Sr. Inspection Engineer
SGS Pakistan
03.2019 - Current
External corrosion direct assessment activity physically performed on the marked locations of DCVG survey at MPCL - Daharki Filed
Performed Non Intrusive Inspection of pressure vessel at UEP Badin Zone with the aid of latest advance NDT techniques & integrity assessment performed as per API 510
Witness of LRUT activity (Shots Qty 200) & performed Integrity assessment of underground pipeline at MPCL - Daharki Filed
High Pressure Steam Piping’s Inspection was performed during ATA-2023 at PakGen & Lalpir Power Plant as per guideline of API 570
Pressure vessel & HTHA of plant piping inspected during ATA-2023 at Fatima Fert limited Sheikhupura as per guideline of API 510 & API 570
HTHA of plant piping inspected during ATA-2023 at Pak Arab Fertilizer Limited Multan as per guideline of API 570
At Mari Petroleum Company Limited performed inspection activities & health assessment of underground pipeline through bell holes and witness of LRUT inspection activities as per requirements of API-570
ATA-2021 at PFL during HTHA performs a main part in advance NDT i.e
Back scattering, Ultrasonic Flaw detection
Perform Inspection & Integrity Assessment of critical piping at Qadirpur Gas Field-OGDCL
Perform Visual inspection of exposed pipes surface in bell hole at Total PARCO & witness of LRUT inspection activity
Third party inspection was carried out at 608 No’s of retrieved pipe line at Uch Gas Field
Performed internal/External inspection, witness of UTG, & assessment of pipe line as per requirement of API-570
Performed inspection activities of selected piping segment during ATA-2019 at Sinjhoro Gas & Condensate Field (OGDCL)
Perform Boroscopy of Gas Turbine at Sui Gas Field-PPL
During ATA-2019 from witness of PSV calibration at LOTTE Chemicals
During ATA-2019 at Kunnar LPG plant & Oil Field performed inspection activities & health assessment at selected piping spools as per requirements of API-570
Third party inspection was carried out at 3570 No’s of retrieved pipe line at Nandpur Gas Field
Performed Visual inspection, Sketching of piping segments, Witness of NDT & integrity health assessment performed as pr guide line of API-570 at FRCP Critical piping spool & inter cooler, After cooler Discharge piping segment of Train A, B, & C at Qadir pur gas field
(OGDCL)
During ATA-2019 at Hala Gas Field (PPL) performed inspection activities & health assessment at selected piping spools as per requirements of API-570
Integrity inspection of fuel gas headers (02 no’s) at KAPCO
Lead (planning, execution, Inspection, integrity assessment & reporting) as an API inspection at site
Mechanical integrity assessment of Additional dead legs of Sui production (inside/outside fence) at PPL Sui Gas Field
Performed Inspection and integrity assessment of 126 dead legs of Production (Inside/Outside fence) at Sui Gas Field, PPL
To perform base line survey of well head Feeder line (Well No
95,100 & 101) at Sui Gas Field PPL
Mechanical integrity assessment of process plant piping at Gambat south gas processing facility – 01
Performed Base line survey of HRL SML Crossover tie in Line at SFGCS PPL Sui Gas Field
To perform Mechanical Integrity Assessment of pig launcher, Pig receiver & 14 No’s of wellhead piping and risers at UCH Gas Field OGDCL
At Mazarani Gas Field of PPL performed skid piping inspection and mechanical integrity assessment as per API 570
Plant piping inspection during ATA-2017 at Sujawal Gas and Condensate Field, Mari Petroleum Company Limited
Dead legs inspection as per API 570 inside fence of PPL Sui Gas Field
Preparation of Inspection final reports observed finding description, recommend prevention (mitigation) as per API 571 damage mechanism
To perform plant piping inspection and Mechanical Integrity Assessment of KPD at Kunnar Gas Field OGDCL
Mechanical Integrity Assessment of Wellhead Assembly at Qadirpur Gas field OGDCL Pakistan
To perform Mechanical Integrity Assessment of pig launcher and Pig receiver at Qadirpur Gas field OGDCL
Mechanical Integrity Assessment of Gas Gathering header at Qadirpur Gas field OGDCL Pakistan
To perform inspection of piping and piping component like Valves, Flanges, welding inspection (including welder qualification inspection), and review of gauge calibration, & documents review
To perform witness of hydrostatic pressure of Pig receiver after major repair during Mechanical Integrity Assessment
Performing visual inspection of welds and conducting inspection of pipe, welding/ construction materials in compliance with company welding procedures
Resolving all production/ quality control matters in liaison with the clients
Perform pre-shipment inspection of pipe and pipe fittings (all types of Valves, fittings elbows, tees, reducer) at Mari Petroleum Company limited
Quality Inspection and Supervision of Pipe line & Plant Piping
QC Inspector
Crescent Steel and Allied Products Limited (CSAPL)
09.2013 - 07.2014
Company Overview: Manufacturing of large diameter spiral welded (SAW) pipes and applying 3 layers PE/PP coating as per API-5L, DIN 30670, DIN 30678
Incoming coil inspection
Visual inspection of pipe as per API 5L
On line Ultrasonic testing by KRAUTKRAMER USPC 2100