AZHAR MASOOD CHOUDHRY

AZHAR MASOOD CHOUDHRY

RESIDENT ENGINEER
Lahore

Summary

I have over 29 years extensive experience in the field of civil engineering works. Presently, I am working with Nespak as ARE (Lot-2) on the Project of Punjab Intermediate Cities Improvement Investment Program (PICIIP), Sahiwal LG&CD Department, Govt. of Punjab, Pakistan. In Saudi Arabia I was working with MH Aitah Nespak Engineering Services Riyadh KSA as a Resident Engineer/In charge on the project of Yabba & Qanuna Water Treatment Plant Ph-4 and have been working with Punjab University as a Resident Engineer/Acting Project Manager on the project Punjab University Employees Housing Scheme Raiwind Road. The infrastructure works include water supply works, water treatment works, sewerage and drainage works and road works.


  • With NESPAK i was working as Senior Engineer/Assistant Resident Engineer on the project Infrastructural works of G Magnolia Park Housing Scheme Phase-1 Gujranwala. Infrastructure works includes
  • Sewerage works Water supply distribution Network and water treatment including filtration and chlorination.
  • Construction of Over Head Water Tanks. Tube Wells.
  • Storm Water drain.
  • Road Work-50, 70,100,120,150 ft Wide Culverts.


As a Construction Manager with FWO, worked on the project of infrastructural works of DHA, Phase-6, i was responsible for preparation of

-Construction Schedule.

-Preparation of monthly report

-Preparation of shop drawings & bar bending schedules


Supervision Works

1-Road Work-50, 70,100,120,150 ft Wide

2-Sewerage works

3-Water supply distribution Network

4-Construction of Over Head Water Tanks. 5-Tube Wells.

6-Storm Water drain.

7-Culverts.


With MMP on Lahore-Faisalabad Dual Carriageway (BOT) Project. I worked on Road work (Dual Carriage way), side drains, extension of Culverts from Rd 0+000-34+000, and Construction supervision of Bridge structures.


I have worked on estimation and preparation of BOQs/tender documents on Rural Road Construction Projects funded by ADB.

Have extensive experience of earthwork, road construction and highway structures such as bridges, culverts, causeways and other structures etc. Have worked on Dalbandin-Nokandi Road Project in Balochistan, Widening and Improvement of Ghazi Road (Defence Road), Lahore-Islamabad Motorway Project, Widening/Reconstruction of GT Road, Construction of Road Bridge near Pattoki Railway Station and a number of Hydraulic structures viz;

Head Regulator B.S. Link Canal-II

Fall Structure B.S. Link Canal-II RD 33+430.3 Remedial Measures (Long Term)

Overview

32
32
years of professional experience
2
2
Languages

Work History

ARE/ Civil Engineer

Nespak
10.2021 - Current

Project: Punjab Intermediate Cities Improvement Investment Program (PICIIP), Sahiwal LG&CD Department, Govt. of Punjab, Pakistan.

Description of duties: Construction Supervision of rehabilitation/ improvement of sewerage system in North zone, Sahiwal Phase-1 Lot-2


RE/ Civil Engineer

MH. Aitah Nespak Engineering Services
02.2012 - 10.2021

Project: Yabba & Qanuna Water Treatment Plants. (Ph-4)

Description of Duties: Construction Supervision

Project Manager/ Resident Engineer

Punjab University Lahore
04.2008 - 04.2011

Project: Punjab University Employees Housing Scheme Raiwind Road, Lahore

Description of duties: Design review and supervision of infrastructure works.


Project components include;

  • Water supply system including installation of tube well, distribution network and underground and overhead water tanks. Filtration and chlorination Water treatment process.
  • Sewerage system including sewerage collection system, sewage pumping station.
  • Storm water drainage system including drainage network.

Senior Engineer

NESPAK
12.2007 - 03.2008

Project: Infrastructural works of G Magnolia Park Housing Scheme Phase-1 Gujranwala

Description of duties: Supervision of infrastructure works.

  • Project components include; Water supply system components include water treatment works including filtration and chlorination. Installation of tube well, distribution network and underground and overhead water tanks.
  • Sewerage system including sewerage collection system, sewage pumping station.
  • Storm water drainage system including drainage network.


Construction Manager

FWO
02.2006 - 11.2007

Project: Infrastructural works of DHA, Phase-6

Description of duties: Responsible for execution of Construction Schedule.

  • Preparation of monthly report.
  • Preparation of shop drawings & bar bending schedules.
  • Supervision Works: 1-Road Work-50, 70,100,120,150 ft Wide, 2-Sewerage works, 3-Water supply distribution Network, 4-Construction of Over Head Water Tanks, 5-Tube Wells, 6-Storm Water drain, 7-Culverts.


Senior Engineer (ARE)

MMP (Pvt Ltd. Lahore)
03.2004 - 01.2006

Project: Lahore-Faisalabad Dual Carriageway (BOT) Project

Assistant Resident Engineer (ARE)

Engineering General Consultants EGC (Pvt) Ltd. Lahore
07.2001 - 03.2004

Description of duties: Construction Supervision of Urban Water Supply and Sanitation Project, Rawalpindi (funded by ADB):

  • Lai Nullah Improvement Works.
  • Widening of Lai Nullah.
  • Construction of inlet structures.
  • Service Roads Work.
  • Construction of water treatment plant the component of treatment plant includes clarification filtration and chlorination.
  • Preparation of revised BOQ and costing.
  • Calculations of price adjustments.
  • Checking of variation orders and revision of costs and quantities.

Project Manager

Hassan Zaman (Pvt) Ltd.
10.1997 - 06.2001

Description of duties:

  • LCCHS Construction of water supply system.
  • Widening and improvement of Ghazi Road (Defence Road) joining Ferozepur road to Rangers Headquarter.
  • Further Duties included construction supervision of water supply system, road work, culverts and drainage including preparation of Bill of Quantities and cost accounting of Earth Work.

Project Engineer

Indus Associated Consultants (Pvt) Ltd.
01.1997 - 08.1997

Description of duties:

  • Estimation and preparation of BOQ/Tender Documents on Rural Road Construction Project (RRCP) funded by ADB.

Civil Engineer

Zee Khan Associates (Pvt) Ltd.
11.1995 - 12.1996

Description of duties:

  • Widening / Reconstruction of G.T.Road near Gujranwala.
  • Construction Management of Bridge near Pattoki Railway Station.
  • Worked for construction supervision of planning & scheduling of the work.

Junior Highway Engineer

Progressive Consultants (Pvt) Ltd.
05.1995 - 10.1995

Description of duties:

  • Inventory Survey of the Punjab Road project, funded by ADB.
  • Collection of Hydraulic Data of the Canals along Roads in the Punjab.
  • Collection of the Flood Information Punjab Projects.

Site Engineer

Al-Khan Construction Co. (Pvt) Ltd.
05.1994 - 04.1995

Description of duties:

  • Section – III – A Project (Dalbandin – Nokandi Road) in Baluchistan.
  • Responsible for construction supervision of Earth Work, Box culverts, Cause Ways and Cost evaluation of all work.

Civil Engineer

Highway Bridges Constructors International
09.1993 - 03.1994

Project: Lahore Islamabad Motorway Project.

Description of duties: As Site Engineer was responsible for construction supervision of Structures and Cost Accounting.

Education

Bachelor of Science - Civil Engineering

University of Engineering And Technology

B.A - undefined

Punjab University

Key Qualifications

I have over 29 years extensive experience in the field of civil engineering works.

Professional Memberships

Pakistan Engineering Council, Civil-16720

Personal Information

  • Date of Birth: 12-07-1963
  • Nationality: Pakistani

Training

  • Computer Basic, Window 95, Winword, Excel, Power Point, Disk Operating System, Comutech Academy of Computer Training Karim Bakhsh Road, New Samanabad Lahore
  • AutoCAD – 14
  • Corel Draw – 9
  • Primavera Project Planner, I.T.G. Institute of Computer Science 41-Multan Road, More Samanabad Lahore

Software

Autocad

Excel

Primavera

Microsoft office

Timeline

ARE/ Civil Engineer

Nespak
10.2021 - Current

RE/ Civil Engineer

MH. Aitah Nespak Engineering Services
02.2012 - 10.2021

Project Manager/ Resident Engineer

Punjab University Lahore
04.2008 - 04.2011

Senior Engineer

NESPAK
12.2007 - 03.2008

Construction Manager

FWO
02.2006 - 11.2007

Senior Engineer (ARE)

MMP (Pvt Ltd. Lahore)
03.2004 - 01.2006

Assistant Resident Engineer (ARE)

Engineering General Consultants EGC (Pvt) Ltd. Lahore
07.2001 - 03.2004

Project Manager

Hassan Zaman (Pvt) Ltd.
10.1997 - 06.2001

Project Engineer

Indus Associated Consultants (Pvt) Ltd.
01.1997 - 08.1997

Civil Engineer

Zee Khan Associates (Pvt) Ltd.
11.1995 - 12.1996

Junior Highway Engineer

Progressive Consultants (Pvt) Ltd.
05.1995 - 10.1995

Site Engineer

Al-Khan Construction Co. (Pvt) Ltd.
05.1994 - 04.1995

Civil Engineer

Highway Bridges Constructors International
09.1993 - 03.1994

B.A - undefined

Punjab University

Bachelor of Science - Civil Engineering

University of Engineering And Technology
AZHAR MASOOD CHOUDHRYRESIDENT ENGINEER