Summary
Overview
Work History
Education
Accomplishments
Affiliations
Work Availability
Timeline
Hi, I’m

Engr. Shoukat Ali

Town Qasimabad Hyderabad, Solar, 50,Sindh
Engr. Shoukat Ali

Summary

To fill challenging position as Project Planning & Control Manager/Construction Manager that allows me to utilize my creativity, expertise and experience to play apart in moving the organization forward on long-term basis and get an environment that promotes continual upgrading of knowledge and strong opportunity for advancement and growth within the organization. Job Profile: Having 16 years of diversified experience in the field of civil construction of Motorways, Bridges, Canals, Residential buildings, Mechanical Works in various plants & Mega-structures such as Petrochemicals

Overview

20
years of professional experience

Work History

Project Manager
04.2018 - Current

Job overview

  • Complex & Electrical Works of 380/110/13.8 k V Substation & 380/110kV Overhead Transmission Line
  • Construction of Combined Cycle Power Plants (Duba Power Plant)
  • Construction of Single Small Units & Commercial Plaza (Hajra Heights, ASA Block G)
  • Project Objective: - To Construction of Single Small Units, Flats & Commercial Plaza
  • Responsible of Plot registration / Authentication.

SAUDI BINLADEN GROUP PCM DIVISION KSA, Aramico Mobil Refinary Yanbu

Planning Engineer
08.2022 - 04.2022

Job overview

  • Preparation of detailed resource loaded construction schedule using Primavera P6 for a multi discipline project
  • Perform analysis and critical path review of the project schedule and recommend necessary recovery plan whenever activities are going into the critical path
  • Responsible for the execution and implementation of the project execution plan through a team of construction staff in a most professional manner
  • Preparation of Master Plan of the Project
  • (Base Line Schedule)
  • Preparation of Level IV Plan for Execution team (Resource Loaded)
  • Progress Monitoring according to Earned Man-hours Basis in Primavera Project Planner
  • Progress Reporting, Histogram, S-Curve Preparation in Primavera
  • Physical Progress Monitoring & Reporting
  • Raise queries to client whenever any discrepancies were found with the IFC drawings & actual field situations and recommend necessary action for their approval
  • Manpower Distribution as per scope of work.

Saudi Services for Electro Mechanic Works Co.LTD

Designer / Architecture Firm
05.2016 - 04.2018

Job overview

  • Finishing of Allotted Units as per Owner requirements
  • Completion with respect to Work and Concerned Authorities
  • Handing over of Small Units/ Flats / Plaza.

Saudi Services for Electro Mechanic Works Co.LTD

Project Planning & Control (Lead Planning Engineer)
05.2016 - 04.2018

Job overview

  • Gas Turbine # 02 (7FA05)
  • Steam Turbine
  • Solar Field Panels Erection
  • Storage Tanks Civil / Mechanical Construction
  • Condensate Gas Fuel Storage Tanks (2
  • Nos
  • Capacity 30,000cubm each)
  • ASL treated & Untreated Tanks (2
  • Nos
  • Capacity 15,000cubm each)
  • Desalinated Water Tanks & Pumps (2
  • Nos
  • Capacity 6,500cubm each)
  • Demi Water Tanks & Pumps (2
  • Nos
  • Capacity 1,500cubm each)
  • Fire Fighting Tank (Capacity 4,000cubm)
  • Service Water Tank & Pumps (Capacity 400cubm)
  • Potable Water Tank (Capacity 75cubm)
  • Condensate Water Tank & Pumps (Capacity 600cubm)
  • Distillate Oil Tank (Capacity 300cubm)
  • Mechanical & Electrical Equipment’s Installation
  • Mechanical Equipment’s Installation (GT, Steam Boilers, Pumps etc)
  • Electrical Equipment’s Installation
  • (GT, Steam turbine Generators, GSUT, UAT, Auxiliary
  • Transformers, MV/LV Transformers)
  • Piping Systems
  • Fire Fighting & Fire Alarm System
  • Saudi Electricity Company, Kingdom of Saudi Arabia, Project: - Construction of Duba Green 380/132kV Substation & UG Tunnel (Duba Green Power Plant)
  • Contractor: - Consortium INITEC ENERGÍA – SSEM (CIS)
  • Project Cost: - 525,807,013.00 SAR
  • Project Objective: - The subject Project has been created to construct the new 380/132kV Duba Green Substation for Duba green Integrated Power Plant distribution
  • The new substation will be equipped with 8 dia 380kV
  • GIS, 25 feeders of 132kV GIS, 3 (502 MVA) Power Transformer, 7 Reactors, 2 Service Transformers
  • Substation Automation System (SAS), 380 & 110kV GIS Building with Cable Tunnel & Cable Basement respectively, Control Building with associated work is to be Constructed
  • Outdoor GIB, Remote end construction work is part of Contract
  • UGC Portion is also part of Duba Green Substation connects to
  • Power Plant Generation Side
  • The Substation planned on Early Partial Energization on 31-Dec-2016 for auxiliary power supply to under
  • Construction Duba Green Integrated Solar Combined Cycle Power Plant.

Saudi Services for Electro Mechanic Works Co.LTD

Project Planning & Control (Senior Planning Engineer)
03.2014 - 10.2016

Job overview

  • Saudi Electricity Company, Kingdom of Saudi Arabia
  • Project: - 380/110kV Yanbu-Umlujj Overhead Transmission Line (567 to 609Nos
  • Towers and 214 to 238km)
  • Project Cost: - 316,000,000.00SAR after variation order due to change in tender route 346,705,573SAR
  • Project Objective: - The subject Project of Overhead Transmission line of 380/110kV was constructed from Umlujj
  • North 380kV S/S to Yanbu-3 S/S consisted of Erection of 547 Nos
  • Towers and 216km of Access road
  • Umlujj North 380kV S/S to Umlujj 110/13.8kV S/S existing OHT Line 31Nos
  • Towers and 11km Access road, Umlujj North 380kV S/S to AL-AIS 110kV S/S existing OHT line 31 Nos
  • Towers and 11km Access road
  • Project delayed due to ROW Problem of 380 & 110kV Lines
  • Schedules revised 3 times.
  • Client: - Saline Water Conversation corporation (SWCC)
  • Project: - 380/110kV Yanbu-Musayjeed Overhead Transmission Line (462Nos
  • Towers and 155km)
  • Project Cost: - 265,000,000.00SAR after variation order due to change in tender route 276,128,884SAR
  • Project Objective: - The subject Project of Overhead Transmission line of 380/110kV was constructed major route from Proposed Yanbu-3 BSP to Proposed Pumping Station (PS2) 380kV S/S
  • Project delayed due to ROW Problem of 380 & 110kV Lines
  • Schedules revised 5 times with latest forecast completion date as 22-June-2017
  • Client: - Saudi Electricity Company, Kingdom of Saudi Arabia
  • Project: - 380 kV D/C Shoaiba-Al-lith Overhead Transmission Line (267Nos
  • Towers and 107KM)
  • Project Cost: - 174,400,000.00SAR
  • Project Objective: - The subject Project of Overhead Transmission line of 380/110kV was constructed major route from Shoaiba to Al-Lith S/S
  • Successful Energization of Line on TCC
  • Client: - Saudi Electricity Company, Kingdom of Saudi Arabia
  • Project: - 380 kV DC Bisha-TEG Overhead Transmission Line (517 Nos
  • Towers and 201KM)
  • Project Cost: - 399,000,000.00SAR
  • Project Objective: - The subject Project of Overhead Transmission line of 380kV D/C was constructed major route from Bisha BSP to Taif 380kV S/S
  • Successful Energization of Line on TCC on 27-May-2016
  • Monitored Up-to FAC 27-Oct-2016 final invoice.

Saudi Services for Electro Mechanic Works Co.LTD

Project Planning & Control (Senior Planning Engineer)
11.2015 - 10.2016

Job overview

  • Saudi Electricity Company, Kingdom of Saudi Arabia
  • Project: - 110/13.8kV New Al-Khandaq Madina Al-Munawarah Substation Project
  • Project Cost: - 164,257,196.00SAR
  • Project Objective: - The Project is envisaged to meet the rapidly growing demand of Madina Al-Munawarah Haram
  • Under this project a new 110/13.8kV S/S located in the Madina City Kingdom of Saudi Arabia, New13.8kV S/S with (12) Bays 110kV, 3 Transformer 110/13.8kV (50/67MVA), 3 Capacitor Bank 7 MVA, (44) Switchgear 13.8kV, complete with Protection & Control, SCADA & Communication & Civil work under execution
  • Delayed completion of TCC 06-Sep-2016.

Saudi Services for Electro Mechanic Works CO.LTD

Project Planning & Control (Senior Planning Engineer)
03.2016 - 10.2016

Job overview

  • Saudi Electricity Company, Kingdom of Saudi Arabia
  • Project Cost: - 539,600,000.00SAR
  • Project: - 380/110/13.8kV Madina Central BSP Substation Project
  • Project Objective: - The subject Project has been created to construct the New Indoor Type110/13.8kV Madina Central BSP Substation Project
  • The new substation will be equipped withdia, 5 Transformer 380kV (502 MVA), Substation Automation System (SAS), 380 & 110kV GIS Building with Cable Tunnel & Cable Basement respectively, 13.8kV Switchgear, building with cable basement &
  • Control Building with associated work is to be constructed
  • Outdoor GIB, Remote end construction work is also part of Contract
  • Successful completion of TCC on 03-August-2016
  • Monitored Up-to TCC invoice of MDC Project.

Saudi Services for Electro Mechanic Works CO.LTD

Project Planning & Control (Senior Planning Engineer)
09.2012 - 03.2014

Job overview

  • Project Cost: - 612,000,000.00SAR
  • Project: - King Abdul Aziz International Airport Development Project Phase 1, Construction of New Jeddah
  • North East 380/110/13.8kV Bulk Supply Point BSP [JNE] & 380 &110 kV Underground Cable associated with JNE
  • Project Objective: - The subject Project has been created to construct the New Indoor Type Jeddah
  • North East 380/110/13.8kV S/S, Underground Cable associated by JNE & expansion of Jeddah
  • North 380kV S/S (additional work) to supply adequate power for the current and future
  • Development of King Abdul-Aziz International Airport (KAIA) under the main program of
  • General Authority for Civil Aviation (GACA)
  • The new substation will be equipped with
  • Substation Automation System (SAS), 380 & 110kV GIS Building with Cable Tunnel & Cable
  • Basement respectively, 13.8kV Switchgear, building with cable basement & Control Building with associated work is to be constructed.

Saudi Services for Electro Mechanic Works CO.LTD

Project Planner
09.2012 - 01.2014

Job overview

  • Responsible for Material Management, Man Power & Resources for Construction of Minor Structures (Under Passes, Cattle
  • Creeps & Box Culverts)
  • Progress Updating in DPMS (DESCON Progress Monitoring System) & Generation of Daily, Weekly & Monthly Progress
  • Reports
  • Material takes off from Drawings according to requirement.

DESCON ENGINEERING LIMITED

Project Planning & Control (Senior Planning Engineer)
09.2011 - 08.2012

Job overview

  • Saudi Electricity Company, Kingdom of Saudi Arabia, Project Cost: - 88,400,000.00SAR
  • Project: - Construction of ET-2 110/13.8kV Substation Jeddah
  • Project Objective: - The Project is envisaged to meet the rapidly growing demand in Jeddah City
  • Under this project a new 110/13.8kV S/S located in the Jeddah western sector Kingdom of Saudi Arabia, New 110/13.8kV S/S with (14) Bays 110kV, 3 Transformer 110/13.8kV (50/67MVA), 3 Capacitor Bank 7 MVA, (44) Switchgear8kV, complete with Protection & Control, SCADA & Communication & Civil work will be Executed
  • 9

SAUDI BINLADEN GROUP PCM DIVISION KSA

Senior Planning Engineer
01.2011 - 09.2011

Job overview

  • Ma’aden Infrastructure Company (MIC)
  • Project: - Ma’aden Raz Az Zawr Residential Village Phase-II
  • Project Objective: - Construction of Ma’aden Raz Az Zawr Residential Village for accommodation of Skilled & non-
  • Skilled Staff of Installed refinery & Power Plants inside the Raz Az Zawr Village.

SAUDI BINLADEN GROUP PCM DIVISION KSA

Senior Planning Engineer
12.2010 - 01.2011

Job overview

  • NAMA
  • Project: - NAMA 120 K Epoxy Expansion Project (JANA)
  • Project Objective: - Expansion, Maintaince & Construction of NAMA 120 K Epoxy Plant Expansion (JANA Plant) at
  • Al-Jubail Saudi Arabia.

SAUDI BINLADEN GROUP PCM DIVISION KSA, King Abdullah University of Science & Technology

Senior Planning Engineer
07.2010 - 12.2010

Job overview

  • Project Objective: - Construction of King Abdullah University of Science & Technology residential village.

SAUDI BINLADEN GROUP PCM DIVISION KSA, Industries Corporation, SABIC

Senior Planning Engineer
04.2010 - 07.2010

Job overview

  • Project: - Obeikan Nitrogen Pipe Line Project
  • Project Objective: - Civil construction & Installation of Nitrogen Pipe line to fulfill the industrial requirements of
  • Obeikan Plant in Yanbu Royal commission of KSA.

SAUDI BINLADEN GROUP PCM DIVISION KSA, Shaw Stone & Webster Arabia Co. Ltd

Planning Engineer
06.2008 - 08.2009

Job overview

  • Remaining Civil & Underground Works of Butane BTX Project (YANBU National Petrochemical
  • Company YANSAB, 1
  • Preparation of detailed resource loaded construction schedule using Primavera Project Planner for a multi discipline project
  • Perform analysis and critical path review of the project schedule and recommend necessary recovery plan whenever activities are going into the critical path. 3
  • Responsible for the execution and implementation of the project execution plan through a team of construction staff in a most professional manner
  • Preparation of Master Plan of the Project
  • (Base Line Schedule)
  • Preparation of Level IV Plan for Execution team (Resource Loaded)
  • Progress Monitoring according to Earned Man-hours Basis in Primavera Project Planner
  • Progress Reporting, Histogram, S-Curve Preparation in Primavera
  • Physical Progress Monitoring & Reporting
  • Coordinate with construction engineers regarding construction progress with analysis on their ongoing task and discuss whatever necessary action required to expedite progress
  • Preparation and submission of monthly Invoices along with the supporting documents and administering change orders
  • Preparation of cost estimates to variation orders
  • Raise queries to client whenever any discrepancies were found with the IFC drawings & actual field situations and recommend necessary action for their approval.

DESCON ENGINEERING LIMITED
, Sindh

Planning Engineer
04.2007 - 02.2008

Job overview

  • Water and Power Development Authority (WAPDA, : - Infrastructure Project (Rainee Canal including construction of Head Regulator, 1
  • Responsible for the availability of the project direct materials at site by keeping a close eye on the project material requirement plan
  • Close coordination with the project planning team for the development of project 3 months & 4 week look ahead plan and their updating as per work front availability
  • Keep a close eye on the project cost by comparing it with the project Budget, meanwhile observation of efficiency reports and remedial action to improve the overall project efficiency
  • Provide the Contract with the necessary assistance over the contractual matters
  • Provide the Subcontracts department with necessary support to source out the proper subcontractor
  • Over all Responsible for the construction supervision of Structures, (including hydraulic structures, sub & super structures)
  • Earth works Including excavation of canal in marshy land
  • Acting In-charge Planning in absence of In-charge Planning.

DESCON ENGINEERING LIMITED

Planner
07.2005 - 04.2007

Job overview

  • Project: Islamabad ~ Peshawar Motorway Project Peshawar NWFP, having contract value of 1.28
  • Billion Pak rupees
  • Job, 1- Responsible for overall Progress Monitoring, Scheduling of Minor, Major Structures & Earth Work activities in Primavera

DESCON ENGINEERING LIMITED

Health Safety & Environment
11.2004 - 07.2005

Sarhad Hydel

Deputy Manager

Job overview

  • Development Organization Govt
  • Of Khyber Pakhtunkhwa, Project: - Ranolia Hydropower Project (17 MW)
  • Project Objective: - Construction of 17Mega Watt Power Plant includes construction of Weir & Intake, Canal, Inlet &
  • Outlet Pond, Syphon, Temporary & Permanent Bridges at Ranolia River, Turbine
  • The Client residential colony, buildings for Hydropower turbine, motor operated cranes & installed equipment’s
  • Scope of Work:
  • It was a EPCC (Engineering, Procurement, Construction and Commissioning) project
  • 5 km project Access Road with Two Bridges
  • 16.4 Kanals Employer’s Colony
  • Weir, Gate controlled Intakes & Diversion Dam
  • 175 meters Connection Channel & (75.5m ×16.5m) Sand Trap/Gravel Trap
  • 2650 meters Rectangular Concrete Headrace Channel
  • 830 meters long and 1500 mm diameter Siphon
  • Siphon Inlet & Outlet ponds with Gates
  • 400 m² Forebay & 684 meters long and 1500 mm diameter Penstock
  • 504 m² Power House with two Pelton Turbines attached with two Generators of 8.5MW capacity each
  • Switch yard and 6 km Transmission Lines
  • Rectangular Concrete Tailrace channel.

DESCON Engineering Limited
Lahore

Management Trainee

Job overview

  • Responsible to Learn Different Department Procedures and Software
  • Coordination between H.O & Project Site regarding Progress Reporting
  • To Monitor the Fixed Assets & Inventory control at Project Site
  • Tools Management & its Calibration.

Education

Board of Technical Education

DIT (Diploma of information Technology)
2005

Mehran University of Engineering & Technology

B.E from Civil
2004

F- COMPUTER LITERACY._______________________________________________________________________ 1- Auto Cad 2- Primavera Project Planner Version P3

University Overview

& P6 3- MS Project 4- MS Office G- PROFESSIONAL SKILLS.______________________________________________________________________ Excellent Communication Skills, can read, write & speak English, Urdu & Sindhi very fluently. Fluent speaking communication in Punjabi & Siraki Language. Can understand Basic conversation of Arabic & Pushto Language. H- PERSONAL INTERESTS. Project Planning, Contract Management, Claim Preparation, Progress Monitoring, & Construction Supervision.

Capacity 620 MW. 2 generator Transformer 160 +160MV

Steam Turbine 250MV

University Overview

  • Solar Plant 50MV. The Following Related Systems were constructed / Installed. Power Plant Major Building Civil / Mechanical / Electrical Works.
  • Turbine Building (2 Gas turbine, 1 Steam Turbine).
  • Power Block Electrical Building.
  • Offices & Central Control Room.
  • Hydrogen Generation Plant.
  • Arabian Super light (ASL) Electrical Building.
  • Pump House.
  • Water Treatment & Desalination Plant.
  • Sea Water Electro Chlorination Plant. Major Building Structures Civil Construction for Administration Block. Main Administration Building.
  • National Guard Compound.
  • Industrial Security Building. Aid & Ambulance Building. Canteen Building.
  • Ware House Area.
  • Helipad. ’s Foundations / Erection.
  • Gas Turbine # 01 (7FA04)

Accomplishments

  • B- PROFESSIONAL TRAININGS
  • Management Development Program-1 (MDP-1) training from Descon Engineering Limited Pakistan
  • Primavera P3 from Descon Engineering Limited Pakistan
  • Primavera P6 from PROMASTAR PMI KSA
  • Advanced Project Management Course from PROMASTAR PMI KSA
  • Microsoft Project from Saudi Services for Electro Mechanic Works Co
  • Ltd KSA
  • I have Multi & good experience of Planning, Scheduling, Invoicing, Monitoring, reporting & Construction for the following Project
  • Civil Projects: - Motorways, Bridges, Underpasses, and Cattle creeps, Box Culverts (Single, Double & Triple Cell)
  • Head
  • Regulator, Divide Wall, Silt Excluder / Skimming Platform, Canal Construction & Canal Structures (Village Road
  • Bridges & Foot Bridges)
  • Construction of Commercial Plaza, Small Units
  • Mechanical Projects: - Construction of underground Piping and its Civil Works as Heavy Foundation, Pipe Support
  • Foundation, Dike Wall & Structures
  • Different Types of Piping Installation as RTR & CS Piping and its Testing (Hydro & Service Tests)
  • Installation of Piping which are Fire water, Drinking Water, Contaminated Storm
  • Sewer Lines, Sanitary Waste Water, Clean Storm Water, Closed Benzene Drain Lines, Oily Water Line &
  • Process Lines
  • Mechanical Turnarounds: - SAMREF Turnaround 2010 Yanbu
  • Pre-Turnaround Preparation, Execution of Turnaround
  • Activities, Variation Order, Work Order, Client Correspondence, Invoice Preparation & Submissions
  • Electrical Substation Projects: - Construction of 380/110/13.8kV Substation equipped with Substation Automation System (SAS), 380 & 110kV GIS Building with Cable Tunnel & Cable Basement respectively, 13.8kV Switchgear
  • Building with cable basement & Double Story Control & Relay Building with associated work and Construction of 110/13.8kV Substation equipped with Substation Automation System (SAS), 110kV GIS Building with Cable
  • Tunnel & Cable Basement respectively, 13.8kV Switchgear Building with cable basement & Double Story
  • Control & Relay Building with associated works
  • Overhead Transmission Line: - Construction of 380 & 110kV Overhead Transmission Line
  • Combined Cycle Power Plants: -Construction of Duba Green Integrated Solar Combined Cycle Power Plant
  • Position: - Project Planning & Control (Lead Planning Engineer)
  • Client: - Saudi Electricity Company, Kingdom of Saudi Arabia
  • Project: - Construction of Duba Green Integrated Solar Combined Cycle Power Plant
  • Contractor: - Consortium INITEC ENERGÍA – SSEM (CIS)
  • Project Cost: - 2.5 Billion SAR
  • Project Objective: - To Construction of Duba Green Integrated Solar Combined Cycle Power Plant.

Affiliations

  • Registered Member of (PEC) Pakistan Engineering Council. Under Registration # Civil/24419.
  • Saudi Engineering Council.
  • Saudi Society for Civil Engineers
Availability
See my work availability
Not Available
Available
monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Planning Engineer

SAUDI BINLADEN GROUP PCM DIVISION KSA, Aramico Mobil Refinary Yanbu
08.2022 - 04.2022

Project Manager

04.2018 - Current

Designer / Architecture Firm

Saudi Services for Electro Mechanic Works Co.LTD
05.2016 - 04.2018

Project Planning & Control (Lead Planning Engineer)

Saudi Services for Electro Mechanic Works Co.LTD
05.2016 - 04.2018

Project Planning & Control (Senior Planning Engineer)

Saudi Services for Electro Mechanic Works CO.LTD
03.2016 - 10.2016

Project Planning & Control (Senior Planning Engineer)

Saudi Services for Electro Mechanic Works Co.LTD
11.2015 - 10.2016

Project Planning & Control (Senior Planning Engineer)

Saudi Services for Electro Mechanic Works Co.LTD
03.2014 - 10.2016

Project Planning & Control (Senior Planning Engineer)

Saudi Services for Electro Mechanic Works CO.LTD
09.2012 - 03.2014

Project Planner

Saudi Services for Electro Mechanic Works CO.LTD
09.2012 - 01.2014

Project Planning & Control (Senior Planning Engineer)

DESCON ENGINEERING LIMITED
09.2011 - 08.2012

Senior Planning Engineer

SAUDI BINLADEN GROUP PCM DIVISION KSA
01.2011 - 09.2011

Senior Planning Engineer

SAUDI BINLADEN GROUP PCM DIVISION KSA
12.2010 - 01.2011

Senior Planning Engineer

SAUDI BINLADEN GROUP PCM DIVISION KSA, King Abdullah University of Science & Technology
07.2010 - 12.2010

Senior Planning Engineer

SAUDI BINLADEN GROUP PCM DIVISION KSA, Industries Corporation, SABIC
04.2010 - 07.2010

Planning Engineer

SAUDI BINLADEN GROUP PCM DIVISION KSA, Shaw Stone & Webster Arabia Co. Ltd
06.2008 - 08.2009

Planning Engineer

DESCON ENGINEERING LIMITED
04.2007 - 02.2008

Planner

DESCON ENGINEERING LIMITED
07.2005 - 04.2007

Health Safety & Environment

DESCON ENGINEERING LIMITED
11.2004 - 07.2005

Deputy Manager

Sarhad Hydel

Management Trainee

DESCON Engineering Limited

Board of Technical Education

DIT (Diploma of information Technology)

Mehran University of Engineering & Technology

B.E from Civil

F- COMPUTER LITERACY._______________________________________________________________________ 1- Auto Cad 2- Primavera Project Planner Version P3

Capacity 620 MW. 2 generator Transformer 160 +160MV

Steam Turbine 250MV
Engr. Shoukat Ali