Summary
Overview
Work History
Education
Skills
Accomplishments
Additional Information
Timeline
Hi, I’m

Mujtaba Ali Arab

Mujtaba Ali Arab

Summary

Manager Electrical Maintenance | Electrical Equipment Testing | Project Management | ISO 9001 | IEC 62443 | Google certified Project Manager | OT Cyber Security | Nuclear Industry

Overview

22
years of professional experience

Work History

OT Cyber Security, 325MW Chashma Nuclear Power Plant, Mianwali

Manager Electrical Maintenance | Equipment Commissioning
08.2019 - Current

Job overview

  • Dynamic and results-driven Electrical Engineer with a proven track record in 325MW Chashma
  • Nuclear Power Plant electrical maintenance
  • Armed with a comprehensive understanding of electrical systems, control systems, and machinery specific to power generation, I bring a wealth of expertise in ensuring the reliability, efficiency, and safety of critical infrastructure
  • Adept at executing preventive maintenance programs, troubleshooting complex electrical issues, and leading cross-functional teams to deliver optimal performance
  • Possess a Bachelor's degree in Electrical Engineering with post graduation, professional licensure, and a commitment to staying abreast of industry advancements
  • Known for strong analytical and problem-solving skills, along with excellent communication and leadership abilities
  • Seeking to leverage my experience and skills in a challenging role where I can contribute to the success and continuous improvement of electrical systems in a dynamic work environment
  • Key Assignments Supervised multiple jobs related to Electrical Maintenance for 6 x RFOs for unit and unit 2
  • Oversaw of oil changing on main transformer of 400MVA
  • Supervised new winding of multiple motors of various sizes
  • Oversaw testing of 350Hz permanent magnet pilot exciter of main generator during RFO
  • Installation and commissioning of new Differential relay SPAM 150C on 4.5MW RCP Motor
  • Successfully led installation and functional testing of SIEMENS-SIPROTEC 47VU68 high-speed bus transfer device (HSBT) on MV system Contributed to the green energy drive by designing 400KW grid tie inverter solar systems for office sites/
  • Parking areas, demonstrating the financial and environmental benefits Oversaw installation, configuration, and functional testing of SIEMENS 440/430 VFDs and 200kW INVT VFDs, ensuring optimized performance
  • Installation and configuration of Motor control center based on Siemens PLC
  • Overhauling, cleaning of Main generator stator and rotor cooling water system components
  • Demonstrated expertise in testing and troubleshooting of solenoid valves, meeting tight deadlines
  • Commissiong of new waste water treatment facility based on Siemens PLC
  • Burn out Carbon brush removal, installation of Main generator of 325MVA
  • Installation and configuration of Hikvision CCTV system for boundary wall with external encryption module with DC battery bank for each Camera
  • Installation and configuration of new Fire Alarm and extinguishing system
  • Risk assessment of Supcon DCS system installed for waste water system using IEC 62443 and ISO 27001 standards
  • Asset management of PLCs, Controllers and DCS systems as per IEC 62443 standard
  • Coordination and team work with external OT Auditors
  • Team: 25 x Engineers and Technicians.

MW Chashma Nuclear Power Plant

08.2019 - Current

Job overview

  • Mianwali | Country: Pakistan
  • Nuclear Industry OT Expert:
  • As a pro Cybersecurity Auditor and Governance, Risk Management, and Compliance (GRC) Expert, I performed a pivotal function in fortifying the organization`s virtual infrastructure and making sure regulatory compliance, with a selected recognition on ISO 27001-27005, NIST, IEC 62443, IAEA Nuclear series 33-T Guidelines and the auditing/
  • Implementation of Operational Technology (OT) environments
  • Main Responsibilities: Conducted Comprehensive Cybersecurity Audits:
  • Led and finished stop-to-stop cybersecurity audits, aligning with ISO 27001-27005 and NIST requirements, to evaluate the effectiveness of protection controls, hazard control approaches, and compliance frameworks
  • Applied IEC 62443 requirements to mainly audit and decorate the safety of OT environments, addressing the specific demanding situations related to commercial manipulate systems
  • GRC Frameworks Development and Implementation:
  • Spearheaded the improvement and implementation of Governance, Risk Management, and Compliance frameworks, integrating ISO 27001-27005, NIST, and IEC 62443 requirements
  • Ensured seamless integration of GRC approaches into each day operations, fostering a lifestyle of non-stop compliance and hazard focus throughout OT domains
  • Regulatory Compliance Management:
  • Successfully controlled compliance with enterprise-unique rules like IEC 62443, demonstrating a proactive and adaptable approach
  • Maintained a complete information of evolving cybersecurity and facts safety laws, incorporating them into the compliance framework
  • Risk Assessment and Mitigation:
  • Conducted in-intensity hazard assessments, leveraging ISO 27005/IEC 62443 guidelines, to identify, analyze, and prioritize capability threats and vulnerabilities
  • Collaborated with cross-practical groups to enforce hazard mitigation strategies, improving the organization's resilience to cyber threats in OT environments
  • Security Awareness, Training, and Standards Adherence:
  • Developed and brought cybersecurity focus programs, incorporating ISO 27001-27005 and NIST guidelines, to train personnel on protection quality practices
  • Ensured adherence to enterprise requirements, supplying focused schooling on IEC 62443 for OT groups to decorate their information and reaction to cybersecurity demanding situations
  • Incident Response and Crisis Management:
  • Formulated and finished incident reaction plans, aligning with NIST guidelines, making sure fast and powerful responses to protection incidents in OT realms
  • Collaborated with IACS and OT groups to manipulate crises, minimizing impact, and making sure compliance with incident reporting necessities and requirements
  • Summary: My tenure at public sector has not only strengthened my technical expertise in cybersecurity posture improvement in OT domains but has also honed my strategic thinking and leadership skills in the realm of
  • Governance, Risk Management, and Compliance.

MW Chashma Nuclear Power Plant | 137MW Kanupp Nuclear Plant

Junior Engineer
02.2016 - Current

Job overview

  • City: Mianwali | Country: Pakistan
  • Key Assignments/Projects: Insulation Resistance, Winding DC resistance Test, Transformer turn ratio test, DC Leakage test, capacitance and dissipation factor test of 400 MVA Transformer
  • Insulation Resistance, Winding DC resistance Test of 4.5MW RCP Motor on NI Side
  • Insulation Resistance, Winding DC resistance Test, of 3.7MW EDG
  • Current Injection testing using OMICRON equipment for SPAM150C Motor Relay, SPAJ142C OC/Earth Fault
  • Relay, SPAD346C differential Relay, RCS 885G and 985TM relays on Generator and Transformers, Micom P546
  • P443 Relays on 220KV TX Lines, REM 545 relays on EDG.

shift engineer
01.2002 - 01.2005

Job overview

  • Routine Maintenance of 220V DC and 48V DC battery bank.Documentation: Preparation of SOPs, procedures, work request and work authorization management and call up card preparation
  • Standards: Working as per NFPA 70B and IEC-60300/ISO-13374 standards
  • Training and education of standards to team members
  • Oversaw Replacement of condenser tubes during plant shutdown
  • Routine inspection and oversee maintenance of RBV fans on NI side
  • To oversee cold nitrogen based valve replacement activity on NI
  • Worked as shift engineer for helium leakage detection on NI side., in heavy water upgradation plant during shutdowns
  • (137MW Kanupp) Oversaw RCP pump seal replacement in Kanupp 137MW Candu based system
  • Operation: Operation of 132kV Auxiliary Substation
  • Operation of Generator system and steam turbine system during startup and shutdown of Plant
  • Worked with other divisions for leak detection on NI side of heavy water in Candu Based systems
  • Oversaw Overhauling of 137MW Kanupp Steam Turbine, Made: HitachiOvesaw UAT of Fukushima Emergency Engine Diesel Generators Installed on Top Floor of Turbine Hall
  • Testing and routine operation of Sea water emergency water pump based on trolley connected diesel generator
  • Oversaw Testing and overhauling of emergency lighting diesel generators of 1MW.

Education

UET

BS from Electrical Engineering
12 Sep 2014

CHASCENT Chashma

PGTP from Power Technology
2 Jul 2017

Allama Iqbal Open University

Leadership and Management Course

Skills

  • SGS
  • City:
  • Islamabad Country: Pakistan
  • 4/5
  • Other language(s):
  • English
  • LISTENING B1 READING B1 WRITING B1
  • SPOKEN PRODUCTION B1 SPOKEN INTERACTION B1
  • Pen Testing Training
  • IST
  • OSCP
  • NUST
  • LANGUAGE SKILLS
  • Mother tongue(s): Urdu
  • Levels: A1 and A2: Basic user; B1 and B2: Independent user; C1 and C2: Proficient user
  • DIGITAL SKILLS
  • Microsoft Office / AutoCad 2D -3D / Microsoft Powerpoint / Microsoft Excel / Microsoft Word / Google Docs
  • Matlab/Simulik / C Language / Javascript(Nodejs, ExpressJs) / Assembly (Assembly language) / ETAP power
  • System analysis / DIALuxEVO / Other: Microsoft Office, Vision & Project Applications / Industrial protocols
  • (Modbus RTU and TCP) / Basic network / PScad Software
  • HOBBIES AND INTERESTS
  • Hobbies
  • Swimming
  • Travelling
  • Table tennis
  • Outdoor Activities (Sports, Trekking and Hiking)
  • Google surfing
  • MANAGEMENT AND LEADERSHIP SKILLS
  • Leadership Skills
  • AIOU Leadership Course
  • 4 x 4Q Leadership Courses
  • One week survival and Leadership Bootcamp
  • 5/5

Accomplishments

  • KPI: Defining KPIs to achieve maximum efficiency
  • Procurement: Procurement of electrical spares using, spot, committee and tender purchase
  • QAD Coordination: Coordination with Quality Assurance Division to achieve quality as defined by Plant quality
  • Objective
  • Planning: Planning and documentation of Corrective and preventive plans
  • Electrical Design Engineer
  • AlFanar KSA [ 2 Feb 2015 – 2 Feb 2016 ]
  • City: Lahore | Country: Pakistan
  • Protection Design Engineer: Design of HV substations with respect to the scope of work and Project technical specifications (PTS) considering post bid and pre-bid clarifications
  • Preparation of Base Design Package: Review of Main Switching One Line Diagram (132kV, 33KV, 13.8KV) Review of Protection Logic Diagram (132kV, 33KV, 13.8KV) Interlock Logic Plan (GIS, AIS) Automatic Bus transfer Schemes (ABTS) Automatic Capacitor Control Schemes (ACCS) Sequence of Events (SOE) Point List, Transient Fault Recorder (TFR) Point List, SAS Point Lists & Annunciation
  • Point list etc
  • Preparation of Detail Design Package: Preparation and Review of 132kV Protection and Control Panels Schematics (Line, Transformer, Busbar protection, Tap Changers, Capacitor Bank Protection, bus transfer schemes etc.) with respect to SEC
  • Standards/PTS requirement
  • Preparation Detailed comments and Review of 132KV GIS Vendor data Preparation Detailed comments and Review of 132/13.8KV Power Transformer, OLTC and Local Control
  • Panels Review of Automatic Meter Reading Panel with respect to Power Quality and Revenue Metering requirement Review of TFR Panel and SAS Interface Panel Review of 33kV/13.8kV MV Switchgear schematics Review of TFR Interface & Communication Interface Drawings, Protection Signaling Equipment (PSE) etc
  • Complete System Engineering i.e
  • Interfacing of Protection Panels, LCC, RTCC, LCP, TFR, PSE Panels MV
  • Switchgear etc
  • Preparation of Control Cable Schedule and Cable BOQ for Substation Implementation of design philosophy with respect to busbar arrangement i.e
  • Double busbar scheme onV level.5 Modification of Remote End Substations feeders with respect to the scope of work
  • Prepare As-built drawings based on the site markups and submit them to client
  • Project planning of all in-progress substations based on the contractor’s target dates
  • Ensure compliance to QMS procedure and provide regular feedback of project progress to Engineering
  • Manager
  • Projects:
  • 380kV GIS Substation
  • 132kV GIS Substation
  • 132/13.8KV SS AL MAROOJ, KSA
  • 132/13.8KV SS AL HAYER, KSA
  • 132/13.8kV SS AL FLAJ, KSAV Remote End Modifications
  • Over all 5 remote end modifications under above mentioned Projects
  • One 33 kV substation with modification scope
  • Designing of Bus Bar protection Scheme for Al-Rawdah and Al-Nawdah Substation using REB500 Relay
  • Design Team Member for Substation at TAPA Ahmed bag Substation Kapisa Afghanistan
  • Design Study of 132 kV Shalimar GIS Substation Lahore Pakistan including Control, Relay and LCC Panels
  • Designing of Office Lighting on Dialux EVO
  • Power System Analysis Work:
  • Insulation Coordination Study of AL-Muajiz GIS Substation Yanbu Saudia Arabia, on PS CAD Including, Fast Front and Very Fast Front Overvoltage Analysis
  • Ferro resonance Analysis and Transient Recovery Voltage Analysis
  • Temporary OV (1 L-G Fault, Load Rejection) analysis
  • Switching OV (Line Energization, Line Energization and De Energization) Analysis
  • Internee
  • Hammad Engineering [ 1 Jul 2013 – 31 Jul 2013 ]
  • City: Lahore | Country: Pakistan
  • Distribution Transformer Manufacturing Industry
  • STANDARDS FOLLOWED
  • International Electrical Standards Experience

Additional Information

  • ISO 27001, 27005, 27031

Timeline

Manager Electrical Maintenance | Equipment Commissioning

OT Cyber Security, 325MW Chashma Nuclear Power Plant, Mianwali
08.2019 - Current

MW Chashma Nuclear Power Plant
08.2019 - Current

Junior Engineer

MW Chashma Nuclear Power Plant | 137MW Kanupp Nuclear Plant
02.2016 - Current

shift engineer

01.2002 - 01.2005

UET

BS from Electrical Engineering

CHASCENT Chashma

PGTP from Power Technology

Allama Iqbal Open University

Leadership and Management Course
Mujtaba Ali Arab