Summary
Overview
Work History
Education
Certification
Key Clients
Awards
Activities
Timeline
Manager
Ali Nawaz

Ali Nawaz

Certified API Inspector (API 510, API 570, API 577, API 580) & Certified NDT Level II
Rahim Yar Khan

Summary

To learn and develop the ability of working in a competitive environment for a brilliant career where I could have an opportunity to work enthusiastically for the attainment of organizational objectives.

Overview

13
13
years of professional experience
5
5
Certifications

Work History

Sr. Inspection Engineer

SGS Pakistan
03.2019 - Current
  • External corrosion direct assessment activity physically performed on the marked locations of DCVG survey at MPCL - Daharki Filed
  • Performed Non Intrusive Inspection of pressure vessel at UEP Badin Zone with the aid of latest advance NDT techniques & integrity assessment performed as per API 510
  • Witness of LRUT activity (Shots Qty 200) & performed Integrity assessment of underground pipeline at MPCL - Daharki Filed
  • High Pressure Steam Piping’s Inspection was performed during ATA-2023 at PakGen & Lalpir Power Plant as per guideline of API 570
  • Pressure vessel & HTHA of plant piping inspected during ATA-2023 at Fatima Fert limited Sheikhupura as per guideline of API 510 & API 570
  • HTHA of plant piping inspected during ATA-2023 at Pak Arab Fertilizer Limited Multan as per guideline of API 570
  • At Mari Petroleum Company Limited performed inspection activities & health assessment of underground pipeline through bell holes and witness of LRUT inspection activities as per requirements of API-570
  • ATA-2021 at PFL during HTHA performs a main part in advance NDT i.e
  • Back scattering, Ultrasonic Flaw detection
  • Perform Inspection & Integrity Assessment of critical piping at Qadirpur Gas Field-OGDCL
  • Perform Visual inspection of exposed pipes surface in bell hole at Total PARCO & witness of LRUT inspection activity
  • Third party inspection was carried out at 608 No’s of retrieved pipe line at Uch Gas Field
  • Performed internal/External inspection, witness of UTG, & assessment of pipe line as per requirement of API-570
  • Performed inspection activities of selected piping segment during ATA-2019 at Sinjhoro Gas & Condensate Field (OGDCL)
  • Perform Boroscopy of Gas Turbine at Sui Gas Field-PPL
  • During ATA-2019 from witness of PSV calibration at LOTTE Chemicals
  • During ATA-2019 at Kunnar LPG plant & Oil Field performed inspection activities & health assessment at selected piping spools as per requirements of API-570
  • Third party inspection was carried out at 3570 No’s of retrieved pipe line at Nandpur Gas Field
  • Performed Visual inspection, Sketching of piping segments, Witness of NDT & integrity health assessment performed as pr guide line of API-570 at FRCP Critical piping spool & inter cooler, After cooler Discharge piping segment of Train A, B, & C at Qadir pur gas field
  • (OGDCL)
  • During ATA-2019 at Hala Gas Field (PPL) performed inspection activities & health assessment at selected piping spools as per requirements of API-570
  • Integrity inspection of fuel gas headers (02 no’s) at KAPCO

API & NDT Inspector (NDT Team Lead)

Applus Velosi Integrity & Safety Pakistan Private Limited
08.2014 - 02.2019
  • Lead (planning, execution, Inspection, integrity assessment & reporting) as an API inspection at site
  • Mechanical integrity assessment of Additional dead legs of Sui production (inside/outside fence) at PPL Sui Gas Field
  • Performed Inspection and integrity assessment of 126 dead legs of Production (Inside/Outside fence) at Sui Gas Field, PPL
  • To perform base line survey of well head Feeder line (Well No
  • 95,100 & 101) at Sui Gas Field PPL
  • Mechanical integrity assessment of process plant piping at Gambat south gas processing facility – 01
  • Performed Base line survey of HRL SML Crossover tie in Line at SFGCS PPL Sui Gas Field
  • To perform Mechanical Integrity Assessment of pig launcher, Pig receiver & 14 No’s of wellhead piping and risers at UCH Gas Field OGDCL
  • At Mazarani Gas Field of PPL performed skid piping inspection and mechanical integrity assessment as per API 570
  • Plant piping inspection during ATA-2017 at Sujawal Gas and Condensate Field, Mari Petroleum Company Limited
  • Dead legs inspection as per API 570 inside fence of PPL Sui Gas Field
  • Preparation of Inspection final reports observed finding description, recommend prevention (mitigation) as per API 571 damage mechanism
  • To perform plant piping inspection and Mechanical Integrity Assessment of KPD at Kunnar Gas Field OGDCL
  • Mechanical Integrity Assessment of Wellhead Assembly at Qadirpur Gas field OGDCL Pakistan
  • To perform Mechanical Integrity Assessment of pig launcher and Pig receiver at Qadirpur Gas field OGDCL
  • Mechanical Integrity Assessment of Gas Gathering header at Qadirpur Gas field OGDCL Pakistan
  • To perform inspection of piping and piping component like Valves, Flanges, welding inspection (including welder qualification inspection), and review of gauge calibration, & documents review
  • To perform witness of hydrostatic pressure of Pig receiver after major repair during Mechanical Integrity Assessment
  • Performing visual inspection of welds and conducting inspection of pipe, welding/ construction materials in compliance with company welding procedures
  • Resolving all production/ quality control matters in liaison with the clients
  • Perform pre-shipment inspection of pipe and pipe fittings (all types of Valves, fittings elbows, tees, reducer) at Mari Petroleum Company limited
  • Quality Inspection and Supervision of Pipe line & Plant Piping

QC Inspector

Crescent Steel and Allied Products Limited (CSAPL)
09.2013 - 07.2014
  • Company Overview: Manufacturing of large diameter spiral welded (SAW) pipes and applying 3 layers PE/PP coating as per API-5L, DIN 30670, DIN 30678
  • Incoming coil inspection
  • Visual inspection of pipe as per API 5L
  • On line Ultrasonic testing by KRAUTKRAMER USPC 2100
  • Portable Ultrasonic testing by USL32, USM35, USM 35X, EPOCH 600 & USM GO+
  • Welding visual inspection
  • Fluoroscopy and End X ray of pipe
  • Pipe repaired according to RT inspector marking
  • Verification end bevel angle of pipe
  • Verification of pipe hydro test
  • Prepare and verify RT film processing chemicals
  • Manufacturing of large diameter spiral welded (SAW) pipes and applying 3 layers PE/PP coating as per API-5L, DIN 30670, DIN 30678

QC Inspector

Data Steel Pipes Industries Private Limited
08.2011 - 08.2013
  • Company Overview: Manufacturing of large diameter spiral welded (SAW) pipes and applying 3 layers PE/PP coating as per API 5L, DIN 30670, DIN 30678
  • Incoming coil inspection
  • On line Ultrasonic testing by KRAUTKRAMER USPC 2100
  • Portable Ultrasonic testing by USL32, USM35
  • Welding visual inspection, straightness, out of roundness and edge of plate offset
  • Fluoroscopy and End X ray of pipe
  • RT film review and defect marking
  • Pipe repaired according to RT inspector marking
  • Verification of pipe hydro test
  • Inspection of bare material before coating application
  • Preheating temperature monitoring and maintain as per procedure/specification
  • Conduct chloride test before and after applying chromate
  • Monitoring of holiday testing, calibration of online holiday equipment and also rectification of other coating defects
  • Manufacturing of large diameter spiral welded (SAW) pipes and applying 3 layers PE/PP coating as per API 5L, DIN 30670, DIN 30678

Education

B.Tech Pass - Mechanical Technology

Govt. College of Technology

DAE - Mechanical Technology

Govt. College of Technology

Matriculation - undefined

Govt. High School Roshan Bhait

B.Tech Honors. - Mechanical Technology

Dadabhoy Institute of Higher Education

Certification

Certified API Inspector (API 510)

Key Clients

  • OGDCL (Oil and Gas Development company Limited)
  • PPL (Pakistan Petroleum Limited)
  • MPCL (Mari Petroleum Company Limited)
  • LPL (Lalpir Power Limited)
  • PSO (Pakistan State Oil)
  • EVTL (Engro Vopak Terminal Limited)
  • UEP (United Energy Petroleum)
  • FFT (Fatima Fert Limited)
  • Shell (Shell Pakistan Pvt. Ltd.)
  • PVE (Pakistan Vehicle Engineering)
  • SSGC (SUI Southern Gas Company Limited)
  • PRL (Pakistan Refinery Limited)
  • YTML (Younus Textile Mill Limited)
  • ASML (Aisha Steel Mill Limited)
  • KICT (Karachi International container terminal)
  • OMV (OMV)
  • PARCO (Pak Arab Refinery Limited)
  • GSK (Glaxo Smith Kline)
  • FFBL (Fauji Fertilizer Bin Qasim limited)
  • KAPCO (Kot Addu Power Company Limited)
  • PFL (Pak Arab Fertilizer Limited)
  • FFCL (Fatima Fertilizer Company Limited)
  • SPP (Saif Power Plant)

Awards

  • Safe worker of the year award, 2016, Applus Velosi
  • Spot Recognition
  • 02/2021
  • 05/2022
  • 03/2023
  • 08/2023
  • SGS Pakistan

Activities

  • 1st position Javelin throws in Govt. College of Technology Rahim Yar Khan.
  • 3rd Position Javelin throws in Inter Zone Multan.
  • 2nd Position Javelin throws in South Zone Lahore.

Timeline

Sr. Inspection Engineer

SGS Pakistan
03.2019 - Current

API & NDT Inspector (NDT Team Lead)

Applus Velosi Integrity & Safety Pakistan Private Limited
08.2014 - 02.2019

QC Inspector

Crescent Steel and Allied Products Limited (CSAPL)
09.2013 - 07.2014

QC Inspector

Data Steel Pipes Industries Private Limited
08.2011 - 08.2013

B.Tech Pass - Mechanical Technology

Govt. College of Technology

DAE - Mechanical Technology

Govt. College of Technology

Matriculation - undefined

Govt. High School Roshan Bhait

B.Tech Honors. - Mechanical Technology

Dadabhoy Institute of Higher Education
Ali NawazCertified API Inspector (API 510, API 570, API 577, API 580) & Certified NDT Level II