Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Hafiz Muhammad Munir Nasir

Mailing

Summary

Lahore Cantt (Pakistan). Permanent Address Vill & Post Office Jatri Kohna Distt Sheikhupura SUMMARY I am a leading engineering consultant and contracts manager who is experienced in all aspects of the design, procurement and delivery of many high profile contracts. Mainly involved in Contracts Administration ,Pre-Bid conference Meeting, Pay Estimates, Variation/Change Orders, Claims, Dispute Resolution, Submittals & Sub-Contractor Management & Documentation .I have successfully completed many projects across Power and Telecom sectors involving HV/Extra High Voltage (220KV/132kV/11KV/400V) Substations, Solar and Power Plant, Underground cables and Overhead Transmission Lines. My accomplishments include: devising methods for increasing productivity, reducing downtimes as well as overhead costs. Customer satisfaction always remains my priority as well. Moreover, I believe in a working that takes care of its people, place and planet. For that matter, I monitor the proper implementation of health, safety and environmental conditions, during handling of project related activities. Key Strengths include: Contract Management Operational Management. Strategist Decision Making Hand on experience on ERP and data analyst Quality Control General Administration Social Media Marketing Expeditions / Inspections

Overview

20
20
years of professional experience
7
7
years of post-secondary education

Work History

Managing Partner

CEO Empower Consultants
01.2022 - Current

LESCO- GSC Grid Station and TL ITC
01.2015 - Current

Warid Telecom
01.2013 - 01.2017

Dealer & Huawei/ZTE Subcon

Powered Micro, Peshawar
07.2010 - 10.2012
  • Grid (OFF Grid Plants)
  • JOB RESPONSIBILITIES
  • Involved in the design, specifications, BOQ and execution of various projects
  • Technical Study of 132/11kV Grid stations & Scope of Work
  • Successfully completed many projects across Power sectors involving HV/Extra High
  • Voltage (220KV/132kV/11KV/400V) Substations, Power Plant, Underground cables and Overhead Transmission Lines and Distribution system
  • Evaluate project feasibility and determine the best engineering method or practice to accomplish the job
  • Involved in estimating cost as well as a timeframe for the work to be completed
  • Ensure staff are properly trained in the use of all equipment and all staff have access to and use any safety and that the team is reaching the required milestones
  • Make sure projects adhere to all government and industry standards and guidelines
  • If special permits or records need to be obtained, ensure the paperwork is recorded and stored properly
  • My project accomplishments include but not limited to
  • Survey Of Transmission Line Route, Plan Tabling Of Transmission Line Route Preparation Of Route Plan And Profile Of 132KV D/C T/Line (IN & OUT) Sarfaraz Nagar Kasur For 132KV Grid Station Bahria Orchard (Length Of Line 11.2KM)Erection Of 132KV Equipment For Transformer Bay (T-5) At 132KV Grid Station Sheikhupura old
  • Erection Of 31.4/40MVA Power transformer With All Accessories Including Wiring, Dismantling Of Existing Panel Installation Of New Panel & Laying Of Power Cable At 132KV Grid Station Shalamar T-I
  • Supply Of Tool & Plants for Operation Of Grid Station Equipment At 132KV Grid Station General Hospital
  • Shifting/Erection Without Material At 132KV Grid Station Old Kot Lakh pat(Extension Of 02 NO Line Bays)
  • Supply Of Oil Temperature Gauge And Winding Temperature Gauge At 132KV Grid Station Punjab University Housing Society And 132KV Grid Station Doula Chouchak
  • Erection /Installation of 02-Nos 132KV Line Bays At 132KV Grid Station Walgon Sohail
  • Erection Of 01-NO 132/11KV, 31.5/40MVA Power Transformer At 132KV Grid Station Shalamar- 2(T-2)
  • Hiring of services for surveying and levelling with PEG marking feed for T/L 500KV sheikhupura-sharaqpura road-halmore
  • Survey Of Transmission Line Route, Plan Tabling Of Transmission Line Route, Preparation Of Route Plan And Profile Of 132KV D/C T/Line (IN & OUT) Sarfraz Nagar Kasur For 132KV Grid Station Bahria Orchard (Length Of Line 11.2KM)
  • Providing/Fixing With Complete Accessories Switch Gear Change Over On Double Source Feeders And Generator At Lesco Head Office 22-A Queens Road Lahore (Item Rate Basis) (2)
  • Hiring of services for surveying and levelling with PEG marking feed for T/L 500KV sheikhupura-sharaqpura road- 2-HNL formerly known as Hitech Electric Engineering, (KPK).Main accomplishment was increase in project profitability.

Project Manager

Enercom Solutions International Pvt. Limited
09.2008 - 04.2010
  • Involved in project feasibility study reports
  • Monitor, Control and Feedback the whole Project thru ERP
  • Achieved customer satisfaction by offering best quality services, minimizing pilferages that triggered further business deals
  • Monitoring all staff and sub-contractor KPI's including work activities with the ability to make performance changes to improve efficiency when needed achieving the goals of performance based culture
  • Preparing internal Quality audit plan and checklist and conducting quality audits
  • Alternate energy plans implementation for running power infrastructure
  • Supervision of Equipment swaps, NSN/ZTE subcon), My achievements as Project Manager was this, initially 888 site’s complete O&M scope offered, was later increased to 1350 sites as one compete region was awarded containing 432 sites, enabling additional revenues gain of PK
  • Rs
  • 3.2 million/month
  • Further contract renewal process was also successfully completed after expiry of one year period) JOB RESPONSIBILITIES:
  • Efficiently manage in excess of 300 team members including Area Leaders, Team Leaders, Multi-skilled trades people and Apprentices
  • Initiates, implements, and manages the project plans based on best practices in the services industry, with an emphasis on planning/scheduling and implementation
  • Ensures that all staff is adequately trained, equipped, and motivated so that the project can be accomplished in a safe, timely, and cost-effective manner
  • Established internal quality audit system for proper check and balance on field teams and subcontractor’s performance
  • Devised Performa for handing over and taking over sites regarding equipments condition and availability and sharing summary with all stake holders
  • To take care of spares parts, low and medium voltage switch gear equipments and tools warranty issues in liaison with different individuals firms and companies
  • To develop and manage aggressive O&M schedules
  • To solve problems with innovation and creativity
  • Ensuring staff safety under HSE guideline in the light of OHAS standards
  • Monitors the use and inventories of spare parts, supplies, and equipments and initiates reordering when necessary
  • Established and maintained a computerized tracking record for work orders, spare parts, and maintenance history
  • Conducts employee performance reviews based on job descriptions to determine competency, knowledge, and contribution to project
  • Maintains and updates operating and training manuals for different departments
  • Active participation in weekly and monthly performance review meeting with customers, suppliers and staff.

Sr. Executive Engineer

Wincom Private Ltd
06.2006 - 08.2008
  • Infrastructure Development & Maintenance (Closed 350 pending warranty support (after sales) jobs from different national and international equipment suppliers
  • Reduced high fault ratio by close coordination of subcontractors and own team of fixing installations faults)
  • JOB RESPONSIBILITIES:
  • Continuous monitoring of project roll outs , preventive maintenance and corrective maintenance activities of sites and feedback daily, weekly and monthly progress reports to management team
  • Coordination with different vendors and suppliers to have smooth O&M through close supervision
  • Verification of invoices and quotations of suppliers/subcontractors
  • A strict monitoring and surveillance is to be exercised in order to curb the pilferage of energy and diesel on small as well as large scale
  • To look after equipments warranty issues and liaison with different national and international suppliers for warranty support
  • To motivate, guide and supervise the field staff in order to get best output of them
  • Pre qualification of new vendors, evaluating their capabilities and recommendation for right jobs
  • To ensure usage of quality material/spares at sites
  • Standby arrangements, load sharing and synchronization of different power sources
  • Experimental installation of solar panel on site and trial testing.

Power Engineer

Exi
02.2005 - 05.2006
  • Technical Infrastructure and Site Acceptance, (Award of Highway sites after successful construction and installation of 125 sites as Power Engineer .Later I was transferred in QC/Site acceptance and DCC department as quality control Inspector .The project was started with 5 area managers and one site QC and site acceptance manager, later I was promoted as Acting Zone Manager and remained continuously part of the team who succeeded to hand over all sites to client resulting into release of final payments and insurance bonds.)
  • JOB RESPONSIBILITIES:
  • To review design, specifications and drawings of site and low voltage power equipment layouts
  • Reviewing electrical energy efficiency and dealing with any project discrepancies (plans, specs, contracts)
  • Supervision of power (energy meter, cabling, power DB, generators) installation on sites
  • Expedition of materials and labor to complete all stages of installation
  • Grounding of equipments and earth resistance testing
  • Coordination with WAPDA authorities regarding WAPDA Energy Meter installation and others problems relevant with the Authority
  • Generators installation, testing and commissioning and reporting
  • Testing of alarms and handing over to client
  • Preparing internal Quality Audit plan
  • Conducting audits and forwarding reports to Management team
  • To monitor the sub contractor work in the form of quality
  • To maintain the quality and quantity of work as per the specifications
  • To prepare daily progress report for the client evaluation
  • To inspect the ongoing sites for the quality point of view
  • Identify the defects, shortcomings and problems (OILS) that may cause delay in completion of project and give suggestions for the remedial measure
  • To prepare (SDR) site deficiency report regarding civil works prior to site approval
  • To prepare the data for the preparation of as built drawings and BOQs
  • Quality inspection of sites for site acceptance (PAT/FAT) of more than 100 sites.

Trainee Electrical Engineer

Olympia Chemicals
01.2003 - 01.2004
  • Coal fired Power Plant expansion from 3 MW to 6 MW, erection, (installation, testing and commissioning (I was hired as Trainee Electrical Engineer, competed training along with participation in erection activities of 3 MW steam operated turbo generators)
  • JOB RESPONSIBILITIES:
  • Design review for size of Transformer, Generator, Cables, Breakers and electrical panels according to the load requirement provided by consultant
  • Preparation of BOQs
  • Grounding work and its testing
  • Cable laying & termination
  • General electrification
  • Synchronization of Diesel Generators
  • Installation of ATS, AMF panel of diesel generator and Soft Starters
  • Installation, Testing, Commissioning of process industry equipments (cooling tower, feed water pump etc)
  • Solving WAPDA related problems
  • Active participation in monthly progress & coordination meeting within the organization
  • Planning & Scheduling of electrical activities
  • Producing planning and progress reports and feed back to project management team.

Education

M.Phil - Islamic Thought

Civilization University of Management & Technology

B.Sc. - Electrical engineering

the University Of Engineering & Technology
01.1998 - 01.2003

F.Sc - undefined

Govt. College Lahore
01.1995 - 01.1997

Matriculation - undefined

Govt. High School ShahKot

Skills

COMPUTER Proficiencyundefined

Accomplishments

I have worked on projects involving the installation of Power Transformers, GIS, Switchgear, Control & Protection panels, Battery & Charger equipment, ACDC panels, Lighting panel,Auxiliary. Panels

In addition to the above-mentioned equipment, my expertise also includes Grounding work, Cable tray installation, Cable pulling and termination, Duct blanks, Conduiting , and HVAC installation work .

Timeline

Managing Partner

CEO Empower Consultants
01.2022 - Current

LESCO- GSC Grid Station and TL ITC
01.2015 - Current

Warid Telecom
01.2013 - 01.2017

Dealer & Huawei/ZTE Subcon

Powered Micro, Peshawar
07.2010 - 10.2012

Project Manager

Enercom Solutions International Pvt. Limited
09.2008 - 04.2010

Sr. Executive Engineer

Wincom Private Ltd
06.2006 - 08.2008

Power Engineer

Exi
02.2005 - 05.2006

Trainee Electrical Engineer

Olympia Chemicals
01.2003 - 01.2004

B.Sc. - Electrical engineering

the University Of Engineering & Technology
01.1998 - 01.2003

F.Sc - undefined

Govt. College Lahore
01.1995 - 01.1997

M.Phil - Islamic Thought

Civilization University of Management & Technology

Matriculation - undefined

Govt. High School ShahKot
Hafiz Muhammad Munir Nasir