects ranging from heavy mechanical industry to petrochemical plant and biggest refinery of Pakistan.

Associated with project controls to field execution. Carry more than 20-years of hands on experience of using Oracle Primavera suite to drive proven schemes. Also intend to get engaged in 5D works by correlating my experience of Cleopatra, Primavera and 3D modeling.

Overview

23
23
years of professional experience
5
5
years of post-secondary education
2
2
Certificates
2
2
Languages

Work History

General Manager (Projects)

Cnergyico Pk Limited
2022.01 - Current
  • Reorganized Projects department and currently leading a team of 65 project team members through 5 senior managers of detailed engineering design, Integrity, Construction, Refurbishment and Project Controls. Report directly to GCEO,
  • Responsible from DED to projects delivery, selecting & managing contractors, their performance, construction safety and statutory compliance, supporting refinery in MOCs' implementation,
  • Currently heading Upgrade-1 program of refinery, along with SPM,
  • Provided strategic oversight by introducing low cost scheme of used 2x9 MW HFO based power plant yielding an annual saving of 0.9 Mn USD/month,
  • Recently took over a lead on an international project of procuring CCR via channel international, NZ,
  • Formulated numerous procedures to streamline Projects' functions in line with PSM protocol.

Senior Manager-Project Controls

Byco Petroleum Pakistan Limited
2015.10 - 2021.12

Collaborated with execution department to lead following jobs while putting in innovations.

  • 2017-2018: refurbishment of (Ø70x14H Mtr) of crude oil storage tank (Duration: 5-Month).
  • 2015-2017: refurbishment of 12 Effluent Combined Feed Exchangers' (CFEs) of Platformer,
  • 2015-2017: deconstruction (of Amec FW Furnace) & reconstruction works of 22 Mn USD (6-Months | Modularization Approach) CDU furnace from BIH-UK and multiple MOCs for refinery.
  • 2019-2021: Conducted RCA and provided solutions for the most bad actors of refinery, contributing savings and claims to 4.5 Billion USD ,

Foreign Assignment as Lead Project Controls

CAI-Murco Refinery
Milford Haven
2015.07 - 2019.12
  • Functioned as key interface for performance & contract management of M/S Puma, M/S ABB and M/S WRD for Deconstruction, Haulage and Shipment phases,
  • Developed master schedule. (Units wise | Total 14 units of DHDS and FCCU streams)-3000 activities,

Manager (Technical)

Byco Oil Pakistan Limited
2010.03 - 2015.10
  • EPPC of 120 kbpd refinery's installation involving refurbishment, procurement, fabrication, reconstruction works at MKS-Pakistan | 4-Years | 1100 Mn USD ,

Senior Engineer-Project Controls

Engro Polymer & Chemicals Ltd
2007.06 - 2010.03
  • Worked with Chinese Principal Contractor “CNCEC-7” as main Lead-Project Controls from owner's side, 30-Months | 360 Mn USD ,
  • Developed construction packages and overall site master schedule of 1500 activities with S-Curves,
  • EPCC of PVC-II, Chlor Alkali, CCPP and used EDC/VCM plant brought from Baton Rouge-USA,
  • Acted as EPCL's key interface for Project Health Audits by M/S Stone & Webster-UK and M/S Constantin Singapore throughout construction phase.

Deputy Manager-Planning

Tuwairqi Steel Mills Limited
2006.11 - 2007.05
  • Worked with MIDREX USA as planning engineer for the construction DRI unit,
  • Single handedly 5000 activities | 30-months | 300 Mn USD .

Manager-Mechanical

Lucky Cement Limited
2004.11 - 2006.11

Engaged in EPCC phases of 2x4500 tpd plants | 18-months | 200 Mn USD .

  • Participated in local fabrication, LLIs, site electro-mechanical construction in record 18-months ,

Assistant Manager-Mechanical

Attock Cement Pakistan Limited
2000.03 - 2004.11
  • Involved in EPPC of coal plant, replacement of mills' trunnions, gearboxes & kiln tires
  • Actively contributed in preparatory works to earn ISO-9001 certification for ACPL in 2003 in first go.

Trainee Engineer

Attock Cement Pakistan Limited
2000.03 - 2001.10
  • Deputed in 3 main sections of the complex at feedstock, pyro-processing and at finish milling.

Education

Master of Science - Project Management

Bahria University
Karachi
2015.06 - 2016.12

BE - Mechanical Engineering

National University of Sciences & Technology-NUST
PNS Jauhar, Karachi
1995.01 - 1998.12

Skills

Cost Estimation & Control

undefined

Affiliations

Active Member of:

Project Management Institute (PMI)-USA.

Association of Advancement in Cost Engineering-International (AACEI).

Pakistan Engineering Council (PEC).

Software

Primavera P6 Professional

Cleopatra Enterprise 6.5

AutoCAD

MS Office

MS Project

Certification

PMP

Timeline

General Manager (Projects)

Cnergyico Pk Limited
2022.01 - Current

Senior Manager-Project Controls

Byco Petroleum Pakistan Limited
2015.10 - 2021.12

Foreign Assignment as Lead Project Controls

CAI-Murco Refinery
2015.07 - 2019.12

Master of Science - Project Management

Bahria University
2015.06 - 2016.12

PMI-RMP

2011-10

PMP

2010-10

Manager (Technical)

Byco Oil Pakistan Limited
2010.03 - 2015.10

Senior Engineer-Project Controls

Engro Polymer & Chemicals Ltd
2007.06 - 2010.03

Deputy Manager-Planning

Tuwairqi Steel Mills Limited
2006.11 - 2007.05

Manager-Mechanical

Lucky Cement Limited
2004.11 - 2006.11

Assistant Manager-Mechanical

Attock Cement Pakistan Limited
2000.03 - 2004.11

Trainee Engineer

Attock Cement Pakistan Limited
2000.03 - 2001.10

BE - Mechanical Engineering

National University of Sciences & Technology-NUST
1995.01 - 1998.12

Hobbies-Table Tennis

I play at evening and over the week ends. I'm very passionate about selecting the quality hardware of table and that's why built on my own for my home.

Imran AhmedLEAD PROJECT CONTROLS