Summary
Overview
Work History
Education
Skills
Software
Interests
Timeline
SoftwareDeveloper

Ashad Akbar

Engineer
Karachi

Summary

Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Hardworking and passionate job seeker with strong organizational skills eager to secure a good position. Ready to help team achieve company goals.

Overview

4
4
years of professional experience
20
20
years of post-secondary education
2
2
Languages

Work History

Engineering Intern

Toyota Indus - Indus Motor Company Limited
Karachi
2019.03 - 2019.06
  • Assisted senior engineers and management with clerical duties to keep department functioning and workflows running smoothly.
  • Studied manufacturing processes to improve overall knowledge.
  • Collaborated with senior engineers on projects and offered insight.
  • Implemented rich, interactive data visualizations using modern JavaScript and software development techniques.
  • Worked closely with engineers and assisted with testing of products.
  • Created 3D models from 2D drawings.
  • Designed and coordinated engineering tests and experiments.

Engineer Trainee

Feroze 1888 Textile Mill Pvt Limited
Karachi
2020.06 - 2021.10
  • Assisted senior engineers and management with clerical duties to keep department functioning and workflows running smoothly.
  • Studied manufacturing processes to improve overall knowledge.
  • Collaborated with senior engineers on projects and offered insight.
  • Put together specification documents covering implementation of design plans.
  • Used SAP ERP to create professional, high-quality designs.
  • Production planning considering SKU compliance & production compliance weekly basis.
  • Evaluated quality control processes and made recommendations for improvements in quality control.
  • Assisted with coordination of new equipment installation and implementation.

Production Associate

Channel Textile Pvt Ltd - Karachi, PK
Karachi , Sindh
2022.01 - 2022.07
  • Inspected final products to assess compliance with quality standards and established tolerances.
  • Supported current production needs by moving items between equipment, conveyors, and staging areas.
  • Supported production needs by performing routine tasks using standard procedures and equipment.
  • Took on additional shifts during peak work periods to keep projects on schedule.
  • Delivered troubleshooting assistance to bring machines back to full functionality.
  • Assisted development leads in definition of process flows, relative task priorities and business value measurement parameters.
  • Adjusted machines to increase productivity for runs.
  • Organized work to meet demanding production goals.
  • Interacted with internal partners to track development progress and address non-conforming issues to avoid negative impacts on completion timelines.
  • Worked with development team to define and implement customer change requests to enhance product functionality.
  • Used equipment properly to avoid workplace hazards or injuries.
  • Inspected and adjusted work performed to meet expectations.
  • Provided work orders to outside vendors and maintained project specification records.
  • Supported development team in generation of technical requirements and product documentation to achieve process commonality.
  • Checked and wrapped items, placed in boxes and labeled cartons for shipping.
  • Lead and supervised a team of skilled and unskilled 30+ workers and 2 production supervisors for proper & efficient manufacturing process.

Senior Engineer

Power Technology Pvt Limited
Karachi
2022.11 - Current
  • Controlled project costs by approving expenditures.
  • Adhered to timelines to meet quality assurance targets.
  • Developed and implemented proactive maintenance practices.
  • Performed preventive maintenance and repairs on mechanical equipment.
  • Evaluated sites to determine soil adequacy for handling building foundation loads.
  • Enforced rules and regulations to keep working environment safe.
  • Determined project specifications by thoroughly studying performance standards, requirements and technical studies.
  • Delivered public presentations to provide plans and updates on projects.
  • Trained and managed drafters, junior engineers and surveyors.
  • Promoted teamwork and demonstrated effective communication skills to improve collaboration among personnel.
  • Identified needed parts to keep equipment in top operating condition.
  • Monitored and evaluated engineering performance to recommend improvements.

Education

Secondary School Education -

Junipers Academy
Karachi
2000.01 - 2013.08

High School Diploma -

Bahria College
Karachi
2013.12 - 2015.12

Bachelor of Science - Applied Physics Specialization In Electrical

University Of Karachi
Karachi
2016.01 - 2019.12

Master of Science - Applied Physics Specialization In Signals, Systems

University of Karachi
Karachi
2019.01 - 2019.12

Skills

    Project management proficiency

undefined

Software

Microsoft Office

Interests

Space X

Microsoft

Google

Timeline

Senior Engineer

Power Technology Pvt Limited
2022.11 - Current

Production Associate

Channel Textile Pvt Ltd - Karachi, PK
2022.01 - 2022.07

Engineer Trainee

Feroze 1888 Textile Mill Pvt Limited
2020.06 - 2021.10

Engineering Intern

Toyota Indus - Indus Motor Company Limited
2019.03 - 2019.06

Master of Science - Applied Physics Specialization In Signals, Systems

University of Karachi
2019.01 - 2019.12

Bachelor of Science - Applied Physics Specialization In Electrical

University Of Karachi
2016.01 - 2019.12

High School Diploma -

Bahria College
2013.12 - 2015.12

Secondary School Education -

Junipers Academy
2000.01 - 2013.08
Ashad AkbarEngineer